General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-44-2
Ozone Park Subdivision Drainage------------------------Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary for drainage improvement in the Ozone Park Subdivision. Work to include removing and replacing driveway culverts and installing subsurface drainage as specified along Orleans Ave (R04D002) Covington, LA and Walnut St (R04D009) Covington, LA.
11/04/2026 08:00 PM UTC
26-32-1
Peg Keller Rd Drainage---------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing driveway pipes as specified along Peg Keller Rd (R060031) located in Abita Springs; Louisiana.
11/05/2026 08:00 PM UTC
26-34-1
Lake D' Este Dr Drainage-----------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainages and road repairs by removing existing failed insert, install new pipe, repair catch basins, install CIPP liner and removing and replacing concrete panels as specified along Lake D’ Este Dr (R08L021) located in Slidell, Louisiana.
11/10/2026 08:00 PM UTC
26-33-1
Wildwood Farms Subdivision Drainage ----The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing driveway pipes, catch basins, and drain pipe as specified along Max Mercer Rd (R06I026); Cecil Fleming Rd (R06I009) located in Pearl River, Louisiana.
11/12/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
440-15-17-39-2
Airport Corporate Hangar Facilities ----- This project consists of the construction of a terminal building, a hangar building and ramp, a parking lot and drive, a water line and other site work.
07/12/2017 07:00 PM UTC
622-10-17-48-2
Sewer & Appurtenances Annual Part 2
07/12/2017 07:00 PM UTC
315-45-17-43-2
2017 District 4 Road Improvements.... This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve the roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Copal St (R04C032) Section 45 Township 8S Range 11E; Northlake Dr (R03K061) Section 45 Township8S Range 11E; and Dogwood Dr (R03K020) Section 37 Township 7S Range 11E.
06/27/2017 07:00 PM UTC
622-10-17-35-2
Submersible Pump Annual.....This is not a new bid - previous bid inadvertently closed. The Parish, as a function of Tammany Utilities, owns and operates approximately 50 wastewater treatment plants, 40 water wells, over 200 sewage lift stations and miles of water distribution and sewage collection lines. Tammany Utilities, therefore, routinely has the need for submersible pumps.
06/15/2017 07:00 PM UTC
310-00-17-42-2
Marigny Avenue Drainage Improvements........................ The work specified in this project will require the Contractor to provide all tools, labor, equipment and materials necessary to improve drainage by removing and installing subsurface drainage pipe, cross drain pipe and drives, and performing drainage excavation on Marigny Avenue (R04E115) Section 38 Township 7 South Range 11.
06/14/2017 07:00 PM UTC
300-00-17-36-2
Dove Park Rd. Mill and Overlay ---------- This is a 2017 Capital Road Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, and materials necessary to improve road surfaces by milling and overlaying 2” of asphaltic concrete and installing roadway striping as specified along Dove Park Rd (R04D001) Section 25 Township 7S Range 11E.
06/13/2017 07:00 PM UTC
622-10-17-35-2
Submersible Pump Annual.....The Parish, as a function of Tammany Utilities, owns and operates approximately 50 wastewater treatment plants, 40 water wells, over 200 sewage lift stations and miles of water distribution and sewage collection lines. Tammany Utilities, therefore, routinely has the need for submersible pumps.
06/08/2017 07:00 PM UTC
315-05-17-38-2
2017 District 6 Road Improvements ---------- This is a District Capital Road Improvement Project for District 6. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing road surfaces, as specified, along Sunny Meadow Dr (R10F003) Section 28 Township 6S Range 12E ; and Keen Rd (R10F002) Section 28 Township 6S Range 12E.
06/06/2017 07:00 PM UTC
313-00-17-41-2
Ranch Rd. Drainage Ph 1...... The Contractor will provide all labor, equipment, tools, and materials necessary to improve drainage by the removal of existing drainage structures and drives and for the installation of drainage structures, drives, and pavement patching.
06/06/2017 07:00 PM UTC
300-00-17-40-2
Tchefuncte Parc Bridge at Black River.....The Contractor must provide all labor, equipment, tools, and materials necessary for the removal of timber trestle bridge on timber piles, asphalt paving, installation of class II base course, prcb culvert, concrete headwalls, and incidental sanitary sewer relocation.
05/31/2017 07:00 PM UTC
721 - 730 of 1004 Solicitations
1 2 … 69 70 71 73 75 76 77 … 100 101