City of Aurora, OH
158 W. Pioneer Trail, Aurora, OH 44202
(330) 995-9116
158 W. Pioneer Trail, Aurora, OH 44202
(330) 995-9116
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
Aurora Park Utility Improvements
This project includes the extension of underground sanitary sewer, water main, and natural gas utilities related to the Aurora Park redevelopment. Additionally, this project will include the installation of a new 1.6 sanitary pumping station located at the Aurora Park site and the rehabilitation of the existing Marketplace at Four Corner Pump Station.
Engineer's Estimate: $7,500.000.00
Mandatory Site Meeting: Thursday, September 3, 2026 at 9AM
Location: 65 W. Pioneer Trail, Aurora, OH 44202
The Q&A module will be disabled 48-hours before the bid opening.
| 09/16/2026 02:00 PM UTC |
| Number | Deadline |
|---|---|
|
Various Waterline Replacements - Aurora, Ohio (Re-Bid)
The project consists of installing 63 feet of 12-inch watermain, 117 feet of 10-inch watermain (60 feet bored and jacked), 1,758 feet of 8-inch watermain (990 feet horizontal directional-drilled), hydrants, valves, service connections, incidental pavement and sidewalk repairs, and maintenance of traffic. Due to the importance of not interrupting critical water supply routes and major arterial roads, the installation of three insta-valves and night-only work will be required in various locations. Additional work on Maple Lane will involve removal and replacement of 900 linear feet of pavement, removing and replacing 525 feet of storm sewers and 10 catch basins. Any road openings begun in 2023 shall have permanent surface course installed, as per plan, prior to November 15th, 2023. Any remaining proposed road openings not completed in 2023 may commence in spring 2024 in consultation with city staff based upon weather conditions and availability of asphalt. The Maple Lane portion of this project shall be completed first. This project must attain final completion by June 28th, 2024.
Engineer's Estimate
Base Bid: $ 1,348,358.83
Alternative #1: $ 44,781.00
PAPER BONDS MUST BE DELIVERED TO THE BROWN KEIDEL SERVICE CENTER AT 158 W. PIONEER TRAIL, AURORA, OH 44202 BEFORE THE BID OPENING.
Join Zoom Meeting
https://us02web.zoom.us/j/82710155798?pwd=T2FpcUE4N1l6Qjh2MDZidG5uQVBuQT09
Meeting ID: 827 1015 5798
Passcode: 456072
| 06/20/2023 02:00 PM UTC |
|
Various Waterline Replacements - Aurora, Ohio
Project Description: The project consists of installing 63 feet of 12-inch watermain, 117 feet of 10-inch watermain (60 feet bored and jacked), 1,758 feet of 8-inch watermain (990 feet horizontal directional-drilled), hydrants, valves, service connections, incidental pavement and sidewalk repairs, and maintenance of traffic. Due to the importance of not interrupting critical water supply routes and major arterial roads, the installation of three insta-valves and night-only work will be required in various locations. Additional work on Maple Lane will involve removal and replacement of 900 linear feet of pavement, removing and replacing 525 feet of storm sewers and 10 catch basins. Due to the City of Aurora 4th of July Festival, the Maple Lane and State Route 43/Pioneer Intersection portions of this project shall not commence before July 5th, 2023. This project must attain final completion by November 1st, 2023.
Engineer's Estimate
Base Bid: $ 965,135.41
Alternate#1: $ 37,950.00
PAPER BONDS MUST BE DELIVERED TO THE BROWN KEIDEL SERVICE CENTER AT 158 W. PIONEER TRAIL, AURORA, OH 44202 BEFORE THE BID OPENING.
| 05/22/2023 02:00 PM UTC |
|
Fire Station #1 Bay Ceiling Improvements
The ceiling at the Fire Station, within the garage bay, will not hold paint. Therefore, the city wishes to overlay the ceiling with new drywall and apply paint to correct the underlying issues. The general scope of work includes the overlaying drywall over the existing ceiling and applying paint.
Due to the complexity of the fixtures on the ceiling, a site visit will be held at the Fire Station on Wednesday, April 12 at 10AM.
Electronic bids will be opened by the City of Aurora via an online Zoom meeting at this link: https://us02web.zoom.us/j/85484162509 April 18, 2023 at 10:00AM.
| 04/18/2023 02:00 PM UTC |
|
Bretschneider Park Bridge Replacement
This project includes the demolition and replacement of the existing single span timber trail bridge connecting the City of Aurora’s Bretschneider Park (located at 881 East Pioneer Trail) to Cleveland Audubon Society’s Aurora Sanctuary over Hickory Creek. The replacement structure is a new, single span, 8’ wide timber pedestrian bridge on concrete abutments. Included in the scope of work is trail work as needed to accommodate the proposed bridge span and facilitation of access to the site.
Engineer's Estimate: $231,184.63
Mandatory Pre-Bid Meeting: Tuesday, March 14, 2022 at 9:00 a.m.
Location: 881 East Pioneer Trail, Aurora, OH 44202
Bid Opening Zoom Link: https://us02web.zoom.us/j/83593723353
| 03/22/2023 02:00 PM UTC |
|
Paddock River Preserve GC1 Bridge Replacement
This project includes the demolition and replacement of the existing single-span steel beam bridge on concrete abutments that carries the trail over the Aurora Branch stream adjacent to Aurora’s Parks and Recreation Department maintenance building. The replacement structure is a new, single span prefabricated truss pedestrian bridge on reinforced concrete abutments.
Engineer's Estimate is: $312,664.58
Mandatory Pre-Bid Meeting: Tuesday, March 14, 2022 at 11:00 AM.
Location: 159 Trails End, Aurora, OH 44202
Bid Opening Zoom Link: https://us02web.zoom.us/j/83593723353
| 03/22/2023 02:00 PM UTC |
|
Road Paving Program - City of Aurora
The work covered by the specifications includes furnishing all labor, equipment and the noted material for street
improvements including pavement planing, partial depth pavement repairs, asphalt, resurfacing, asphalt, drive aprons, and pavement markings including all appurtenances. These improvements shall begin no later than May 1, 2023 and must attain Final Completion by July 1, 2023. All bidders and subcontractors must be ODOT prequalified in the categories required for the type of work they are to perform.
The engineer’s estimates for the proposed improvements:
Base Bid Estimate: $902,814.46
Alternate #1 Bid Estimate: $131,209.10
Alternate #2 Bid Estimate: $135,173.32
Alternate #3 Bid Estimate: $ 31,797.86
Alternate #4 Bid Estimate: $ 91,727.11
Alternate #5 Bid Estimate: $ 124,960.77
Alternate #6 Bid Estimate: $ 124,960.77
Alternate #7 Bid Estimate: $ 902,814.46
Alternate #8 Bid Estimate: $131,209.10
Alternate #9 Bid Estimate: $135,173.32
Alternate #10 Bid Estimate: $ 31,797.86
Alternate #11 Bid Estimate: $ 91,727.11
Alternate #12 Bid Estimate: $ 124,960.77
Alternate #13 Bid Estimate: $ 124,960.77
| 03/20/2023 02:00 PM UTC |
|
Traffic Signal Maintenance Program - City of Aurora
The City of Aurora is pursuing a contract with a reputable contractor to provide preventative maintenance and emergency repairs on city-owned traffic signals, pedestrian signals, and school zone signals.
As a result of recent upgrades to the traffic signals, the first year of the contract may be limited as the new infrastructure is covered by a maintenance contract by the installer.
Budgeted Amount: $40,000.00
Electronic bids will be opened by the City of Aurora via an online Zoom meeting at this link: https://us02web.zoom.us/j/89954303019 March 1, 2023 at 10:00AM.
| 03/01/2023 03:00 PM UTC |
|
Joint/Crack Sealing Program - City of Aurora
The City of Aurora is seeking to enter into a contract with a reputable company to perform joint/crack sealing work on dedicated concrete roadways. Required materials include: Craftco RoadSaver 515 (or equivalent) and Fibrecrete G (or equivalent).
Budgeted Amount: $65,000.00
Electronic bids will be opened by the City of Aurora via an online Zoom meeting at this link: https://us02web.zoom.us/j/89954303019 March 1, 2023 at 10:00AM.
| 03/01/2023 03:00 PM UTC |
|
Turf and Landscape Maintenance - City of Aurora
The City of Aurora seeks a reputable contractor to perform landscaping services for the 2023 season (approximately eight months, at the beginning of April through approximately the end of November). This is a one-year contract with renewal options for years 2 and 3.
Budgeted Amount (Year 1): $65,000.00
Electronic bids will be opened by the City of Aurora via an online Zoom meeting at this link: https://us02web.zoom.us/j/89954303019 March 1, 2023 at 10:00AM.
| 03/01/2023 03:00 PM UTC |
|
Line Striping - City of Aurora
The City of Aurora seeks to enter into a contract with a reputable company to perform annual road striping services. This is a one-year contract with renewal options for years 2 and 3.
Budgeted Amount (Year 1): $100,000.00
Electronic bids will be opened by the City of Aurora via an online Zoom meeting at this link: https://us02web.zoom.us/j/89954303019 March 1, 2023 at 10:00AM.
| 03/01/2023 03:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.