General Info

Business Logo

County of Marin

3501 Civic Center Dr Room 404, San Rafael, CA 94903-4112
(415) 473-7176

The County of Marin is committed to developing and supporting diverse, equitable, and inclusive values within all aspects of its operations. By conducting business for or with the County, you are representing your commitment to rejecting inequities in employment, services, and practices by ensuring fair and equitable treatment for all.

*** We strongly encourage all potential respondents thoroughly review all submission requirements and response fields prior to submission deadlines. Should a respondent have any questions on how to successfully complete any fields, please reach out to the appropriate contact for the advertisement ***
______________________________________________________________________

Economic Sanctions Imposed in Response to Russia’s Actions in Ukraine

California joins the United States and other nations, states, and localities in condemning Russia’s attacks on Ukraine. On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22(EO) regarding sanctions against Russia and Russian entities and individuals.

The Executive Order directs all agencies and departments that are subject to the Governor’s authority to take certain immediate steps, including notifying all contractors and grantees of their obligations to comply with existing economic sanctions imposed by the U.S. Government in response to Russia's actions in Ukraine, as well as any sanctions imposed under state law. Constitutional and independent state entities are encouraged to take the steps as well.

As a contractor or grantee, compliance with the economic sanctions imposed in response to Russia's actions in Ukraine is required, including with respect to, but not limited to, the federal executive orders identified in the EO and the sanctions identified on the U.S. Department of the Treasury website.

Failure to comply may result in the termination of contractors or grant, as applicable.

Upcoming Solicitations

Number Deadline
CAP 41C2302 Marin County Veterans' Memorial Auditorium Dome Roof Recoating
Project Name: Marin County Veterans’ Memorial Auditorium Dome Roof Recoating Project County Project No.: 41C2302 Project Contact & Email: Cam Isaza, cam.isaza@marincounty.gov Project Description: Application of a new unreinforced silicone roof coating over the existing silicone roof coating and repairs to existing coating damage. Engineer's Estimate: $650,000 Bid Opening Date & Time (On Zoom): November 4, 2025 at 2:00 p.m. One-Click Zoom Link for bid opening: https://us05web.zoom.us/j/85463254776?pwd=nuEk1bykTZWgvlm0ADtypUa7xLt3hH.1 Meeting ID: 854 6325 4776 Passcode: wGJ6zK Pre-bid Conference: There is a pre-bid conference scheduled for this project on October 21, 2025, at 10:00 a.m. The location is 10 Avenue of the Flags, San Rafael, Ca 94913. Contact Cam Isaza for more information, cam.isaza@marincounty.gov.
11/04/2025 10:00 PM UTC
CAP REQUEST FOR QUALIFICATIONS - ON-CALL CONSTRUCTION COST ESTIMATING & SCHEDULING SERVICES
The County of Marin is inviting qualified Architectural, Engineering, Construction Management, and Cost Estimating firms to submit a statement of qualifications to provide cost estimating and scheduling services to support the Department of Public Works Capital Projects Division. The Capital Projects Division is responsible for the management of major capital improvements made to the County’s portfolio of buildings. For more information, contact Mary Hobson, mary.hobson@marincounty.gov.
11/05/2025 12:00 AM UTC
MCP 2025-02 Cascades Fountain Renovation Project
Project Name: Cascades Fountain Renovation Project Project Contact & Email: Sarah Richards sarah.richards@marincounty.gov Project Description: The project generally involves repair and renovation of the existing decorative concrete and stone-lined water feature known as the Cascades fountain located within Lagoon Park on the County Civic Center campus in San Rafael. The scope of work generally includes, but is not limited to: new intake vault, equipment enclosures and pad, water feature pump, ultra-violet water sterilizer, jets, underground piping, electrical improvements, lighting, asphalt and concrete paving, and wood retaining walls. Engineer's Estimate: $770,200 ***MANDATORY PRE-BID MEETING will be held on site Pre-Bid Meeting Date and Time: 1 p.m. on Tuesday, October 28th, 2025 The pre-bid meeting location is at the corner of Civic Center Drive and Armory Drive in San Rafael. (coordinates: 37°59'58.7"N, 122°31'49.8"W) Bid Opening Date & Time (On Zoom): Thursday November 6th 2025 at 2:00PM Zoom Link for bid opening: https://us06web.zoom.us/j/82262175155?pwd=AkeMb1926n6qq6b7yFE3FuPCISamzB.1 Zoom Meeting ID: 822 6217 5155, Passcode: 726455 Bids must be submitted electronically through Bid Express®, or by submitting sealed paper bids to the Director of Marin County Parks via the Administration desk at 3501 Civic Center Drive, Suite 304, San Rafael, CA 94903, on or before the date and time noted above, at which time bids will be publicly opened and read aloud on Zoom. Zoom meeting details noted above.
11/06/2025 10:00 PM UTC
ENG RFP - Lucas Valley Road Bridge Replacement at Miller Creek (Bridge No. 27C0016) Project: 2020-28
Marin County Department of Public Works (County) is seeking technical proposals for Preliminary Engineering, Environmental, Right of Way, PS&E Design and Construction Support Services for the preparation, execution, and completion of work outlined in this Request for Proposal (RFP). The selected Consultant will provide these services to assist the County with the Lucas Valley Road Bridge Replacement at Miller Creek (Bridge No. 27C0016) Project - BRLO-5927(139) through the construction phase.
11/13/2025 12:00 AM UTC
PRO - RFP 2893 Economic Vitality Strategic Plan
Project Name: Economic Vitality Strategic Plan Date: October 15,2025 Description: The County of Marin Economic Vitality Division, a program of the Office of the County Executive (OCE), is seeking proposals from qualified consultants or consultant teams to develop a comprehensive Economic Vitality Strategic Plan (EVSP) that strengthens and sustains a resilient, diverse and thriving economy, will generate increased revenues to support essential public services, fosters economic opportunity for innovative business approaches ranging from enhancing large established models to start-up microenterprises, and reflects the unique character of the many communities of Marin. The plan will be forward looking and grounded in principles of inclusive, impactful economic development and community vitality, and with specific attention to: - The distinct economies of Marin’s incorporated cities and towns; - Job centers, and the commercial and industrial hubs in unincorporated Marin, especially Marin City, Tam Junction, areas around Novato, and Point Reyes Station; - Rural and agricultural areas, and opportunities specific to the unique assets and challenges within the villages and hamlets of West Marin; - Racial disparity in Marin’s economic indicators (e.g. income inequality, poverty rates, educational attainment, home ownership), and geographic disparities that exist within supervisorial districts (e.g. Marin City - Sausalito, West Novato - Incorporated Novato) - Current economic development plans and/or references to economic development/economic vitality in planning documents (e.g. General Plans) that apply to any of the jurisdictions within Marin County. The selected consultant will develop a diversely informed community-based strategic roadmap to promote place-based economic vitality, aligned with existing County and regional strategies, and responsive to disparities in access to opportunity and wealth. To ensure the plan is resilient and forward-looking, the County seeks to integrate futures thinking into the process. The goal is to provide the County with a Strategic Plan that identifies the potential of the County, and a pathway to maximize that potential through an initial 5-year plan. This will include a look at how the areas described above will evolve, what uses will be supported by market forces, and recommended strategies the County can pursue to increase the success of existing and future businesses and industry clusters in Marin County and decreasing racial and geographic disparities. The County of Marin has allocated $100,000.00 to cover the work outlined in the specific proposal terms for the development of an Economic Development Strategic Plan as submitted by the RFP winner. If no one proposal meets the County’s needs, the Selection Committee may seek to combine elements and encourage collaboration across teams. The scope of work is detailed within this RFP. Depending on the findings and recommendations for implementation, other funds may become available. The Marin County Board of Supervisors will consider the results of the Strategic Plan developed by the selected firm at the conclusion of the project. As a relatively new program, the Strategic Plan will form the basis of future Economic Development program work at the County. Department / Division: Office of the County Executive/ Economic Vitality Division
01/16/2026 01:00 AM UTC
5 Solicitations

Closed Solicitations

Number Deadline
PRO 2856 RUSH CREEK LANDSCAPE MAINTENANCE SERVICES
Project Name: RFP #2856 Rush Creek Landscape Maintenance Services Department: Parks & Open Space Date: 4/17/2024 Description: The County seeks high-quality work, attention to detail and a timely response to all landscaping and irrigation needs and emergencies at landscape and park areas along Atherton Avenue and Saddlewood Drive in Novato. Work performance standards, including sound irrigation, water management, and landscape management practices, shall meet or exceed industry best management practices and standards. ***Pre-Proposal Conference*** There will be a mandatory pre-proposal conference scheduled by the County. This conference should be approximately 1 hour long. Apr 30, 2024 11:00 AM Pacific Time Meeting ID: 305 068 8462 Passcode: 197986 https://us06web.zoom.us/j/3050688462?pwd=Y25vVkoyUG5lWkZRaHpRSnkxUTJ1UT09&omn=88008017953
05/15/2024 09:00 PM UTC
2023-42 - Bolinas Lagoon Wye Wetlands Resiliency Project (REBID)
Project Name: Bolinas Lagoon Wye Wetlands Resiliency Project Federal Awards Identification No. (FAIN): NA22NOS4730208, F18AP00230-01 County Project No.: 2023-42 Project Contact & Email: Veronica Pearson, veronica.pearson@marincounty.gov Project Description: Improvements for this project will generally include removing Crossover Road and restoring tidal wetlands, relocating the intersection of Olema Bolinas and elevating the realigned Olema Bolinas roadway with new bridge, rerouting Lewis Gulch Creek through the wetlands at the top of the Wye, expanding and enhancing the wetlands, improving Lewis Gulch Creek habitat for steelhead through the addition of large wood structures, reducing flooding on Olema-Bolinas Road by raising the roadway, and repairing a bank failure on Lewis Gulch Creek close to SR-1. The work will take place on Marin County Park Land and Caltrans ROW. Engineer's Estimate: $4,690,336 Public bid opening to be conducting on Zoom. Zoom Link: https://us06web.zoom.us/j/85661615041?pwd=W8gCV9sP78byKaak8MYcDexjujBCa8.1 Zoom ID & Password: 856 6161 5041, Password: 782411 If submitting a paper bid it needs to be addressed to the Director of Public Works and delivered to: Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
05/13/2024 05:00 PM UTC
ENG 2019-13 Lucas Valley Rd MP 9.6 Slope Improvement Project
Project Name: Lucas Valley Rd MP 9.6 Slope Improvement Project Federal Project No.: ER-40A0(088) County Project No.: 2019-13 Project Contact & Email: Jason Wong jason.wong@marincounty.gov Project Description: Improvements for this project will generally include constructing a reinforced concrete wall supported by drilled shaft foundations and tieback ground anchors along approximately 36 feet of the eastbound shoulder of Lucas Valley Road at Mile Post 9.6. A rock buttress will be installed along the bank of Nicasio Creek to mitigate future slides. The construction will include a stream diversion, staging to maintain one lane of controlled traffic through the site at all times, and road reconstruction. Construction will take place in the daytime hours with traffic control. Construction for this project shall ONLY occur between June 15 and October 15 unless granted approval from the County. Nesting bird survey is required if work is to occur between February 15 to August 31. Coordination with the County will be required for nesting bird survey. Engineer's Estimate: $722,000 DBE Percentage Goal: 17% Public bid opening to be conducting on Zoom. Zoom Meeting ID: 763 0769 1035, Password: DPWENG2024 https://us04web.zoom.us/j/76307691035?pwd=9KDR3iLJlars1ZjtVwXav2BLTiQEOz.1 If submitting a paper bid it needs to be addressed to the Director of Public Works and delivered to: Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
05/09/2024 09:30 PM UTC
PRO - RFP 2853 Justice Systems Consulting Services 1
Project Name: Justice Systems Consulting Services Date: April, 04, 2024 Description: The County of Marin (County) is seeking a consultant or team of consultants with analytical, business process, and vendor selection experience to conduct a full assessment of Information Services and Technology Department Justice Case Management Systems (CMS) to document the needs and requirements of participating departments. Depending on the outcome, there may be a second phase of work to draft sections of a procurement packet for replacement systems and facilitate selection of replacement systems. Responders should propose on both phases of work separately, with the knowledge that the second phase of work is an option. The Justice CMS contains functionality and features for each of the County’s Justice Departments including, but not limited to, justice system business practices and legal regulations. Department / Division: Information Services & Technology, Business Solutions Delivery Division
05/09/2024 09:00 PM UTC
ENG 2019-21 MARSHALL PETALUMA RD MP 8.24 EROSION REPAIR
Project Name: MARSHALL PETALUMA RD MP 8.24 EROSION REPAIR Federal Project No ER-40A0 (091) County Project No 2019-21 Project Contact & Email: Jason Wong jason.wong@marincounty.gov Project Description: The winter storms during February 2019 caused an embankment failure immediately below an existing retaining wall on Marshall Petaluma Road MP8.24. Work will generally include the installation a rip rap buttress along the slope starting from the bottom of the existing wall to the toe of slope of the creek. The width of the buttress will be approximately 75 feet wide. The existing voids along the slope will be filled with native soil and planted with willows and other native plants. The exposed concrete piers will be filled with grout. Construction for this project shall ONLY occur between June 15 and October 15 unless granted approval from the County. Nesting bird survey is required if work is to occur between February 15 to August 31. Coordination with the County will be required for nesting bird survey. Engineer's Estimate: $410,000 DBE Percentage Goal: 18%. Public bid opening to be conducting on Zoom. Zoom Meeting ID: 748 9076 9214, Password: DPWENG2024 https://us04web.zoom.us/j/74890769214?pwd=6V4i307Mb5TaMxniVo2zXM4RFHbut0.1 If submitting a paper bid it needs to be addressed to the Director of Public Works and delivered to: Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
05/02/2024 10:00 PM UTC
PRO - RFP 2853 Justice Systems Consulting Services
Project Name: Justice Systems Consulting Services Date: April, 04, 2024 Description: The County of Marin (County) is seeking a consultant or team of consultants with analytical, business process, and vendor selection experience to conduct a full assessment of Information Services and Technology Department Justice Case Management Systems (CMS) to document the needs and requirements of participating departments. Depending on the outcome, there may be a second phase of work to draft sections of a procurement packet for replacement systems and facilitate selection of replacement systems. Responders should propose on both phases of work separately, with the knowledge that the second phase of work is an option. The Justice CMS contains functionality and features for each of the County’s Justice Departments including, but not limited to, justice system business practices and legal regulations. Department / Division: Information Services & Technology, Business Solutions Delivery Division
05/02/2024 09:00 PM UTC
MCP 2024-04 SFDB NORTH FRONTAGE LANDSCAPE PROJECT- LA CUESTA TO EL PORTAL DRIVES
Project Name: Sir Francis Drake Boulevard North Frontage Landscape Project- La Cuesta to El Portal Drives Project Contact & Email: Sarah Richards sarah.richards@marincounty.gov Project Description: The project involves renovating existing landscape areas between the back of sidewalk and the property fence line on the north frontage of Sir Francis Drake Boulevard between La Cuesta and El Portal Drives. The scope of work includes but is not limited to: tree protection, demolition, clearing and grubbing, irrigation, soil amendment, mulch, planting, and a maintenance period. Engineer's Estimate: $95,000 Bid Opening Date & Time (On Zoom): 1:00 pm on Thursday May 2, 2024 Zoom Link for bid opening: https://us06web.zoom.us/j/85251761035?pwd=qIcF6d2NiKbtzyROh5bqCyLJ2NXyQf.1 Zoom ID & Password: Zoom Meeting ID: 852 5176 1035 Password: 837675 If submitting a paper bid it needs to be addressed to the Director of Marin County Parks and delivered to: Marin County Civic Center 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
05/02/2024 08:00 PM UTC
ENG 2024-04 - 2024 Road Sealant Project
Project Name: 2024 Road Sealant Project County Project No.: 2024-04 Project Contact & Email: Bradley Kurz bradley.kurz@marincounty.gov Project Description: Improvements for the 2024 Road Sealant Project generally consists of striping and marking referencing and removal; slurry seal; driveway sealant; and traffic striping and pavement markings. The work will take place on the roads listed below and includes various roadways, parking lots and pathways around the Civic Center campus as well as various roadways in the neighborhoods of Lucas Valley, Tamalpais, Green Point and Santa Venetia. Engineer's Estimate: $650,000 Bid Opening Date & Time (On Zoom): Wednesday, April 24th, 2024 at 2:30PM Zoom Link for bid opening: https://us04web.zoom.us/j/75936698358?pwd=82oXFE7ta74jU27mmbXKdIowYOaudo.1 Zoom Meeting ID: 759 3669 8358, Password: DPWENG2024 If submitting a paper bid it needs to be addressed to the Director of Public Works and delivered to: Marin County Civic Center - Department of Public Works 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
04/24/2024 09:30 PM UTC
MCP 2024-01 HAL BROWN BRIDGE AND PATHWAY REPLACEMENT PROJECT
Project Name: HAL BROWN BRIDGE AND PATHWAY REPLACEMENT PROJECT Project Contact & Email: Jacob Millard Jacob.Millard@marincounty.gov Project Description: The project is located in Creekside Marsh, a restored wetland between Bon Air Road and the Corte Madera Creek multi-use pathway. The scope of the project generally includes removing 2,300 square feet of existing asphalt pathway and an existing wood-framed bridge and foundations; and the installation of a new prefabricated bridge, an elevated wooden boardwalk, and new sections of asphalt pathways. The new bridge, boardwalk and pathway will be 10-feet wide and shall be compliant with all ADA accessibility requirements. The existing asphalt pathway will be removed, backfilled with native soils, and regraded to match existing adjacent grades. Construction of the new raised pathway includes the use of asphalt pavement, aggregate base, and lightweight backfill material. The purpose of the lightweight backfill is to reduce settlement in the underlying bay mud. The new prefabricated bridge will span 120 feet between new concrete abutments. The new wooden boardwalk will be approximately 47 feet in length and span between new concrete abutments. Helical piers will be utilized to support the concrete abutments and wooden boardwalk. The new sections of asphalt pathways will be installed at both ends of the project, adjacent to the new prefabricated bridge and adjacent to the new wooden boardwalk. Construction of bridge abutments, boardwalk, and raised pathway will be outside the limits of wetlands. Engineer's Estimate: $774,000 Bid Opening Date & Time (On Zoom): Zoom Link for bid opening: https://us06web.zoom.us/j/85217923919?pwd=qPjwKaUxa8mYkER7aiSQODmbBa9FRr.1 Zoom Meeting ID: 852 1792 3919 Zoom Password: 517887 Bids must be submitted electronically through Bid Express®, or by submitting sealed paper bids to the Director of Marin County Parks via the Administration desk at 3501 Civic Center Drive, Suite 304, San Rafael, CA 94903, on or before the date and time noted above, at which time bids will be publicly opened and read aloud on Zoom. Zoom meeting details noted above.
04/19/2024 04:00 PM UTC
MCP 2024-02 MCNEARS BEACH PIER REPAIR PROJECT
Project Name:MCNEARS BEACH PIER REPAIR PROJECT Project Contact & Email: Tara McIntire Tara.McIntire@marincounty.gov Project Description: Improvements for this project will generally include installation of temporary shoring to stabilize the end of the pier causeway followed by removal of the sunken portion of a vessel and repair of damage to one prestressed concrete pile, a section of wood railing, a steel expansion joint, and concrete curb. This damage occurred as a result of a vessel impact. Two exclusive alternate bid scope items are included for the repair of damaged Pile F14, that involve either repair of existing Pile F14 or installation of one precast concrete pile and extension of one pile cap at Bent 14. The repair detail and associated alternate bid item will be determined after additional underwater pile inspection is performed during construction. Alternate Bid Item A1 – Pile Collar Repair will be used unless the underwater pile inspection indicates that the existing Pile F14 cannot be repaired and reused, in which case Alternate Bid Item A2 – Driven Pile Repair will be used. Engineer's Estimate: $3,268,000 Public Bid Opening to be conducted on Zoom. Bid Opening Date & Time (On Zoom): Thursday, April 18, 2024 at 2:00 PM Pacific Time Zoom Link for bid opening: https://us06web.zoom.us/j/88078231005?pwd=z8fa6wXArEfgmKfeO36TycMy3AzOOF.1 Zoom Meeting ID: 880 7823 1005 Zoom Password: 443197 If submitting a paper bid it needs to be addressed to the Director of Marin County Parks and delivered to: Marin County Civic Center - Administration Desk 3501 Civic Center Drive, Suite 304 San Rafael, CA 94903
04/18/2024 09:00 PM UTC
81 - 90 of 176 Solicitations