General Info

Business Logo

The University of Toledo, OH

2801 W Bancroft St 2925 East Rocket Drive, Toledo, OH 43606-3328
(419) 530-1427

The University of Toledo is one of just 27 public research universities in the country to offer such a comprehensive menu of academic options - 230+ undergraduate and graduate degree programs across the arts, business, education, engineering, law, medicine, natural sciences, nursing, and pharmacy. At UToledo, it's all about the possibilities and opportunities. No limitations.

At The University of Toledo, we are driven to think smarter, tackle challenges and improve lives. We are renowned for research in the areas of astronomy and astrophysics; solar energy, water quality and sustainable technologies; and cell architecture and dynamics. Other areas of unique distinction include human trafficking, disability studies, hypertension and precision medicine.

UToledo has 20 academic programs - including undergraduate, graduate, online, and professional programs that are nationally ranked by U.S. News & World Report.

UToledo is ranked among the top 100 public universities in the latest Wall Street Journal/Times Higher Education Rankings.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
1140-22-1922
The Swan Creek Restoration Project is located north of the University of Toledo Medical Center, on University of Toledo owned land. The site includes Swan Creek floodplain wetlands, and wooded slopes up to Arlington Avenue. The work includes log jam removal and the construction of three rock riffles within Swan Creek, placement of single boulders for habitat, repair of 90 linear feet of severely eroded bank, restoration of 0.5-acre of wetland habitat, invasive species management, native plantings, minor earth work along 2,700 linear feet of Swan Creek, and the installation of a series of post-assisted log structures within a small tributary to Swan Creek.
08/04/2026 06:00 PM UTC
0080-26-063
Nitschke Hall Roof Replacement
08/11/2026 06:00 PM UTC
5017-26-055
Renovations to the Center for Creative Education 2nd Floor IT Office Suite.
08/11/2026 06:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
0073-26-049
CVA Boiler Replacement Replacement of three (3) heating water boilers and associated boiler circulation pumps, near boiler piping, and domestic water heating components.
07/14/2026 06:00 PM UTC
5006-26-1942
DCC CT Sim_Mammography at Dana Cancer Center on UTMC Campus. Project is alteration of existing space to become new diagnostic imaging space. Project includes all major trades.
06/09/2026 06:00 PM UTC
0016-26-039
The University of Toledo, Student Union Renovations to portions of the existing Student Center to refresh existing spaces, create a new student lounge, and add a sprinkler system in areas currently without
06/02/2026 06:00 PM UTC
1130-26-040
Elevator replacements at Carlson Library on Main Campus, and University Medical Center on the Health Science Campus.
05/26/2026 06:00 PM UTC
5002-26-044
Creation of a student lounge on the first floor of the Mulford Annex
04/28/2026 06:00 PM UTC
5004-26-1941 REBID
Combining two rooms into one to accommodate new nuclear medicine imaging equipment.
04/14/2026 06:00 PM UTC
1010-26-011
FY27-28 Underground Steam/Condensate Infrastructure Improvements; consists of the installation of approximately 1,200 linear feet of new at-grade tunnel, housing 10-inch high-pressure steam (HPS) piping and 6-inch pressure condensate return (PCR) piping. The project also includes the installation of 1,200 linear feet each of 10-inch chilled water supply and return (CWS/CWR) piping, associated appurtenances , and maintenance of traffic (MOT) planning. Alternate #1 consists of mill and pave Stadium drive at the limits indicated on sheet C-10.
04/14/2026 06:00 PM UTC
5004-26-1941
Combining two rooms into one to accommodate new nuclear medicine imaging equipment.
03/31/2026 06:00 PM UTC
5003-25-1924
Extend existing Reverse Osmosis Automatic Watering System in Health Education Building
03/17/2026 06:00 PM UTC
1130-25-372-3 REBID
Scott, Tucker, and MacKinnon Halls: Window Replacement The project will remove and replace windows in Scott Hall, Tucker Hall, and MacKinnon Hall.
11/18/2025 07:00 PM UTC
1 - 10 of 88 Solicitations
← Previous 1 3 4 5 6 7 8 9