Town of South Windsor, CT
1540 Sullivan Ave, South Windsor, CT 06074
(860) 644-2511 x245
1540 Sullivan Ave, South Windsor, CT 06074
(860) 644-2511 x245
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Reconstruction of Kennedy Road
In general, the work to be performed under this contract is for full depth reconstruction of approximately 750 feet of Kennedy Road. This includes installation of new drainage pipe, catch basins, manhole tops, excavation and removal of the existing pavement and base material as shown on the plans, installation of new processed aggregate base material, 2 lifts of new HMA pavement, bituminous curb, pavement markings, repaving driveway aprons, cutting filling and grading roadside slopes, and installing topsoil and grass seed on all disturbed roadside areas. This is a state funded project (Project No: 0132-0140) funded through the Small-Town Economic Assistance Program (STEAP)
| 06/23/2025 06:00 PM UTC |
Number | Deadline |
---|---|
Replacement of Main Street Bridge over the Podunk River Bridge 04174
The Town proposes a complete replacement of the existing bridge with a 70-foot clear span, NEXT Type 40D Beam superstructure supported by integral abutments founded on deep H-Pile foundations and cantilevered U-type wingwalls. The replacement would also consist of removing the existing stone masonry abutments and wingwalls to elevation 16.5’ +/-, which is above the ordinary high-water line at the site. Rounded stone riprap will be installed on the newly graded embankments. It is anticipated all construction work will be contained within the existing roadway fill embankments. A water main under the bridge will be removed and replaced as part of this project.
The project would also consist of reconstructing approximately 195 feet of roadway and installing new guide rail at all approaches.
No drainage structures are proposed and the embankments will be graded to allow stormwater to sheet flow to the adjacent wetlands.
| 10/28/2021 06:00 PM UTC |
L132-0004, Reconstruction of Avery Street Phase 5
Description: This project includes the full depth reconstruction of 2075 feet of Avery Street including but not limited to the installation of new drainage systems, HMA pavement, base, bituminous concrete curbing, concrete sidewalks, metal beam rail, bituminous driveway apron, topsoil, turf establishment and other related roadway appurtenances
Location: Avery Street, South Windsor, CT
Engineer's Estimate: $940,000
DBE/MBE/WBE %: Connecticut state law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of CONN. GEN. STAT. 4a-60g, as amended. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals.
| 05/14/2021 03:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.