2026-008 Curtis Drive Reconstruction
Project: CURTIS DRIVE RECONSTRUCTION Contract ID: 2026-008 Design Engineer: Choice One Engineering Location: Curtis Drive, Wilmington OH Project Deadline: June 30, 2027 Engineer's Estimate: Base Bid: $1,282,270.00 Alternate 1: $87,001.00 Overview: The proposed project includes full reconstruction of the entirety of Curtis Drive, approximately 1,240 feet, including new storm and sanitary sewers. Question Deadline: September 25, 2026 @ 4pm
10/02/2026 04:30 PM UTC
2026-007 North Spring St Improvements, Phase 1
Project: North Spring St. Improvements, Phase 1 Contract ID: 2026-007 Design Engineer: Fishbeck Location: N. Spring St., Wilmington OH Project Deadline: May 31, 2027 Engineer's Estimate: Base Bid: $2,104,300.00 Alternate 1: $96,000.00 Alternate 2: $377,000.00 Alternate 3: $169,000.00 Overview: The proposed project includes water main and service replacement, installation of fire hydrants, sanitary sewer replacement, and sanitary sewer manhole repair/replacement.
10/02/2026 04:00 PM UTC
2026-006 North Spring St Improvements, Phase 1
Project: North Spring St. Improvements, Phase 1 Contract ID: 2026-006 Design Engineer: Fishbeck Location: N. Spring St., Wilmington OH Project Deadline: May 31, 2027 Engineer's Estimate: Base Bid: $1,527,900.00 Alternate 1: $96,000.00 Alternate 2: $377,000.00 Alternate 3: $123,000.00 Overview: The proposed project includes water main and service replacement, installation of fire hydrants, sanitary sewer replacement, and sanitary sewer manhole repair/replacement.
08/14/2026 04:00 PM UTC
2026-005 Landfill Bridge Over Lytle Creek- Installation ONLY
Project: 2026 Landfill Bridge Over Lytle Creek Installation ONLY Contract ID: 2026-005 Design Engineer: FISHBECK Location: Near Wilmington Landfill 397 S Nelson Ave. Wilmington, OH Project Deadline: December 31, 2026 Optional Pre-Bid Meeting: Monday, July 6 @ 3 pm @ Wilmington Landfill 397 S. Nelson Ave. Wilmington, OH 45177 Overview: The proposed project includes construction of a new single span steel beam bridge over Lytle Creek for the expansion of the Wilmington Landfill. The previous bid package No. 1 fulfilled the procurement and delivery of materials with critical lead times. These items will be delivered to the City by October 5, 2026 for use in the construction and installation under this contract. This project is for bid package No. 2 which consists of procurement of the remaining bridge materials and construction of the new bridge. Approach roadway work is not included and is to be performed by the City. The Contractor is to be aware that this work is to be performed near an active Bike Trail and Landfill. Bike Trail closures may be permitted on a limited basis. Engineer's Estimate: $447,743.03
07/17/2026 04:00 PM UTC
2026-004 Curtis Drive Reconstruction
Project: CURTIS DRIVE RECONSTRUCTION Contract ID: 2026-004 Design Engineer: Choice One Engineering Location: Curtis Drive, Wilmington OH Project Deadline: November 1, 2026 Engineer's Estimate: Base Bid: $1,113,083.40 Alternate 1: $87,001.00 Overview: The proposed project includes full reconstruction of the entirety of Curtis Drive, approximately 1,240 feet, including new storm and sanitary sewers.
07/02/2026 04:00 PM UTC
2026-003 Davids Drive Shared-Use Path (CLI MR 386 Davids Dr SUP)
PROJECT: Davids Drive Shared-Use Path (CLI MR 386 Davids Dr SUP) CONTRACT ID: 2026-003 ODOT PID: 119750 DESIGN ENGINEER: EL Robinson LOCATION: City of Wilmington - Davids Drive PROJECT DEADLINE: October 22, 2026 Engineer's Estimate: $896,409.84 OVERVIEW: The Davids Drive Shared-Use Path project is comprised of construction of 1.2 mile shared-use path along Davids Drive in Wilmington, OH. The path will begin at the existing shared-use path along Lynne Lane and will terminate near the Wilmington Christian Academy Athletic Facility.
04/17/2026 04:00 PM UTC
2026-002 MATERIALS ONLY Landfill Bridge Over Lytle Creek
Project: 2026 Materials Only Landfill Bridge Over Lytle Creek Contract ID: 2026-002 Design Engineer: Fishbeck Location: Wilmington Landfill 397 S. Nelson Ave. Wilmington, OH 45177 Project Deadline: Materials Delivery by October 5, 2026 Engineer's Estimate: $143,193.41 Overview:The City intends to construct a new vehicular bridge in 2026 to access the City's property over Lytle Creek to ensure continual operations by the City's Landfill Department. The bridge will be a single span galvanized rolled steel beam superstructure with a composite reinforced concrete deck on integral abutments. The bridge will be advertised in two separate packages: Bid Package No. 1 includes bridge components with sensitive material and fabrication lead times and Bid Package No. 2 includes the remaining portion of the structure and installation of components for both Bid Packages No. 1 and 2. This advertisement is for Bid Package No. 1, which includes identified bridge components to be ordered and delivered to the City.
04/01/2026 04:00 PM UTC
2026-001 2026 Residential Paving Program
Project: 2026 Residential Paving Program Contract ID: 2026-001 Planning Engineer: Paul Goodhue, P.E., PTOE Project Deadline: November 30, 2026 Overview: They City of Wilmington will conduct resurfacing on 9 streets for a total of nearly 30,000 square yards during the 2026 asphalt resurfacing program. A portion of existing curbs and gutter will be replaced and full depth repairs will be completed as directed by the Engineer. The roadways to be resurfaced are: • Charles Street • Paris Avenue • Douglas Street • South Wall Street • Marlena Avenue • Hawley Avenue • Doan Street • South Walnut Street • East Short Street Engineer's Estimate Base Bid: $984,643.00 Engineer's Estimate Alt #1: $169,000.00 Engineer's Estimate Alt#2: $669,985.00
03/20/2026 04:00 PM UTC
2025-009 2025 Water Treatment Plant Rehabilitation Project
Project: 2025 Water Treatment Plant Rehabilitation Project Contract ID: 2025-009 Planning Engineer: Hazen and Sawyer Location: Water Treatment Plant 1142 Prairie Avenue, Wilmington OH 45177 Project Deadline: December 20, 2025 Overview: The proposed project includes the installation of 8 new effluent water valves and actuators, cleaning the water filter cells, and replacement of water filter media. Engineer's Estimate Base Bid: $430,000.00 Engineer's Estimate Alternate 1: $480,000.00
09/05/2025 04:00 PM UTC
2025-008 WTP Lime Sludge Removal and Application to Farmland
Project: WTP Lime Sludge Removal and Application to Farmland Contract ID: 2025-008 Location: Water Treatment Plant 1142 Prairie Avenue Wilmington, OH 45177 Project Deadline: June 30, 2026 Overview: The proposed project includes removal and application to farmland of sludge from the Wilmington Water Treatment Plant lime storage facility (Lagoon #1) 2025 MANDATORY Pre-Bid Meeting: Tuesday, August 19 @ 1 pm at the Wilmington Water Treatment Plant, 1142 Prairie Avenue, Wilmington OH 45177
08/29/2025 04:00 PM UTC