St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
26-44-2
Ozone Park Subdivision Drainage------------------------Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary for drainage improvement in the Ozone Park Subdivision. Work to include removing and replacing driveway culverts and installing subsurface drainage as specified along Orleans Ave (R04D002) Covington, LA and Walnut St (R04D009) Covington, LA.
| 11/04/2026 08:00 PM UTC |
|
26-32-1
Peg Keller Rd Drainage---------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing driveway pipes as specified along Peg Keller Rd (R060031) located in Abita Springs; Louisiana.
| 11/05/2026 08:00 PM UTC |
|
26-34-1
Lake D' Este Dr Drainage-----------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainages and road repairs by removing existing failed insert, install new pipe, repair catch basins, install CIPP liner and removing and replacing concrete
panels as specified along Lake D’ Este Dr (R08L021) located in Slidell, Louisiana.
| 11/10/2026 08:00 PM UTC |
|
26-33-1
Wildwood Farms Subdivision Drainage ----The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools,
and materials necessary to improve drainage by removing and replacing driveway pipes,
catch basins, and drain pipe as specified along Max Mercer Rd (R06I026); Cecil Fleming Rd
(R06I009) located in Pearl River, Louisiana.
| 11/12/2026 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
622-10-17-34-2
Sewer and Appurtenances Annual
| 05/17/2017 07:00 PM UTC |
|
302-00-17-32-2
Woodland Dr Road Improvements..........................................
The Contractor must provide all labor, equipment, tools, and materials necessary to improve the road by reconstructing the road surface and applying an asphalt reinforcement grid, as specified.
| 05/16/2017 08:02 PM UTC |
|
300-00-17-30-2
Clipper Drive Bridge..... The Contractor will provide all labor, equipment, tools, and materials necessary for the demolition of a single span slab span bridge and retaining walls and construction of a precast 3-span slab span bridge and sheet pile retaining walls, and all associated earthwork. The work includes riprap, concrete approach slabs, concrete approach pavement with class II base course and guardrails.
| 05/09/2017 07:00 PM UTC |
|
310-00-17-33-2
2016 District 10 Road Improvements ---------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve the road by reconstructing road surfaces as specified.
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
The time for completion is forty-five (45) days from the date specified in the Notice to Proceed + Calculated Rain Days per the attached specifications.
| 05/09/2017 07:00 PM UTC |
|
622-10-17-15-2
Utility Construction and Maintenance Contract
| 05/04/2017 07:00 PM UTC |
|
622-95-17-28-2
Castine EQ Recondition - Static Screen..............................................................The Parish requires a Contractor to provide two (2) static screens.
| 05/03/2017 07:00 PM UTC |
|
416-10-17-18-2
Bayou Chinchuba Phase 2 ---------- Excavation of a 10-ft deep wet pond within an existing dry pond and installation of an aeration system, including electrical service from the main line along the St Tammany Trace to and for the wet pond aeration system. A temporary construction entrance is required through an established construction servitude from Hwy 59 westward to the site, along with other erosion control measured as necessary to prevent migration of sediment into waterways and onto roadways
| 05/02/2017 07:00 PM UTC |
|
123
THIS IS A TEST PROJECT ONLY
| 04/27/2017 03:50 PM UTC |
|
622-04-17-31-2
1.7 Meter Belt Filter Press
| 04/26/2017 07:00 PM UTC |
|
302-00-17-20-2
2017 District 2 Road Improvements -----
This is a District Capital Road Improvement Project for District 2. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Arthur Rd (R03K034) Section 42 Township 6S Range 11E; Jenkins Ave (R03K061) Section 42 Township 6S Range 11E; Kustenmacher Rd (R03K020) Section 36 Township 6S Range 11E; Schiro Rd (R03G004) Section 2 Township 6S Range 11E; and St. Joseph Rd (R03G002) Section 2 Township 6S Range 11E.
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
The time period for completion of the project is 60 calendar days from the date the Notice to Proceed is issued.
| 04/25/2017 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.