Lawrence Street Pump Station
Project Description: This project consists of construction of a new sanitary pump station and appurtenances to replace existing pump station Engineer's Estimate: $2,500,000
08/28/2026 03:00 PM UTC
New Solicitation
Project Description: This project includes installation of backflow valve on existing 30" water transmission line. The work includes valves, valve vault, water line and appurtenances. Engineer's Estimate: $750,000
09/04/2026 11:53 AM UTC
2 Solicitations

Closed Solicitations

Number Deadline
Transmission Main Backflow Prevention Project
Project Description: This project includes installation of backflow valve on existing 30" water transmission line. The work includes valves, valve vault, water line and appurtenances. Engineer's Estimate: $950,000
07/31/2026 03:00 PM UTC
FAI-M.R. 70502-01.91, PID 120475
SBE GOAL: 10% Federal Authorization Date: 02/09/2026 Description of Job: This project involves the bridge replacement (SFN 2360713) over Fetters Run including approach pavement reconstruction. Estimate: $2,397,701.00
04/01/2026 05:30 PM UTC
FAI-M.R. 70502-01.91, PID 120475
SBE GOAL: 10% Federal Authorization Date: 02/09/2026 Description of Job: This project involves the bridge replacement (SFN 2360713) over Fetters Run including approach pavement reconstruction. Estimate: $1,929,983.29
03/05/2026 03:00 PM UTC
2026 Street Improvement Program - Paving
Project Description: This project involves the pavement planning, asphalt resurfacing and ADA curb ramp upgrades. Engineer's Estimate: $1,491,230.06
02/13/2026 01:45 PM UTC
Arbor Valley Drive Improvements
Project Description: This project involves pavement planing, widening, vertical and horizontal centerline improvements, addition of a dedicated turn lane, curb replacement, and pedestrian connectivity improvements. Engineer's Estimate: $3,005,633.05
02/13/2026 01:30 PM UTC
Lancaster City Hall - Elevator Replacement
Project Description: This project will include, but may not be limited to, the replacement of the existing elevator at 104 East Main Street, Lancaster, Ohio 43130, in accordance with the Drawings and Specifications prepared by the Design Professional. Engineer's Estimate: $750,000
09/25/2025 05:00 PM UTC
Lancaster City Hall Exterior Restoration
Project Description: This project will include, but may not be limited to, the restoration of the building facade, replacement of windows, replacement of the roof, repair / replacement of clock workings, removal of "dog houses" from the Broad Street facade at 104 East Main Street, Lancaster, Ohio 43130, in accordance with the Drawings and Specifications prepared by the Design Professional. Engineer's Estimate: $5,000,000
05/23/2025 02:30 PM UTC
Engine House #3 Auxiliary Building
Project Description: This project involves constructing a new auxiliary engine house behind the current engine house. Engineer's Estimate: $663,470.56
04/25/2025 02:00 PM UTC
2025 Street Improvement Program - Paving
Project Description: This project involves pavement planning, asphalt resurfacing and ADA curb ramp upgrades. Engineer's Estimate: $2,300,000
03/07/2025 07:15 PM UTC
FAI - CR 48/90/555 - VAR PID 120485
DBE GOAL: 7% Description of Job: This project involves pavement planning, asphalt concrete resurfacing, pavement repairs, and other ancillary work on Boving Road from Corp Line to Lincoln Avenue, Hamburg Road from Corp Line to S. Broad Street, and S. Broad Street from Corp Line to Hamburg Road. Estimate: $924,843.28
03/07/2025 07:00 PM UTC