General Info

Business Logo

City of Fairborn, OH

44 W Hebble Ave,, Fairborn,, OH 45324
(937) 754-3055

The Engineering Division plans, designs, maintains, and manages all infrastructure within the City rights-of-way in order to provide the general public with safe, efficient, and quality roadways, sidewalks, utilities, and mapping (GIS) information.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Bid No. 25-07 - 2025 Maple Ave. Pavement Repairs Project
This project involves work on Maple Ave. south of Doris Drive. It will cover the northbound lane and a portion of the center lane, with a total width of approximately 17 feet and a total length of approximately 580 feet. The following items will be included in the work: • Removal of existing pavement and base to a depth of 15 inches • Installation of new base and asphalt materials (see attached cross-section drawing), consisting of: 6” of 304 gravel 6” of 302 asphalt 1.75” of 448 Type 2 intermediate asphalt 1.25” of 448 Type 1 surface asphalt • Installation of 6” sleeved underdrain and connection to catch basin. No. 57 aggregate installed around underdrain per attached detail. • Installation of geogrid • Subgrade compaction • Proof roll (as needed) • Excavation of subgrade (as needed) • Maintenance of traffic (see attached traffic control plan map) • Thermoplastic pavement markings
07/11/2025 05:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Yellow Spring Fairfield Improvements PID 101498
- Construct 10’ wide separated multi-use path on the south side of Yellow Springs Fairfield Road - Widen the roadway at Black Lane for left turn lanes - Construct new curb and gutter the length of the project and perform roadway grading for drainage - Install new RRFB signals at all major intersections - Resurface and restripe the entire roadway DBE Goal: 8%
05/15/2020 02:00 PM UTC
21 - 21 of 21 Solicitations
1 3 Next →