General Info

Business Logo

City of Groveport

655 Blacklick St, Groveport, OH 43125-1208
(614) 830-2067

Groveport, Ohio – Central Ohio's Hometown– is a growing central Ohio suburb in southeastern Franklin County.  The community has a rich history, even predating the opening of the Ohio & Erie Canal in 1831 and the City’s incorporation in 1847.  The community’s historic roots and proud heritage are still evident today.  The immaculately restored Town Hall building at Main & Front Streets is the centerpiece for Groveport’s historic downtown business district. 
 
Quality of life for both residents and businesses continues to be the Mayor and Council’s top priority.  We pride ourselves in providing a state of the art recreation and aquatics center, an excellent arts and education program, a world class golf course, and services for both our children and senior citizens alike.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2021 Alley Drainage Improvement Project: Hickory Alley Storm Sewer
The City of Groveport will receive sealed bids for the 2021 Alley Drainage Improvement Project: Hickory Alley Storm Sewer, until 2:00 p.m. on Friday, July 23, 2021. The City of Groveport will not accept bids after that time. The work for which proposals are invited consists of the furnishing of all labor, materials, equipment and services necessary for construction of various improvements associated with the 2021 Alley Drainage Improvement Project on Hickory and Brook Alleys (the “Project”). Work to include approximately: Removal of existing pavements and drainage structures and pipe along the alley-ways, and placement of approximately 1,050 lineal. ft. of storm sewer pipe, ranging from 4-inch diameter underdrain, to 15-in., 18-in., up to 48-in. diameter, placement of about 13 storm structures, mill and reconstruction of alley pavements requiring the placement of approximately 25 c.y. of asphalt pavement, and 330 s.y. of concrete pavement along with other miscellaneous work. The estimated cost of construction for the work outlined in the plans and specifications is $379,715.00.
07/23/2021 06:00 PM UTC
West Bixby Road Improvement - Phase 2
The City of Groveport will receive sealed bids for the West Bixby Road Improvement - Phase 2 Project until 2:00 p.m. on Friday, April 30, 2021. Base Bid: Part 1 - Bixby Road pavement rehabilitation and Path Improvement – Work to be included in the base bid as ordered by the Council of the City of Groveport: • 9,700 square yards of roadway pavement rehabilitation utilizing full depth pavement reclamation and applying 3.5 inches of item 441 asphalt concrete, being about 930 Cubic Yards • 3,100 feet of an 8-ft wide asphalt paved shared-use path • Misc. roadside drainage improvements including drive culverts and underdrains • Pedestrian warning system assembly • Various pavement striping and signage Part 2 - Bixby Road culvert replacement over Holton Ditch (FRA-CR229-03.45) - Work to be included in the base bid as ordered by the Franklin County Commissioners: Improvements to be included, as ordered by the Franklin County Commissioners, consist of upgrading 0.01 miles of Bixby Road by replacing the existing concrete slab culvert over Holton County Ditch with a new 12’x8’ 4-sided precast concrete box culvert, with foundation support system and headwalls and minimal roadway approach improvements that support the roadway improvement to be constructed in Part 1. Add/Deduct Alternate: Unit prices are requested from the bidder for alternative work for specific pay items in the base bid, as an Add/Deduct Alternate. Work relates to the type of stabilizing agent used in Full Depth Reclamation.
04/30/2021 06:00 PM UTC
2021 Street Maintenance Program
The City of Groveport will receive sealed bids for the 2021 Street Maintenance Program until 2:00 p.m. on Friday, March 26, 2021. The work will include approximately: Base Bid: Mill and overlay of various alleys and streets requiring the placement of approximately 290 c.y. of asphalt pavement, crack sealing, pavement markings, approximately 1,620 s.f. of concrete and brick sidewalk replacement, approximately 440 s.y. of pavement repairs along with other miscellaneous work. The estimated cost of construction for the work outlined in the plans and specifications in the Base Bid is $361,000.00. Add Alternate No. 1: Work to include an additional 2,750 s.y. of asphalt overlay and edge milling on Church Street along with 85 s.y. of concrete alley approaches. The estimated cost of construction for Add Alternate No. 1 is $78,000.00.
03/26/2021 06:00 PM UTC
11 - 13 of 13 Solicitations
2 Next →