General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-44-2
Ozone Park Subdivision Drainage------------------------Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary for drainage improvement in the Ozone Park Subdivision. Work to include removing and replacing driveway culverts and installing subsurface drainage as specified along Orleans Ave (R04D002) Covington, LA and Walnut St (R04D009) Covington, LA.
11/04/2026 08:00 PM UTC
26-32-1
Peg Keller Rd Drainage---------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing driveway pipes as specified along Peg Keller Rd (R060031) located in Abita Springs; Louisiana.
11/05/2026 08:00 PM UTC
26-34-1
Lake D' Este Dr Drainage-----------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainages and road repairs by removing existing failed insert, install new pipe, repair catch basins, install CIPP liner and removing and replacing concrete panels as specified along Lake D’ Este Dr (R08L021) located in Slidell, Louisiana.
11/10/2026 08:00 PM UTC
26-33-1
Wildwood Farms Subdivision Drainage ----The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing driveway pipes, catch basins, and drain pipe as specified along Max Mercer Rd (R06I026); Cecil Fleming Rd (R06I009) located in Pearl River, Louisiana.
11/12/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
311-00-15-46-2
2015 District 11 Road Improvements
01/04/2016 08:00 PM UTC
502-03-15-47-2
2016 Annual Bid
12/30/2015 08:00 PM UTC
502-07-15-34-2
Annual Coffee Services
12/18/2015 08:00 PM UTC
420-26-15-36-2
Reno Hills Sewer Collection - Phase 2 1088 Sewer Force Main
12/09/2015 08:00 PM UTC
307-00-15-45-2
Tanager Dr Drainage Improvements
12/08/2015 08:00 PM UTC
316-00-15-43-2
Slidell Manor Drainage
12/02/2015 08:00 PM UTC
016-06-15-44-2
One (1) EA. 6" Dry Prime Pump
11/30/2015 08:00 PM UTC
460-08-15-40-2
NAMI SE Louisiana Hospital Property Demolition
11/23/2015 08:00 PM UTC
622-10-15-42-2
2016 Hypochlorite Bulk Delivery
11/19/2015 08:00 PM UTC
311-00-15-41-2
Belair Subdivision Ponds and Walking Path Ph1 Improvements
11/10/2015 08:00 PM UTC
831 - 840 of 1004 Solicitations
1 2 … 80 81 82 84 86 87 88 … 100 101