General Info

Business Logo

City of Newark, Ohio

40 West Main Street, Newark, OH 43055
(740) 670-7727


Standard Documents

Name * Description
NewarkStandardConstructionDrawings_July2018.pdf (1.16 MB)
1 Document

Upcoming Solicitations

Number Deadline
202225 : River Road Reddington Road Sanitary Sewer Replacement Project
This project consists of: Part 1 - Approximately 1700 LF of sanitary sewer including 575 LF of 30" bored casing pipe up to 30' in depth. Also included are associated manholes, laterals and asphalt pavement repair. Alternate 1 (Part 2) - Approximately 1900 LF of sanitary sewer including 160 LF of 30" bored casing pipe up to 30' in depth and 600 LF of storm sewer. Also included are associated manholes, laterals and asphalt pavement repair and decommissioning of existing pump station. Engineer's estimate of probable cost is: Part 1 - $2,081,319.00 Part 2 - $1,742,868.00 Combined - $3,824,187.00
11/08/2024 05:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
RFQ for Consultant Services for Brownfield Remediation at 217 S. 21st St., Newark, OH, 43055
The City of Newark is soliciting qualified firms for the provision of professional services to perform Phase I and Phase II property assessment activities. This work will be done at the former Quality Chemicals Company, 217 S. 21st St., Newark Ohio 43055. See attachment for all information, including; scope of services, where to direct questions, and how to submit a package.
03/07/2023 09:00 PM UTC
2018-22; E. Church St. Enhancement & Alley Rehab Project
This project consists of: streetscaping of one block of street; including sidewalk, lighting, landscaping, hardscaping, curb & gutter, and minor storm work; along with the reconstruction of 3 alleys. Engineer's estimate of probable cost is available in the Bid Documents.
02/13/2023 05:00 PM UTC
2022-02; Concrete Maintenance Project
This project consists of: approximately 190 cubic yards of concrete and associated work for curb ramps, sidewalks, and curbing at various locations. Engineer's estimate of probable cost is available in the Bid Documents.
02/13/2023 05:00 PM UTC
2022-03; 2022 Small Drainage - Stormwater Improvements
This project consists of: approximately 1,000 feet of conduit with associated structures and pavement repairs at 3 separate locations.
12/15/2022 05:00 PM UTC
2022-29; South 11th Street Improvements
This project consists of improvements to approximately 1,000 feet of roadway; including widening for a turn lane and parking areas, as well new sidewalks and minor storm work.
12/15/2022 05:00 PM UTC
2022-3 City of Newark Lead Water Service Replacement #2
This Project includes 200 lead and/or galvanized water service lines to be replaced. The work will be located within the City of Newark Council Ward One as depicted on the attached map entitled Project Area Map – Ward 1.PDF
12/01/2022 03:00 PM UTC
2022-2 City of Newark Thornwood & Faye Drive Booster Pump Stations Project
This Project includes replacement of the existing Thornwood Booster Pump Station located at the intersection of River Road and Thornwood Drive, construction of a new Faye Drive Booster Pump Station at the intersection of Thornwood and Faye Drives, replacement of approximately 2300 LF of 12” watermain along River Road and Thornwood Drive, electrical, instrumentation and controls, and miscellaneous sitework.
08/10/2022 04:00 PM UTC
2022-01; Newark Street Resurfacing Project
This project consists of: pavement planing, asphalt resurfacing, full depth pavement replacement, and associated pavement striping.
07/18/2022 04:00 PM UTC
2022-1 - City of Newark Lead Water Service Line Replacement
This Project includes 400 lead water service lines to be replaced in multiple contracts consisting of 100 or 200 individual services. The work will be located within the City of Newark Council Ward One as depicted on the attached map entitled Project Area Map – Ward 1.PDF
07/14/2022 02:00 PM UTC
Newark OH - Chemicals - 2022
This is for the PURCHASE of Water/Wastewater Treatment CHEMICALS only.
03/04/2022 05:00 PM UTC
21 - 30 of 46 Solicitations
1 3 5