Aurora Park Utility Improvements
This project includes the extension of underground sanitary sewer, water main, and natural gas utilities related to the Aurora Park redevelopment. Additionally, this project will include the installation of a new 1.6 sanitary pumping station located at the Aurora Park site and the rehabilitation of the existing Marketplace at Four Corner Pump Station.
Engineer's Estimate: $7,500.000.00
Mandatory Site Meeting: Thursday, September 3, 2026 at 9AM
Location: 65 W. Pioneer Trail, Aurora, OH 44202
The Q&A module will be disabled 48-hours before the bid opening.
| 09/16/2026 02:00 PM UTC |
| Number | Deadline |
|---|---|
|
Turf and Landscape Maintenance Program
The City of Aurora seeks a reputable contractor to perform landscaping services for the 2026 season (approximately eight months, at the beginning of April through approximately the end of November). This is a one-year contract with renewal options for years 2 and 3.
Budgeted Amount (Year 1): $65,000.00
| 09/15/2025 02:00 PM UTC |
|
Pricing Procurement: Sludge Screw Conveyor System
The City of Aurora dewaters aerobically digested sludge to 12% Total Solids with a 1.5 Meter Belt Filter press. Dewatered sludge cake is dropped into a chute at the end of the dewatering press and conveyed ten vertical feet to the top of a truck with a load off container. The belt filter press is raised 36 inches from the floor. When the truck is full, it is driven to an adjacent Sludge Storage Structure and dropped on a concrete floor. The Owner wishes to eliminate the need for conveying sludge to the Sludge Storage Building via a truck.
The City of Aurora will install this system including all foundations for structural support including support in the Sludge Dewatering Building. The Supplier shall co-ordinate support requirements of the conveyor system to properly interface to foundation support locations determined by the City. The project includes delivering all component parts to the City of Aurora Westerly WWTP at 1230 W. Garfield Road, Aurora, OH 44202.
UPDATED ZOOM INFORMATION
Meeting ID: 864 7652 6215
Password: 44202
| 08/29/2025 02:00 PM UTC |
|
Citywide Pavement Markings Program
Project Description: The City of Aurora seeks to enter into a contract with a reputable company to perform annual pavement marking services. This is a one-year contract with renewal options for years 2 and 3.
Annual Budget: $145,000.00
| 08/26/2025 02:00 PM UTC |
|
Concrete Repair Program
The City of Aurora will utilize a contractor to perform concrete repairs within city limits. Contractor would be responsible for a variety of services including: full depth concrete road repairs, crack sealing, catch basin repairs, ADA compliance upgrades, new sidewalk installation, etc.
The city budgets for concrete repairs annually. Pricing is to be provided per service by unit price. Repairs will be requested by the contractor based on the city's current needs.
Budget: $350,000.00
**Bid bond should reflect the city's budgeted amount**
| 08/26/2025 02:00 PM UTC |
|
Aurora Park Earthwork - Phase 1
Project Description: The work covered by the specifications consists of demolition of underground infrastructure, surface asphalt and concrete pavements, concrete and steel bulkhead walls, remnant reinforced concrete structures, and other miscellaneous site demolition. Removal and salvage of existing trees. Mass re-grading of site earthwork to prepare a more level subgrade for the future park development, including placement of embankment soil in future lawn areas.
Engineer's Estimate
Base Bid: $1,080,000.00
Alternate: $160,000.00
Total Estimate: $1,240,000.00
| 08/20/2025 02:00 PM UTC |
|
Chandler Lane and Chandler Drive Watermain Replacement
Project Description: The project involves the installation 1,050 LF of 6 inch PVC waterline (open cut), 15 LF of 6 PVC waterline with casing pipe, 230 LF of 6 inch fusible PVC waterline (HDD), replacement of existing fire hydrants, valves, service connections, and appurtenances. Also included is site restoration. The proposed waterline is to replace the aging ductile iron waterline.
Engineer's Estimate: $504,735.00.
| 06/17/2025 02:00 PM UTC |
|
Floodplain Restoration and Stormwater Control - Rebid
Project Description: This project will install multiple stormwater control measures on multiple city-owned and purchased properties within the Geauga Lake Subdivision. Stormwater control measures are designed to reduce neighborhood flooding and include green infrastructure elements. This project is partially funded by a Hazard Mitigation Grant.
Engineer's Estimate: $339,416.00
| 06/03/2025 02:00 PM UTC |
|
Aurora Park Spring 2025 Demolition
The City of Aurora is seeking a qualified Contractor to perform structural demolition services as outlined in the bid. The Work consists of razing, removing, and disposing of selected buildings, structures, foundations, obstructions, building slabs, concrete pavement, asphalt pavement and selective piles of debris.
Desired completion date is June 30, 2025. Required completion date is 60 days from Notice to Proceed.
| 05/20/2025 02:00 PM UTC |
|
Floodplain Restoration and Stormwater Control
Project Description: This project will install multiple stormwater control measures on multiple city-owned and purchased properties within the Geauga Lake Subdivision. Stormwater control measures are designed to reduce neighborhood flooding and include green infrastructure elements. This project is partially funded by a Hazard Mitigation Grant.
Engineer's Estimate: $328,669.00
| 05/06/2025 02:00 PM UTC |
|
South Chillicothe Road - Streetlight Installation
Project Description: The work covered by the specifications consists of the installation of 18 decorative light posts (pre-purchased and supplied by the City of Aurora), concrete bases, 2,058 linear feet of PVC conduit with wires, landscape restoration and maintenance of traffic. Several portions of the conduit shall be bored or directionally drilled. The project is anticipated to begin July 7, 2025 and must attain Final Completion by August 8, 2025.
Engineer's Estimate: $225,602.00
| 05/05/2025 02:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.