General Info

Business Logo

City of Newark, Ohio

40 West Main Street, Newark, OH 43055
(740) 670-7727


Standard Documents

Name * Description
NewarkStandardConstructionDrawings_July2018.pdf (1.16 MB)
1 Document

Upcoming Solicitations

Number Deadline
LEAD WATER SERVICE LINE REPLACEMENT PROJECT 5
This Project includes 600 lead and/or galvanized water service lines to be replaced. The work will be located within the City of Newark as detailed on the included address lists. The City will provide the Contractor with approximately 160 signed work agreements, the Contractor will be responsible for obtaining approximately 400 signed work agreements from property owners designated by the City. The remaining 40 work agreements will be assigned by the City as needed for leaks throughout the city.
04/29/2024 04:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Waterworks Rd. at Horns Hill Rd. Roundabout and Auxiliary Spillway Project
This project consists of: CONSTRUCTION OF SINGLE-LANE MODERN ROUNDABOUT WITH STORMWATER, LIGHTING, AND TRAFFIC RELATED APPURTENANCES. SHARED-USE PATH W/ MID-BLOCK CROSSWALK NORTH OF ROUNDABOUT. TEMPORARY ACCESS ROADWAY. CONSTRUCTION OF AUXILIARY SPILLWAY AT NEWARK LOW HEAD DAM (CLASS II) Engineer's estimate of probable cost is $1.6 Million An optional pre-bid meeting will be held on Tuesday, April 9, 2024 at 9:00 AM. See Legal Notice for more information.
04/19/2024 04:00 PM UTC
Newark OH - Chemicals - 2024
This is for the PURCHASE of Water/Wastewater Treatment CHEMICALS only. There is one chemical out for bid this year: Potassium Permanganate (KMnO4) The previous contract was with Univar Solutions for a bid price of $2.62/pound
03/15/2024 04:00 PM UTC
Newark OH - Street Materials - 2024
This is for the PURCHASE of Street MATERIALS only.
03/15/2024 04:00 PM UTC
2023-23- Newark Water Plant Lime Removal and Land Application
The work consists of furnishing the equipment, facilities and labor required for removal and disposal of Lime Sludge from Lagoons at the City of Newark Water Treatment Plant, to approved land application sites for the period of 60 months starting on the date of the contract.
12/21/2023 05:00 PM UTC
Lead Service Replacement Project 4
This Project includes 500 lead and/or galvanized water service lines to be replaced. The work will be located within the City of Newark as detailed on the included address lists. The City will provide the Contractor with approximately 200 signed work agreements, the Contractor will be responsible for obtaining approximately 280 signed work agreements from property owners designated by the City. A pre-bid meeting will be held in person at 34 S. 5th St. Newark OH, 43055 and online at http:\\www.tinyurl.com\Newarkconstruction on Wednesday, November 8, 2023 at 1000.
12/07/2023 05:00 PM UTC
2021-18; South Second Street Interceptor Project
A MANDATORY PRE-BID MEETING IS SCHEDULED FOR AUGUST 15TH, 2023, AT 10:00 AM. SEE SECTION 00 10 00 OF THE BID BOOK FOR MORE DETAILS. This Project is located in Newark, Ohio and extends on S. 2nd Street between E. Walnut Street and the South Fork Licking River and on National Drive between S. 4th Street and S. 2nd Street. The Work to be performed includes, but is not limited to, separating combined sewers and constructing new sanitary and storm sewers by means of open-cut, with all associated manholes and appurtenances; replacement and consolidation of potable drinking water piping including all associated valves, hydrants, and appurtenances; replacing streets including curbs, sidewalks, and accessories; pedestrian-friendly features; lighting, and associated components as specified in these contract documents. The Work will include trenchless installation of sanitary sewer pipe underneath the Genesee and Wyoming Railroad. The Work will include the demolition of the existing CSO 1013 structure and construction of a new CSO 1013 structure. The Work will include the demolition of the existing Stop Log Storage Building and construction of a new Stop Log Storage Building. - REVISED PER ADDENDUM NO. 2 Engineer's estimate of probable cost is: $24,122,000 (Base Bid) - REVISED PER ADDENDUM NO. 2 $ 4,256,500 (Alternate Bid) - REVISED PER ADDENDUM NO. 2
09/01/2023 03:00 PM UTC
2023-07; Reddington Park Upgrades - Shelters and Enclosure (ReBid 2)
This project consists of the construction of the following structures and appurtenances: -24'x24' Shelter House -34'x34' Shelter House -10'x14' Porta-Jon Enclosure Architect's estimate of probable cost is $177,000
07/19/2023 04:00 PM UTC
2023-01; Newark Street Resurfacing Project
This project consists of: nearly 100,000 SY of pavement planing, about 10,000 tons of asphalt, almost 5,000 SY of pavement removal, and associated pavement striping. Engineer's estimate of probable cost is $1,600,000.00
06/30/2023 04:00 PM UTC
2021-27; Soldier Pile and Lagging Wall (ReBid)
This project consists of the construction of a soldier pile and timber lagging wall, including all related grading and site work described within the plans. Engineer's estimate of probable cost is $200,000
06/30/2023 04:00 PM UTC
202213 - Eastside Water Transmission Main Project
This project includes approximately 10,500 LF of 16" watermain installation, installed via a combination of open excavation, horizontal directional drilling and jack and bore; Also included is approximately 15,000 SY of chip and seal, 17,000 SY of asphalt overlay and 2,500 SY of asphalt milling. Bids will be opened at noon on Friday, June 23, 2023. The estimated construction cost for the project is $4,401,151.00.
06/23/2023 04:00 PM UTC
1 - 10 of 43 Solicitations
← Previous 1 3 4 5