General Info

Business Logo

City of Fairborn, OH

44 W Hebble Ave,, Fairborn,, OH 45324
(937) 754-3055

The Engineering Division plans, designs, maintains, and manages all infrastructure within the City rights-of-way in order to provide the general public with safe, efficient, and quality roadways, sidewalks, utilities, and mapping (GIS) information.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Spangler Road Bridge Repairs Project
• Removal of deteriorated concrete and patching of bridge structure • Field painting railing anchor bolts • Installing Composite fiber wrap system • Install new drip strip on bridge
04/19/2022 05:00 PM UTC
2021 Traffic Signal Upgrade Project
This project involves the complete reconstruction of two outdated traffic signals within the City of Fairborn. The traffic signals are located at the Broad Street / Highview Drive intersection and the Doris Drive / Maple Avenue intersection. The proposed traffic signals will include the following improvements: black signal supports with mast arms, new signal cabinets and controllers with UPS battery backup, LED vehicular signals with backplates, radar detection, LED countdown pedestrian signals, and audible pedestrian pushbuttons.
12/10/2021 04:10 PM UTC
Circle Drive Drainage Improvements
• Removal / Replacement of: miscellaneous curbing and sidewalk, including sawing and asphalt patching • Installation of stormwater pipe, catch basins, manholes, headwalls and other storm structures and appurtenances • Installation of curb ramps. • Minor waterline relocation.
11/05/2021 05:00 PM UTC
2022 Curb, Sidewalk, and ADA Ramp Program
• Removal of: Misc. concrete (4”, 6”, 8”) • Removal / Replacement of: Curbing (Including Sawing and Patching) • Installation of: Concrete sidewalk (4”, 6”) • Installation of: Concrete drive approaches (4”, 6”) • Installation of curb ramps, approximately twenty-three (23) ramps at various locations
07/02/2021 05:00 PM UTC
Maple Avenue Improvements - Phase 2 PID 106311
- Construct 10’ wide separated multi-use path on the west side of Maple Avenue from Doris Drive to East Dayton Yellow Springs Rd - Install a 12" waterline from Doris Drive to East Dayton Yellow Springs Rd - Narrow the existing roadway pavement and reconstruct the curb line and install new storm infrastructure. DBE Goal: 8%
05/07/2021 05:00 PM UTC
Colonel Glenn Highway Enhancement Project
- Construct 10’ wide separated multi-use path on the north side of Colonel Glenn Highway - Install new sidewalk on the south side of Colonel glenn Highway - Install new drainage infrastructure - Install streetscape and and landscape elements DBE Goal: 7%
05/07/2021 05:00 PM UTC
Yellow Spring Fairfield Improvements PID 101498
- Construct 10’ wide separated multi-use path on the south side of Yellow Springs Fairfield Road - Widen the roadway at Black Lane for left turn lanes - Construct new curb and gutter the length of the project and perform roadway grading for drainage - Install new RRFB signals at all major intersections - Resurface and restripe the entire roadway DBE Goal: 8%
05/15/2020 02:00 PM UTC
11 - 17 of 17 Solicitations
2 Next →