General Info

Business Logo

Office of the Adjutant General - North Dakota Army National Guard - Directorate of Installations and Environment

PO Box 5511, Bismarck, ND 58506-5511
(701) 333-2069


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Heat Pump Replacement, Bldg. 400, Fraine Barracks (Project 2508)
HEAT PUMP REPLACEMENT Bldg. 400, Fraine Barracks Bismarck, North Dakota Project Number 2508 IFB 25-10 Mechanical Construction IFB 25-11 Electrical Construction IFB 25-12 Total Combined Construction Architect's Name: Ackerman-Estvold Estimated Price Range (Magnitude of Construction): Mechanical Construction: between $500,000 and $1,000,000 Electrical Construction: between $25,000 and $100,000 Total Combined Construction: between $500,000 and $1,000,000 The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
06/24/2025 06:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Concrete Apron Sealing and Repairs, Cold Storage Bldg. 6500, Camp Gilbert C. Grafton (Project 2505)
CONCRETE APRON SEALING AND REPAIRS Cold Storage Bldg. 6500 Camp Gilbert C. Grafton Devils Lake, North Dakota Project Number: 2505 IFB 25-08 Total Construction Architect's Name: Shultz + Associates Architects Estimated Price Range (Magnitude of Construction): Between $500,000 and $1,000,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
06/18/2025 06:00 PM UTC
Air Handler Replacement, Bldg. 6400, Camp Gilbert C. Grafton (Project 2317)
AIR HANDLER REPLACEMENT Bldg. 6400 Camp Gilbert C. Grafton Devils Lake, North Dakota Project Number: 2317 IFB 25-09 Total Construction Architect's Name: Mutchler Bartram Architects Estimated Price Range (Magnitude of Construction): Between $500,000 and $1,000,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
06/18/2025 06:00 PM UTC
Building Remodel, Barracks 2930, Camp Gilbert C. Grafton (Project 2502)
BUILDING REMODEL Barracks 2930 Camp Gilbert C. Grafton Devils Lake, North Dakota Project Number 2502 IFB 25-04 General Construction IFB 25-05 Mechanical Construction IFB 25-06 Electrical Construction IFB 25-07 Total Combined Construction Architect's Name: Mutchler Bartram Architects, P.C. Estimated Price Range (Magnitude of Construction): General Construction: Between $1,000,000 and $5,000,000. Mechanical Construction: Between $1,000,000 and $5,000,000. Electrical Construction: Between $250,000 and $500,000. Total Combined Construction: Between $1,000,000 and $5,000,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
06/04/2025 06:00 PM UTC
Road and Parking Lot Repairs, ND Veterans Cemetery, Mandan (Project 2506)
ROAD AND PARKING LOT REPAIRS ND Veterans Cemetery Mandan, North Dakota IFB 25-03 Total Construction Project Number: 2506 Engineer's Name: Shultz + Associates Architects Estimated Price Range (Magnitude of Construction): Between $500,000 and $1.000,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
03/06/2025 07:00 PM UTC
Cooling Tower Replacement, Bldg. 050, Fraine Barracks, Bismarck (Project 2501)
COOLING TOWER REPLACEMENT Bldg. 050 Fraine Barracks Bismarck, North Dakota IFB 25-02 Total Construction Project Number: 2501 Architect's Name: Ackerman-Estvold Estimated Price Range (Magnitude of Construction): Between $100,000 and $250,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
02/19/2025 07:00 PM UTC
Roof Replacement, Bldg. 3420, Minot AFRC (Project 2204)
ROOF REPLACEMENT Bldg. 3420 Minot Armed Forces Reserve Center Minot, North Dakota IFB 25-01 Total Construction Project Number: 2204 Architect's Name: Ackerman-Estvold Estimated Price Range (Magnitude of Construction): Between $1,000,000 and $5,000,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
02/12/2025 07:00 PM UTC
BOILER REPLACEMENT, FMS #3, Grand Forks (2421)
Boiler Replacement FMS #3, Bldg. 1511 Grand Forks, North Dakota Project Number 2421 IFB24-43 Total Construction Architect's Name: Shultz + Associates Architects Estimated Price Range (Magnitude of Construction): Between $250,000 and $500,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
09/12/2024 07:00 PM UTC
FUEL POINT UPGRADES, FMS 3, GF (2420)
Fuel Point Upgrades FMS 3 Grand Forks, North Dakota Project 2420 IFB24-42 Total Construction Architect's Name: Mutchler Bartram Architects Estimated Price Range (Magnitude of Construction): Between $250,000 and $500,000 The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
09/05/2024 07:00 PM UTC
OFFICE REMODEL, G9 AREA, Bldg. 030, Fraine Barracks (2416)
Office Remodel, G9 Area Bldg. 030, Fraine Barracks Bismarck, North Dakota Project Number 2416 IFB24-38 General Construction IFB24-39 Mechanical Construction IFB24-40 Electrical Construction IFB24-41 Total Combined Construction Architect's Name: Shultz + Associates Architects Estimated Price Range (Magnitude of Construction): General Construction: Between $250,000 and $500,000. Mechanical Construction: Between $100,000 and $250,000. Electrical Construction: Between $25,000 and $100,000. Total Combined Construction: Between $500,000 and $1,000,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
09/05/2024 07:00 PM UTC
ROOF REPLACEMENT, ARMORY 6400, Camp (Project 2425)
ROOF REPLACEMENT Armory Building 6400 Camp Gilbert C. Grafton Devils Lake, North Dakota Project Number 2425 IFB24-34 General Construction IFB24-35 Mechanical Construction IFB24-36 Electrical Construction IFB24-37 Total Combined Construction Project Location: Camp Gilbert C. Grafton, Devils Lake, North Dakota Architect's Name: Shultz + Associates Architects Estimated Price Range (Magnitude of Construction): General Construction: Between $500,000 and $1,000,000. Mechanical Construction: Between $100,000 and $250,000. Electrical Construction: Between $25,000 and $100,000. Total Combined Construction: Between $500,000 and $1,000,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
08/28/2024 07:00 PM UTC
1 - 10 of 60 Solicitations
← Previous 1 3 4 5 6