General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-44-2
Ozone Park Subdivision Drainage------------------------Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary for drainage improvement in the Ozone Park Subdivision. Work to include removing and replacing driveway culverts and installing subsurface drainage as specified along Orleans Ave (R04D002) Covington, LA and Walnut St (R04D009) Covington, LA.
11/04/2026 08:00 PM UTC
26-32-1
Peg Keller Rd Drainage---------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing driveway pipes as specified along Peg Keller Rd (R060031) located in Abita Springs; Louisiana.
11/05/2026 08:00 PM UTC
26-34-1
Lake D' Este Dr Drainage-----------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainages and road repairs by removing existing failed insert, install new pipe, repair catch basins, install CIPP liner and removing and replacing concrete panels as specified along Lake D’ Este Dr (R08L021) located in Slidell, Louisiana.
11/10/2026 08:00 PM UTC
26-33-1
Wildwood Farms Subdivision Drainage ----The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing driveway pipes, catch basins, and drain pipe as specified along Max Mercer Rd (R06I026); Cecil Fleming Rd (R06I009) located in Pearl River, Louisiana.
11/12/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
26-19-1
Traffic Calming Program - Red Gap & Northern Homes------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to implement traffic calming solutions by way of asphaltic concrete speed tables, in addition to striping and respective speed table striping in on several residential streets in Red Gap & Northern Homes Subdivisions, Mandeville, La. This work, as specified in these documents and construction plans, is located along Soell Dr (R03L011), Hunt Dr (R03L012), Parker Dr (R03L014), Mire Dr (R03L016), 11th Ave (R03L013), Helenbirg Rd (R03L001), 6th Ave (R03L005), Lincoln St (R03L025), and North St (R03L026) Sections 11-14, Township 7S Range 11E.
07/16/2026 07:00 PM UTC
26-21-1
Lacombe Turning Radii Improvements___ The Parish requests a contractor to improve turning radii by installing drain pipes, catch basins, patching and shoulder materials as specified along Charlotte St (R07E044) Lacombe ; N. 25th St (R07E030) Lacombe ; Cloverland Dr (R07E040) Lacombe ; N. 8th St (R07E002) Lacombe, Louisiana.
07/16/2026 07:00 PM UTC
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
07/15/2026 07:00 PM UTC
26-29-2
Charlie St. Extension---------------------------------This project involves the full roadway construction of the extension of Charlie St to Three Rivers Rd. The project will include subsurface drainage & installation of open ditches, earthwork & base course, new asphalt concrete roadway paving, and signage & striping.
06/24/2026 07:00 PM UTC
26-33-2
Tammany Hills Drainage-----------------------------------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve area drainage by removing and replacing drainage culverts and installing sub-surface pipe, as well as catch basins, as specified along D St (R03L040), Covington, LA; F St (R03L041), Covington, LA; Webster St (R03L067), Covington, LA.
06/24/2026 07:00 PM UTC
26-32-2
Utility Point Of Repair------------------------------- The WORK shall consist of point repairs, rehabilitation, and replacement of water and sewer infrastructure. This WORK shall include scheduled and emergency repairs of water and sewer infrastructure. The WORK may also include limited extensions of new water and/or sewer infrastructure to provide service.
06/23/2026 07:00 PM UTC
26-30-2
2026 Parishwide Striping--------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to provide and install thermoplastic striping as specified along the following Parish roads: • Palm Blvd (R03I003) in Covington ; • Branch Crossing Dr (R03H018) in Covington ; • Dogwood Ln (R03I012) in Covington ; • Lake Ramsey Rd (R03D012) in Covington ; • Viola St (R04E070) in Mandeville ; • Lacombe Harbor Rd (R07H028) in Lacombe ; • E. Violet St (R07C112) in Lacombe ; • Rapatel St (R04E025) in Mandeville ; • Lonesome Rd (R04D032) in Mandeville ; • Pleasant Dr (R09C019) in Slidell ; • Camp Villere Rd (R09D012) in Slidell ; • Dixie Ranch Rd (R09C033) in Slidell ; • Garden Dr (R09G051) in Slidell ; • Liberty Dr (R09G047) in Slidell ; • Brookter St (R08V008) in Slidell ; • N. 3rd Ave (R08J006) in Slidell ; • Lake Village Blvd (R08L026) in Slidell ; and • Tammany Trace (R11A001) various locations.
06/17/2026 07:00 PM UTC
26-17-1
Tammany Trace Solar Pedestrian Activation System Replacement----------St. Tammany Parish Government is requesting a Contractor to provide and install the LightGuard Solar System or an approved equal. The Contractor shall provide all labor, materials, and equipment necessary to remove existing solar pedestrian crossing systems and install new solar-powered pedestrian activation systems at designated locations along the Tammany Trace.
06/17/2026 07:00 PM UTC
26-28-2
Area 1 Drainage Improvements----------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by installing pipe and catch basins to widen the turning radius as specified along the following Parish roads: • River Rd (R3H001) Covington, LA; • Penn Mill Rd (R03D007) Covington, LA; • Stanga Rd (R01G002) Covington, LA; • Gayle Rd (R01G004) Covington, LA; and • Northridge Dr (R01B018) Covington, LA.
06/16/2026 07:00 PM UTC
26-16-1
DPW Hickory Maintenance Facility Fuel Tank/Dock---------------------Contractor will be responsible for turnkey delivery and installation of two (2) 5,000-gallon UL-2085 Fireguard Fuel Tanks or approved equal and (1) Automated Fuel Management System at St Tammany Parish Hickory Maintenance Barn located at 67835 Hwy 41, Pearl River, LA 70452.The fuel tanks shall comply with all federal, state, and local regulations governing fuel tank installation. The new fuel management system must be an OPW Petro Vend PV200. No substitutions will be allowed due to compatibility issues with the existing OPW Petro Vend Fuel Management System already in place.
06/11/2026 07:00 PM UTC
21 - 30 of 1004 Solicitations
1 3 5 6 7 8 9 … 100 101