General Info

Business Logo

The University of Toledo, OH

2801 W Bancroft St 2925 East Rocket Drive, Toledo, OH 43606-3328
(419) 530-1427

The University of Toledo is one of just 27 public research universities in the country to offer such a comprehensive menu of academic options - 230+ undergraduate and graduate degree programs across the arts, business, education, engineering, law, medicine, natural sciences, nursing, and pharmacy. At UToledo, it's all about the possibilities and opportunities. No limitations.

At The University of Toledo, we are driven to think smarter, tackle challenges and improve lives. We are renowned for research in the areas of astronomy and astrophysics; solar energy, water quality and sustainable technologies; and cell architecture and dynamics. Other areas of unique distinction include human trafficking, disability studies, hypertension and precision medicine.

UToledo has 20 academic programs - including undergraduate, graduate, online, and professional programs that are nationally ranked by U.S. News & World Report.

UToledo is ranked among the top 100 public universities in the latest Wall Street Journal/Times Higher Education Rankings.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
1140-22-1922
The Swan Creek Restoration Project is located north of the University of Toledo Medical Center, on University of Toledo owned land. The site includes Swan Creek floodplain wetlands, and wooded slopes up to Arlington Avenue. The work includes log jam removal and the construction of three rock riffles within Swan Creek, placement of single boulders for habitat, repair of 90 linear feet of severely eroded bank, restoration of 0.5-acre of wetland habitat, invasive species management, native plantings, minor earth work along 2,700 linear feet of Swan Creek, and the installation of a series of post-assisted log structures within a small tributary to Swan Creek.
08/04/2026 06:00 PM UTC
0080-26-063
Nitschke Hall Roof Replacement
08/11/2026 06:00 PM UTC
5017-26-055
Renovations to the Center for Creative Education 2nd Floor IT Office Suite.
08/11/2026 06:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
1030-22-263
Parking Lot 13 Expansion project will include the creation of surface parking to replace the former west parking ramp. It will include improved aesthetics, landscaping upgrades and the resurfacing of the existing lot 13 paving. The new and existing lots will be combined and reconfigured to improve vehicular traffic and parking on the west side of campus.
09/07/2021 06:00 PM UTC
REBID 1130-21-236
Elevator Safety Repairs and Replacement Project (Various campus buildings) Upgrade, replace, and modernize elevator systems including upgrading and replacing elevator power systems, controller equipment and systems, elevator cars and machine room upgrades, and bringing existing building elevators up to current code requirements.
08/31/2021 06:00 PM UTC
New 0094-21-231
Ottawa East 2021 Dining Expansion project includes expanding the existing seating capacity within the overall dining space, as well as modifications to the existing dining spaces and associated cooking/serving stations.
08/24/2021 06:00 PM UTC
1130-21-236
Elevator Safety Repairs and Replacement Project (Various campus buildings) Upgrade, replace, and modernize elevator systems including upgrading and replacing elevator power systems, controller equipment and systems, elevator cars and machine room upgrades, and bringing existing building elevators up to current code requirements.
08/10/2021 06:00 PM UTC
1130-21-235
Building Automation System Upgrades project will involve replacement of old electronic and pneumatic panels that control heating and cooling. The new controls will automate building schedules and assist in reducing energy use/cost.
07/27/2021 06:00 PM UTC
REBID 5004-21-1876
The MRI Replacement project includes renovations to the MRI suite to coincide with the replacement of the 3T MRI equipment.
07/20/2021 06:00 PM UTC
1130-21-232
Building Envelope/Waterproofing project includes roof replacements and associated work at campus locations: Health Education Building, Bowman-Oddy Labs, Center for Sculptural Studies, Ritter Planetarium. The project also includes window replacement and associated work, and exterior facade cleaning at Ritter Planetarium.
07/20/2021 06:00 PM UTC
1130-21-233
Mechanical System Improvements project will involve replacement of air handlers, exhaust fans, and unitary equipment. Replacements will reduce maintenance, improve indoor air quality, and minimize utility use. Energy reduction and efficiencies will be included. The project will involve several buildings on Main Campus and Health Science Campus.
07/13/2021 06:00 PM UTC
5004-21-1876
The MRI Replacement project includes renovations to the MRI suite to coincide with the replacement of the 3T MRI equipment.
07/06/2021 06:00 PM UTC
5002-21-1872
The Mulford Library Renovation Project will renovate the 4th and 5th Floors of the library. The scope includes the conversion of former stack areas to individual study carrels and group study areas. Renovations will also include the computer lab, public entry and service desk, central resource room, restrooms to address accessibility issues, along with furnishing upgrades.
06/22/2021 06:00 PM UTC
71 - 80 of 88 Solicitations
1 2 3 4 5 6 8