General Info

Business Logo

City of Fairborn, OH

44 W Hebble Ave, Fairborn, OH 45324-4902
(937) 754-3005

Welcome to the Fairborn, OH Bid Express site. Fairborn is home to almost 35,000 residents, is a neighbor to Wright-Patterson Air Force Base, and is home to Wright State University. 

Please see below for our upcoming, open, and closed bid solicitations. 

Please call the finance department at 937-754-3005 for specific questions relating to the bidding process. 
For other department specific contact information, please visit www.fairbornoh.gov, hover over 'Government' and visit the page for the department you are looking to contact. 

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Bid No. 26-18 - Kauffman Ave. / Dayton Yellow Springs Rd. Concrete Repairs
This project includes concrete pavement repair work along Kauffman Ave. from Gilbert Ave. to the end of the existing concrete pavement, approximately 600 ft. south of Rice Blvd. Some repairs are also planned for the concrete portion of Dayton Yellow Springs, east of the Kauffman and Dayton Yellow Springs Intersection. There are approximately 62 areas planned for concrete pavement repair/replacement. The repair areas vary in size. The Contractor shall complete the work in accordance with the current Fairborn and Ohio Department of Transportation (ODOT) Construction and Material Specifications, applicable ODOT standards and specifications, and the project requirements included in the solicitation. Photos of each identified repair location, along with approximate dimensions of the repair areas, are included with the bid documents for reference. The dimensions shown are approximate and the photos are to be used for reference only. Where existing pavement markings are disturbed or removed as a result of the concrete pavement repairs, the Contractor shall replace the pavement markings with epoxy striping to match the existing markings. The project shall be completed no later than May 31st, 2027.
10/16/2026 05:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Maple Avenue Improvements - Phase 2 PID 106311
- Construct 10’ wide separated multi-use path on the west side of Maple Avenue from Doris Drive to East Dayton Yellow Springs Rd - Install a 12" waterline from Doris Drive to East Dayton Yellow Springs Rd - Narrow the existing roadway pavement and reconstruct the curb line and install new storm infrastructure. DBE Goal: 8%
05/07/2021 05:00 PM UTC
Colonel Glenn Highway Enhancement Project
- Construct 10’ wide separated multi-use path on the north side of Colonel Glenn Highway - Install new sidewalk on the south side of Colonel glenn Highway - Install new drainage infrastructure - Install streetscape and and landscape elements DBE Goal: 7%
05/07/2021 05:00 PM UTC
Yellow Spring Fairfield Improvements PID 101498
- Construct 10’ wide separated multi-use path on the south side of Yellow Springs Fairfield Road - Widen the roadway at Black Lane for left turn lanes - Construct new curb and gutter the length of the project and perform roadway grading for drainage - Install new RRFB signals at all major intersections - Resurface and restripe the entire roadway DBE Goal: 8%
05/15/2020 02:00 PM UTC
31 - 33 of 33 Solicitations
1 2 4 Next →