Upcoming Solicitations

Number Deadline
Water Main Replacement Contract 11
Water Main Replacement Contract 11 - Front Street, Second Street & Third Street. This project consists of installing approximately 7,276 LF of 8” Waterline, 3,256 LF of 12” waterline, jack and boring 162 LF 18” casing pipe, removing 11 fire hydrants, installing 31 fire hydrants, installing 145 service connections, installing 7,265 LF of water services and reconnecting to existing water meters, 23,127 sf of sidewalk removed and replaced and other related items. This contract is subject to the provision of Davis Bacon, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted. Final Completion for the project: October 29, 2027 Engineering Estimate for the project: $3,119,700
07/23/2026 06:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Prequalification for Professional Services
The City of Perrysburg is accepting qualifications for various professional services for calendar year 2026 and 2027. Prequalification only applies to design professional work under $50,000 per ORC 153.71. Potential projects potentially include but are not limited to resurfacing, traffic studies, geotechnical reports, water distribution, sanitary sewer collection, material testing, grant writing/funding alternative services, GIS services, sustainability/energy efficiency consulting, right of way plans, water distribution design, sanitary sewer collection design, wastewater treatment plant improvements, storm water management, landscape architecture, general architecture and survey work. Roadway projects with Ohio Department of Transportation (ODOT) participation require the consultant to be ODOT pre-certified. Any firm submitting for residential/commercial inspection needs to also include all storm water certifications currently held.
01/16/2026 07:00 PM UTC
Ft Meigs Road Ditch Repair and Multi-Use Path
This project consists of cleaning, regrading and making improvements to the existing ditch. There will also be sheet piling installation, landscaping, wooden fence installation and installation of a 10 foot multi-use path along the west side of Fort Meigs road from Eckel Junction Road to State Route 65 (West River Road). This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted. Final Completion for the project: November 1, 2026 Engineering Estimate for the project: $2,800,000
01/15/2026 07:00 PM UTC
Fort Meigs Road - Coe Court Signal Improvements
The City of Perrysburg hereby invites qualified firms to provide all labor & materials for the installation of a traffic signal installations at Ft Meigs Road/Coe Court Intersection. This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. Substantial Completion: October 1, 2026 Engineering Estimate for the entire project: $ 350,000
01/15/2026 07:00 PM UTC
Rebid Municipal Pool Management
The City of Perrysburg is seeking bids from qualified consultants to manage and operate the Perrysburg Municipal Pool, located at 915 Elm Street, Perrysburg, Ohio 43551. The City’s objective is to have the Consultant maintain the swimming pool in a safe, clean, hazard-free manner and in compliance with all applicable governmental standards and regulations. It is also part of the objective to have the Consultant operate the swimming pool in such a manner that patrons are encouraged to use the facilities and that all facilities and operations reflect well on the City of Perrysburg. Engineer's Estimate = $250,000.00 (first year)
01/08/2026 07:00 PM UTC
Downtown Streetscape Phase 2
This project consists of milling and resurfacing, road widening, curb replacement, sidewalk replacement, paver installation, planter installation, and other appurtenances for the 100 and 200 blocks of Louisiana Avenue. This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted. Final Completion for the project: November 1, 2026 Engineering Estimate for the project: $4,250,000
12/11/2025 07:00 PM UTC
Municipal Pool Operations and Management
The City of Perrysburg is seeking bids from qualified consultants to manage and operate the Perrysburg Municipal Pool, located at 915 Elm Street, Perrysburg, Ohio 43551. The City’s objective is to have the Consultant maintain the swimming pool in a safe, clean, hazard-free manner and in compliance with all applicable governmental standards and regulations. It is also part of the objective to have the Consultant operate the swimming pool in such a manner that patrons are encouraged to use the facilities and that all facilities and operations reflect well on the City of Perrysburg. Engineer's Estimate = $250,000.00
10/30/2025 06:00 PM UTC
Ferrous Chloride
Ferrous Chloride - The City of Perrysburg is accepting proposals for Ferrous Chloride for the period of three (3) years
10/30/2025 06:00 PM UTC
Emulsion Polymer
Emulsion Polymer - The City of Perrysburg is accepting proposals for Emulsion Polymer for the period of three years.
10/30/2025 06:00 PM UTC
Utility Rate Study
The City of Perrysburg is seeking Statement of Qualifications (SOQ) from firms to conduct a comprehensive Water and Sewer Utility Rate Study. This study will include an analysis of the base water and sewer rates, water and sewer capital expansion charges, potential revenue changes resulting from current negotiations with the Northwest Water and Sewer District, and impacts related to the current Director’s Final Findings and Orders (DFFO) from the Ohio Environmental Protection Agency (OEPA), including potential financial costs impacts from the Final SSSO Elimination Plan.
07/31/2025 06:00 PM UTC
Fire Station 38 HVAC Improvements
Fire Station 38 HVAC Improvements This project consists of removing the three (3) existing residential grade furnaces, condensers and all ancillary equipment and installing a new commercial grade roof top unit. Ductwork will be reused as much as possible but some changes are needed. There is also an alternate (Alternate H-1) to remove an existing (not in use) rooftop unit, curbs/penetrations and repair the roof. This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted. Final Completion for the project: May 29, 2026 Engineer's Estimate = $467,000.00
07/17/2025 06:00 PM UTC