General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-44-2
Ozone Park Subdivision Drainage------------------------Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary for drainage improvement in the Ozone Park Subdivision. Work to include removing and replacing driveway culverts and installing subsurface drainage as specified along Orleans Ave (R04D002) Covington, LA and Walnut St (R04D009) Covington, LA.
11/04/2026 08:00 PM UTC
26-32-1
Peg Keller Rd Drainage---------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing driveway pipes as specified along Peg Keller Rd (R060031) located in Abita Springs; Louisiana.
11/05/2026 08:00 PM UTC
26-34-1
Lake D' Este Dr Drainage-----------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainages and road repairs by removing existing failed insert, install new pipe, repair catch basins, install CIPP liner and removing and replacing concrete panels as specified along Lake D’ Este Dr (R08L021) located in Slidell, Louisiana.
11/10/2026 08:00 PM UTC
26-33-1
Wildwood Farms Subdivision Drainage ----The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing driveway pipes, catch basins, and drain pipe as specified along Max Mercer Rd (R06I026); Cecil Fleming Rd (R06I009) located in Pearl River, Louisiana.
11/12/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
316-00-17-47-2
Lake Village Drainage Improvements/N. Pearl Dr Mill and Overlay..... A. Lake Village Drainage Improvements o Selective tree removal o Demolition and removal of existing catch basins and storm drains. o Installation of new junction boxes and catch basins. o Installation of approximately 2,000 linear feet of 60” RCP storm drain and miscellaneous storm drains ranging from 15” to 24” diameter. o Roadway repair, sidewalk construction, and driveway construction. o Grading, erosion and sediment control, traffic control, and vegetation establishment. B. North Pearl Mill and Overlay o 2” mill and overlay from Station 01+38 (Gause Boulevard) to Station 44+50 (Lake Erie Drive) as shown in the Plans. o Guardrail system at W-15 Canal crossing o Striping
09/07/2017 07:00 PM UTC
315-05-17-50-2
2017 Districts 6 & 5 Road Improvements.....This is a district capital road improvement project for Districts 6 & 5. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces, as specified, along Firetower Rd (R06H001) Section 5 Township 7S Range 14E; St Amand St (R10C002) Section 19 Township 6S Range 12E; Sandy Ln (R04D057) Section 27 Township 7S Range 11E; and Harper Rd #2 (R06F005) Section 15 Township 7S Range 14E.
09/05/2017 07:00 PM UTC
311-00-17-52-2
2017 District 11 Road Improvements....This is a District Capital Road Improvement Project for District 11. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Azalea Ln (R06L005) Section 33 Township 7S Range 13E ; Red Mill Rd (R07C042) Section 28 Township 8S Range 13E (Lacombe, La.).
09/05/2017 07:00 PM UTC
416-15-17-53-2
Lower W-15 Area Drainage Improvements...............................The completed Work will provide Owner with a regional stormwater detention pond known as the Tenet Pond. Additional details describing the work are provided in Section 01 11 00 of Division 01, Technical Specifications.
08/31/2017 07:00 PM UTC
015-60-17-51-2
Windshield Repair/ Replacement
08/16/2017 07:00 PM UTC
303-00-17-49-2
2017 District 3 Road Improvements.....This is a District Capital Road Improvement Project for District 3. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; and Stephanie Ln (R01B021) Section 8 Township 6S Range 10E, Covington, Louisiana.
08/01/2017 07:00 PM UTC
339-00-17-46-2
STPC - Built-In-Cooler for the Morgue ----- The work shall include the removal of the existing controlled environment room (existing cooler) and the supply and installation of a new controlled environment room (Cooler), per the specifications.
07/27/2017 07:00 PM UTC
440-15-17-39-2
Airport Corporate Hangar Facilities ----- This project consists of the construction of a terminal building, a hangar building and ramp, a parking lot and drive, a water line and other site work.
07/27/2017 07:00 PM UTC
522-00-17-45-2
HVAC Controllers Upgrade... The Contractor must provide, install, program, and commission new HVAC network controllers, server and associated equipment in two (2) Parish facilities, as per the specifications.
07/20/2017 07:00 PM UTC
304-00-17-44-2
Woodridge Blvd Drainage and Canary Pine Ct Drainage.... The work specified in this project will require the Contractor to provide all tools, labor, equipment and materials necessary to improve drainage by removing and installing subsurface drainage pipe, cross drain pipe and drives, excavation and embankment on Woodridge Blvd (R04C004) Section 19 Township 8 Range 15 and Canary Pine Court (R04C006) Section 19 Township 8 Range 15.
07/18/2017 07:00 PM UTC
711 - 720 of 1004 Solicitations
1 2 … 68 69 70 72 74 75 76 … 100 101