General Info

Business Logo

City of Troy, OH

100 S. Market Street, Troy, OH 45373
(937) 335-1725


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2019-15 South Stanfield Road Reconstruction Phase 2
South Stanfield Road Reconstruction Phase 2 This project will reconstruct approximately 1,400 feet along South Stanfield Road from West Stanfield Road to the North property line of 20 S. Stanfield Road (Tractor Supply), with an Alternate bid design to include further north to the Meijer Shopping Center entrance. This project is a reconstruction of the current four-lane cross-section to a three-lane cross-section, just as in Phase 1. Creating a center turn lane; constructing missing gap sidewalks and shared-use path; with curb, gutter, and sidewalk replacement. Engineers Estimate - $1,560,000.00 Pre-Bid Meeting - N/A State Prevailing Wages
09/12/2024 04:00 PM UTC
Troy Police Department Building Boiler Replacement Project
Troy Police Department Building Boiler Replacement Project This project consists of the replacement of three existing boilers and associated piping. Engineers Estimate - $110,000.00 Pre-Bid Meeting - Wednesday, July 24 at 9:00 a.m. at the Troy Police Department State Prevailing Wages
08/07/2024 04:00 PM UTC
2024-06 Sludge Thickening Tanks Drive Units Replacement Project
Sludge Thickening Tanks Drive Units Replacement Project This project consists of replacing the existing drive units on sludge thickening tanks numbers 1 and 2 with Ovivo W36P drives or equivalent. Engineers Estimate - $340,000 Pre-Bid Meeting - N/A State Prevailing Wages
07/31/2024 04:00 PM UTC
City Hall Roof Restoration Project and Code Upgrade of ANSI SPRI Edge Metal at the Maintenance Facility
City Hall Roof Restoration Project and Code Upgrade of ANSI SPRI Edge Metal at the Maintenance Facility This project consists of: 1. Restoring the roofing system at the Troy City Hall building located at 100 South Market Street, Troy, Ohio. It will be restored with a Polyurea partially reinforced liquid roofing system. 2. Code Upgrade of the ANSI SPRI Edge Metal (coping and metal edging replacement) of the roof of the Central Service and Maintenance Facility at 1400 Experiment Farm Road, Troy, Ohio. Engineers Estimate - $166,000.00 Pre-Bid Meeting - April 17, 2024 City Hall 100 S. Market Street, Troy, Ohio - 9:00 a.m. Maintenance Facility 1400 Experiment Farm Road, Troy, Ohio - 10:00 a.m. State Prevailing Wages
05/01/2024 04:00 PM UTC
2023-008 East Main Street - Broadford Bridge Rehabilitation
East Main Street - Broadford Bridge Rehabilitation This project will reconstruct approximately 750 feet of the Broadford Bridge on East Main Street, over the Great Miami River. The project will include the repair and patching of spalling concrete curb, including traversable area between the curb and guard rail. Engineers Estimate - $247,249.00 Pre-Bid Meeting - N/a State Prevailing Wages
04/17/2024 04:00 PM UTC
2024 Paving Program
2024 Paving Program This project consists of milling and resurfacing of various streets. Engineers Estimate - $1,500,000 State Prevailing Wages
03/20/2024 04:00 PM UTC
Hobart Arena Dehumidifier Replacement Project
Hobart Arena Dehumidifier Replacement Project This project consists of the like for like replacement of the two (2) dehumidifiers that serve the Hobart Arena. Engineers Estimate - $380,000 A pre-bid site walk will be held on Wednesday, February 14, 2024, at 1:00 p.m. at Hobart Arena. A pre-bid meeting will be held via Microsoft Teams on Thursday, February 15, 2024 at 3:00 p.m. to answer any questions arising from the site walk. Questions and answers will be recorded and issued via Bid Addendum, target date Friday, February 16, 2024. State Prevailing Wages
02/28/2024 05:00 PM UTC
PID 116848 MIA - North Elm Street Resurfacing Project
MIA - North Elm Street Resurfacing Project This project consists of the milling and resurfacing of North Elm Street, replacing the striping, and, and installing sharrows through the corridor for a length of 0.38 miles between W. Main Street and the Morgan Ditch Bridge. Engineers Estimate - $431.047.76 Pre-Bid Meeting - N/A Davis-Bacon Prevailing Wages
01/24/2024 05:00 PM UTC
MIA-41-10.32 West Main Street Improvements Phase 2
West Main Street Improvements Phase 2 (PID 110253) This project consist of widening State Route 41 (West Main Street) from I-75 to Ridge Avenue, to include at least on 11' through lane in each direction, reconstructing the sidewalk and curb lawn, replacing the water main and storm sewer, and improving signals and lighting throughout the corridor for 0.80 miles. Engineers Estimate - $7,050,000.00 Davis Bacon Prevailing Wages
11/10/2023 05:00 PM UTC
Troy Police Department Fluid Cooler and Pump Replacement Project
Troy Police Department Fluid Cooler and Pump Replacement Project This project consists of the replacement of the existing cooling tower and the current pumps. Engineers Estimate - $254,000.00 Pre-Bid Meeting - Tuesday, August 15, 2023 at 11:00 a.m. at Troy Police Department, 124 East Main Street, Troy, Ohio 45373 State Prevailing Wages
09/06/2023 04:00 PM UTC
11 - 20 of 56 Solicitations
2 4 5 6