General Info

Business Logo

Solicitations and notifications are free for this business.

County of Marin

3501 Civic Center Dr Room 404, San Rafael, CA 94903-4112
(415) 473-7176

The County of Marin is committed to developing and supporting diverse, equitable, and inclusive values within all aspects of its operations. By conducting business for or with the County, you are representing your commitment to rejecting inequities in employment, services, and practices by ensuring fair and equitable treatment for all.

*** We strongly encourage all potential respondents thoroughly review all submission requirements and response fields prior to submission deadlines. Should a respondent have any questions on how to successfully complete any fields, please reach out to the appropriate contact for the advertisement ***
______________________________________________________________________

Economic Sanctions Imposed in Response to Russia’s Actions in Ukraine

California joins the United States and other nations, states, and localities in condemning Russia’s attacks on Ukraine. On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22(EO) regarding sanctions against Russia and Russian entities and individuals.

The Executive Order directs all agencies and departments that are subject to the Governor’s authority to take certain immediate steps, including notifying all contractors and grantees of their obligations to comply with existing economic sanctions imposed by the U.S. Government in response to Russia's actions in Ukraine, as well as any sanctions imposed under state law. Constitutional and independent state entities are encouraged to take the steps as well.

As a contractor or grantee, compliance with the economic sanctions imposed in response to Russia's actions in Ukraine is required, including with respect to, but not limited to, the federal executive orders identified in the EO and the sanctions identified on the U.S. Department of the Treasury website.

Failure to comply may result in the termination of contractors or grant, as applicable.

Upcoming Solicitations

Number Deadline
CAP 41C2514 WOODACRE STAFF RESTROOM IMPROVEMENTS
Project Name: WOODACRE STAFF RESTROOM IMPROVEMENTS County Project No.: 41C2514 Project Contact & Email: Jorge Nunez, Jorge.Nunez@MarinCounty.gov Project Description: This is an interior renovation of the existing second-floor Men's Restroom. The project includes the demolition of existing finishes, lighting fixtures, toilet partitions and accessories, and plumbing fixtures, followed by the in-kind replacement of plumbing fixtures and lighting, along with new finishes, toilet accessories, and millwork. The scope also includes accessibility upgrades to both the exterior and interior paths of travel leading to the work area, as well as hazardous materials and asbestos abatement. Engineer's Estimate: $427,000 Bid Opening Date & Time (On Zoom): Tuesday, September 1, 2026 @ 2:00 P.M. Zoom Link for bid opening: https://us05web.zoom.us/j/86361672967?pwd=KVKnrHA8ud5231oTJqKeRzHWygiQYD.1 Meeting chat link https://us05web.zoom.us/launch/jc/86361672967 Meeting ID: 863 6167 2967 Passcode: 1ZW2Dd Pre-bid Conference: There is a MANDATORY pre-bid conference scheduled for this project on July 28, 2026 at 10:00am. The location is 33 Castle Rock Ave., Woodacre, CA 94973. Contact Jorge Nunez for more information, jorge.nunez@marincounty.gov.
09/01/2026 09:00 PM UTC
PRO - RFP - HHS - 2026 - 15
Project Name: Congregate Meal Production Date: July 29, 2026 Description: The County of Marin Department of Health and Human Services, Division of Social Services, Aging and Adult Services, is seeking qualified organizations to provide congregate meal production and delivery services for the Older Americans Act Title III-C Nutrition Program. The selected contractor will prepare and deliver nutritious, ready-to-serve meals to designated congregate dining sites throughout Marin County, serving adults age 60 and older. Services include menu planning, meal production, packaging, and delivery in compliance with all applicable federal, state, and local regulations, including the Older Americans Act, California Department of Aging requirements, and County nutrition standards. The successful proposer will demonstrate the capacity to provide high-quality, culturally responsive meals that meet established nutritional guidelines while maintaining food safety standards and reliable delivery schedules. The contractor will work collaboratively with the County to support congregate dining services that promote healthy aging, reduce food insecurity, encourage social engagement, and advance equitable access to nutrition services for Marin County's diverse older adult population. The initial contract term is anticipated to begin November 1, 2026, through June 30, 2027, with the option for renewal based on performance, funding availability, and County needs. Funding for the initial contract term is not to exceed $64,661. The County encourages proposals from organizations with demonstrated experience in meal production, nutrition services, and serving culturally diverse communities. Department: Health and Human Services
09/01/2026 10:00 PM UTC
CAP 41C2302 - VMA Gold Gates & Fence
Project Name: VMA Gold Gates & Fence County Project No.: 41C2302 Project Contact & Email: Karen Chew, karen.chew@marincounty.gov Project Description: The project consists of vegetation clearing, removal and disposal of existing decorative gold gates, fence posts, chain link fabric, and existing fence post foundations; and fabrication and installation of new decorative gold gates, posts and foundations, and fence fabric. Engineer's Estimate: $245,000 There will not be a pre-bid conference for this project. The Working Days for this project are 35 days. Bid Opening Date & Time (On Zoom): September 2, 2026 at 2:00 p.m. Zoom Link for bid opening: https://us06web.zoom.us/j/81691292797?pwd=79oibINQrtmshzCGKpRMaSGaXGod8a.1 The deadline to submit questions is Friday, August 21, 2026, by 5:00 p.m. If submitting a paper bid it needs to be delivered to the Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
09/02/2026 09:00 PM UTC
PRO RFP 2880 General Liability Third Party Administrator Services
Project Name: General Liability Third Party Administrator Services Date: August 17, 2026 Department / Division: Risk Management/Human Resources Description: On behalf of the Human Resources, Risk Management Division, and in conjunction with County Counsel, the County of Marin Procurement Division is requesting proposals from qualified firms to provide comprehensive third-party property and liability claims administration services. The selected Claims Administrator will work closely with Risk Management and County Counsel to maintain continuity of service for claimants and County staff, administer claims from initial receipt through closure, and support the County’s self-insured liability program.
09/05/2026 12:00 AM UTC
CAP 41C2501 MARIN COUNTY JUVENILE HALL CAMERA SYSTEM
Project Name: MARIN COUNTY JUVENILE HALL CAMERA SYSTEM County Project No.: 41C2501 Project Contact & Email: Paul Swallow, Paul.Swallow@MarinCounty.gov Project Description: This project will be replacing, upgrading, or supplementing existing (IP) security, movement and surveillance cameras in and around the Marin County Juvenile Hall with IP cameras. The Current system is also integrated with the door control, intercom and movement systems, which provide camera views to the control room operator as door control buttons are activated. The replacement system will also provide this functionality. Engineer's Estimate: $1,570,326 Zoom Link for bid opening: https://us05web.zoom.us/j/83343197162?pwd=w1un7KqNbD7aVA1apiaDriziAl1sti.1 Zoom ID & Password: 833 4319 7162, Password: i1Ahzt Pre-bid Conference: There is a MANDATORY pre-bid conference scheduled for this project on Tuesday August 25, at 10:00am The location is 16 Jeanette Prandi Way, San Rafael Ca. Contact Paul Swallow for more information, paul.swallow@marincounty.gov. MANDATORY Background Check: All attendees are required to be cleared prior to attending the pre-proposal meeting. A clear image of the driver’s license of each attending individual must be submitted by email to paul.swallow@marincounty.gov no later than 2:00pm on August 21, 2026, for clearance processing. Failure to do so will exclude non-cleared attendees from entering the facility.
09/18/2026 09:00 PM UTC
PRO - RFP - HHS - 2026 - 16
Project Name: Strategy Team: CalAIM Date: August 25, 2026 Description: The County of Marin requires a comprehensive, ONC-certified, and modern relational database EHR architecture that unifies physical health, substance use disorder (SUD) tracking, case management, and financial revenue cycle operations into a secure framework. The selected solution must scale across external networks of contracted Community-Based Organizations (CBOs) and feature clinical partitions, automated multi-party electronic consent workflows, and strict compliance engines built for California's intersecting health-and-justice regulations. Department / Division: Health and Human Services
09/24/2026 10:00 PM UTC
PRO - RFP 2907 County Budget Software System
Project Name: County Budget Software System Date: Tuesday, August 18, 2026 Description: The Marin County Office of the County Executive (OCE) is soliciting proposals from qualified vendors to provide an integrated budget development and publication software suite capable of budget and capital plan development and budget and capital plan book production. The solution must be flexible enough to handle the full spectrum of budgeting and reporting needs at the County – work performed by everyone from budget and finance professionals to subject matter experts needing quick reports to administrative staff doing routine journal entries. We are specifically calling for solutions that can serve the dual purpose of standard reporting and planning along with production capabilities for the County’s annual budget book of record and its capital plan book. Our existing processes require the use of several different tools for these respective capabilities. The software suite needs to be user-friendly, easy to learn, and digitally compliant, with flexibility and customizable reporting capabilities. Public-facing materials, including online and PDF budget materials, need to be accessible based on current legal standards and requirements. County staff will use the software to complete all budget development and fiscal projection tasks, financial reporting, and data entry as part of the annual budget development cycle. Additionally, for a Capital Improvement Plan (CIP) management system, the County seeks a solution that will improve visibility into capital project scope, status, schedule, budget, expenditures, funding, and priorities. It should integrate with Tyler Enterprise ERP (formerly Munis) by Tyler Technologies to reduce duplicate data entry and improve alignment between project planning and financial information. It needs to provide configurable reporting, dashboards, workflows, and document-generation capabilities. The system should support multi-year capital planning, including project requests, scoring, prioritization, funding scenarios, project ranking, and planning-year assignments. The solution should allow the County to evaluate proposed and active projects based on configurable criteria, available funding, strategic priorities, facility needs, infrastructure condition, regulatory requirements, and other factors. Department / Division: Office of the County Executive
10/01/2026 12:00 AM UTC
7 Solicitations

Closed Solicitations

Number Deadline
REPOST - RFP #2848 Donahue Street Portable Pump Operations & Maintenance Services
*** REPOST *** This RFP has been reposted to Bid Express to allow vendors who attended the mandatory pre-proposal meeting for RFP #2848 Donahue Street Portable Pump Operations & Maintenance Services, to submit proposals electronically. Project Name: RFP #2848 Donahue Street Portable Pump Operations & Maintenance Services Description: The Marin County Flood Control & Water Conservation District (District) is seeking qualified contractors to be available on-call 24/7 when notified by District staff to set-up, operate and maintain portable trailer mounted pumps at a pump station consisting of two below ground sumps located along Donahue Street in Marin City, Marin County, California. Division: Marin County Flood Control & Water Conservation District ***Pre-Proposal Conference** There will be mandatory pre-proposal site visit scheduled by the County. This conference should be approximately 2 hours long. - Date/Time: Wednesday, June 12, 2024 @ 11:00 AM - Location: Drake Avenue and Donahue St in Marin City. Near the St Andrew Presbyterian Church located at 101 Donahue St, Sausalito, CA 94965.
07/16/2024 09:00 PM UTC
2023-36 MARIN CITY DONAHUE STREET PORTABLE PUMP STATION PROJECT
Project Name: MARIN CITY DONAHUE STREET PORTABLE PUMP STATION PROJECT County Project No. 2023-36 Project Contact & Email: Dave Bracken David.Bracken@MarinCounty.gov Project Description: Improvements for this project will generally include two temporary wet wells with two trailer mounted pumps, a new catch basin and replacing an existing drainage inlet with a larger catch basin structure. New storm drain pipe will connect the new catch basin, replaced drainage inlet and two wet well structures. The two trailer-mounted pumps will be purchased by the County prior to construction and will pump stormwater out of the wet wells via 8-inch DIP intake piping and discharge flow via 12-inch HDPE force mains into the existing Pond outlet structure located on the east side of the Pond, approximately 1,200 feet to the north. The proposed force main alignments is field fit and will run above grade and in parallel north around the Gateway Shopping Center parking lot (behind the back of curb as to not obstruct business operations) and continue north along the muscle wall east of the Pond, then west to discharge through the hatch on the Pond outlet structure. The improvements also include replacing sections of existing concrete curb and gutter with new concrete curb and gutter, a new gravel pad, road resurfacing and pavement markings/striping restoration. The work will take place on local (residential) roads in Marin City in the landscaped area north of the Drake Avenue and Donahue Street intersection. Engineer's Estimate: $1,400.000 Bid Opening Date & Time (On Zoom): July 12, 2024 at 2:00 PM Zoom Link for bid opening:https://us04web.zoom.us/j/76661709181?pwd=xanyaPPaq4foOYAa8H2PG6qJCpJIyQ.1 Zoom ID & Password:766 6170 9181, Password: DPW2024 A mandatory pre-bid meeting is scheduled for 1:00 p.m. on June 25, 2024 for this project. The pre-bid meeting location is the southeast corner of the Marin Gateway Shopping Center located in Marin City, CA. Only contractors that attended the pre-bid meeting will have their bids opened and read at bid opening. If submitting a paper bid it needs to be addressed to the Director of Public Works and delivered to: Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
07/12/2024 09:00 PM UTC
ENG 2021-03 2021 MARIN CITY SUB-HIP PEDESTRIAN IMPROVEMENT PROJECT
Project Name: 2021 MARIN CITY SUB-HIP PEDESTRIAN IMPROVEMENT PROJECT Federal Project No.: County Project No.: 2021-03 Project Contact & Email: Jason Wong jason.wong@marincounty.gov Project Description: Improvements for this project will generally include construction of nineteen (19) access compliant curb ramps, sidewalk, curb and gutter, valley gutter, reconstruct catch basin top, hot mixed asphalt conform grind and pave, relocate street signs, and refresh adjacent pavement markings. Engineer's Estimate: $340,000 DBE Percentage Goal: 20% Public bid opening to be conducting on Zoom. Zoom Link:https://us04web.zoom.us/j/73769806625?pwd=ab5AOpQaHbtbEvk8xo60nOajefsHLa.1 Zoom ID & Password: 737 6980 6625, Password: DPWENG2024 If submitting a paper bid it needs to be addressed to the Director of Public Works and delivered to: Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
07/03/2024 09:00 PM UTC
PRO RFP 2848 RFP 2848 Donahue Street Portable Pump Operations & Maintenance Services
Project Name: RFP #2848 Donahue Street Portable Pump Operations & Maintenance Services Date: 5/31/2024 Description: The Marin County Flood Control & Water Conservation District (District) is seeking qualified contractors to be available on-call 24/7 when notified by District staff to set-up, operate and maintain portable trailer mounted pumps at a pump station consisting of two below ground sumps located along Donahue Street in Marin City, Marin County, California. Division: Marin County Flood Control & Water Conservation District ***Pre-Proposal Conference** There will be mandatory pre-proposal site visit scheduled by the County. This conference should be approximately 2 hours long. - Date/Time: Wednesday, June 12, 2024 @ 11:00 AM - Location: Drake Avenue and Donahue St in Marin City. Near the St Andrew Presbyterian Church located at 101 Donahue St, Sausalito, CA 94965.
06/28/2024 11:00 PM UTC
2024-06 130-132 BRETANO WAY RETAINING WALL REPLACEMENT
Project Name:130-132 BRETANO WAY RETAINING WALL REPLACEMENT County Project No. 2024-06 Project Contact & Email: Hugh Davis Hugh.Davis@MarinCounty.gov Project Description: The project generally consists of a 102 linear-feet pressure-treated wood lagging wall with steel soldier piles. Engineer's Estimate:$182,000 Bid Opening Date & Time (On Zoom): June 27, 2024 at 2:00 PM Zoom Link for bid opening:https://us04web.zoom.us/j/72093991020?pwd=8aCRFARa2uJA3pYiUWrDGJRlt8YaIz.1 Zoom ID & Password:720 9399 1020, Password: DPWENG2024 If submitting a paper bid it needs to be addressed to the Director of Public Works and delivered to: Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
06/27/2024 09:00 PM UTC
ENG 2024-08 2024 PAVEMENT DIGOUT PROJECT, PHASE 1
Project Name: 2024 PAVEMENT DIGOUT PROJECT, PHASE 1 County Project No.: 2024-08 Project Contact & Email: Bradley Kurz bradley.kurz@marincounty.gov Project Description: This project generally consists of grinding and paving asphalt concrete digouts, traffic control, storm water pollution control and related incidental work on various roadways that include: Butterfield Rd, Nicasio Valley Rd and Pt. Reyes-Petaluma Rd. Engineer's Estimate:$470,000 Bid Opening Date & Time (On Zoom): June 25, 2024 at 2:30 PM Pacific Zoom Link for bid opening: https://us04web.zoom.us/j/75994231599?pwd=14E3k0G506ganaZwakmghrZFVV7awe.1 Zoom ID & Password: 759 9423 1599, Password: DPWENG2024 If submitting a paper bid it needs to be addressed to the Director of Public Works and delivered to: Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
06/25/2024 09:30 PM UTC
CAP 41C2410 120 N. Redwood Ground Floor Improvements
Project Name: 120 N. Redwood Ground Floor Improvements, 120 N. Redwood Drive, San Rafael County Project No.: 41C2410 Project Contact & Email: Mark Mancuso, mark.mancuso@marincounty.gov Project Description: The project entails the demolition and renovation of existing ground floor interview rooms and mailroom area which comprise the majority of the ground floor office area. Work will include fire sprinkler and accessibility needs, the installation of new mechanical units and distribution, and new electrical lighting, switching and distribution. All walls are non-structural. These activities are to be accomplished in a specific sequence in order to minimize disruption to County operations and accommodate work flow. Pre-bid Conference: There is a MANDATORY pre-bid conference scheduled for this project on Thursday, May 16, 2024, at 8:00 AM. The location is 120 N. Redwood Drive in San Rafael. Contact Mark Mancuso for more information, mark.mancuso@marincounty.gov. Engineer's Estimate: $550,000 Bid Opening Date & Time (On Zoom): Thursday, June 20, 2024, at 3:00 pm Zoom Link for bid opening: https://us05web.zoom.us/j/89287122897?pwd=9dsFQBTZNalDCa3UgkyWYHBqqY76xi.1 Meeting ID: 892 8712 2897 Passcode: 50SLvH If submitting a paper bid it needs to be delivered to the Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
06/20/2024 10:00 PM UTC
WR CSA 29-24-01 Paradise Cay-CSA No. 29 - 2024 Maintenance Dredging Project
Project Name: Paradise Cay-CSA No. 29 - 2024 Maintenance Dredging Project County Project No.: CSA 29-24-01 Project Contact & Email: Joanna Dixon Joanna.Dixon@MarinCounty.gov Project Description: Maintenance dredging of the Paradise Cay area in Tiburon for recreational boating use will generally include dredging and removal of sediment to minus seven feet within the waterways and to minus eight feet in the entrance channels. The Base Bid will include dredging of the South Entrance Channel. Three separate Bid Alternates for the North Entrance channel, the North and South interior channels, and interior A,B,C,D,&E channels may be awarded. The Engineer’s Estimate for all of the dredging work is $715,000. Bids are required for the entire work described herein. The Contractor shall possess a valid Class “A” License at time of bid submittal. No pre-bid meeting is scheduled for this project. Bidders are strongly encouraged to visit the work site(s) before submitting a bid. Engineer's Estimate: $715,000 Bid Opening Date & Time (On Zoom): Zoom Link for bid opening:https://us04web.zoom.us/j/78469274278?pwd=6CwFZtc9jlTrRRJakGDi3J0a3Eb3bK.1 Zoom ID & Password: 784 6927 4278, Passcode: DPW2024 If submitting a paper bid it needs to be addressed to the Director of Public Works and delivered to: Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
06/20/2024 09:00 PM UTC
PRO - RFP 2854 Lower Novato Creek Vegetation Management
Project Name: Lower Novato Creek Vegetation Management Date: May 7, 2024 Description: The Marin County Flood Control & Water Conservation District (District) is seeking proposals to provide vegetation management services of sites specific to California Department of Fish and Wildlife (CDFW) permit requirements for invasive removal and adaptive management strategy practices. The purpose of these services is to maintain compliance for invasive species not to exceed the threshold of 20% cover along the project reach and prevent other non-native species from forming a monoculture. The contractors will be responsible for removing non-native species within this criteria Novato Creek’s native habitat. This project is within Flood Control Zone No. 1 (Zone 1) within the Novato Creek Watershed in the City of Novato, California. The work shall begin Summer 2024 after bird nesting season and may continue until the next time sediment is removed from Novato Creek (no earlier than Summer 2025). Department: Marin County Flood Control & Water Conservation District MANDATORY PRE-PROPOSAL CONFERENCE/SITE VISIT - * Date/Time: May 21, 2024, at 10:00 AM Pacific Time * Location: Site visit will start at Novato Creek’s Ecotone site, located at the City of Novato Corporation Yard gate to Ecotone Levee at 550 Davidson St, Novato, Ca 94945. The second site, Heron’s Beak Pond, is accessible from a dirt road off State Route 37 going westbound right before the Hanna Ranch Road exit. * The purpose of the site visit is to acquaint prospective bidders with the existing conditions of each site, the layouts, access of each site, and the surrounding area, which could affect the cost of the bid. * The site visit will be approximately 1.5 hours to 3 hours. Attendees are expected to provide their vehicle transportation between the two sites. * Only bids from bidders who attend the site visit will be accepted.
06/12/2024 09:00 PM UTC
ENG 2019-22 SFDB MP 20.97 SLIDE REPAIR PROJECT
Project Name: SIR FRANCIS DRAKE BLVD MP 20.97 SLIDE REPAIR PROJECT Federal Project No.: ER-40A0(090) County Project No.: 2019-22 Project Contact & Email: Jason Wong jason.wong@marincounty.gov Project Description: Work will generally include constructing two separate cast-in-drilled-hole concrete retaining walls with a pile cap and tiebacks. One wall will be approximately 101 feet in length and the other will be approximately 148 feet in length. Work will also involve a culvert replacement, installation of rock slope protection, and roadway paving. Construction for this project shall ONLY occur between June 15 and October 15 unless granted approval from the County. Nesting bird survey is required if work is to occur between February 15 to August 31. Coordination with the County will be required for nesting bird survey. Engineer's Estimate: $1,400,000 DBE Goal: 16% Public bid opening to be conducting on Zoom. Zoom Meeting ID: 732 0910 9157, Password: DPWENG2024 Zoom Link: https://us04web.zoom.us/j/73209109157?pwd=48JvdWCJ0DWFao2cmLOc7ogaMwelwj.1 If submitting a paper bid it needs to be addressed to the Director of Public Works and delivered to: Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
06/06/2024 09:00 PM UTC
131 - 140 of 241 Solicitations
1 2 10 11 12 14 16 17 18 24 25