General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-006-100292.1
New Structure Bridge No. 06-0008 Swinging Bridge Over Clear Shade Creek Forest District 06, Gallitzin State Forest Ogle Township, Somerset County, Pennsylvania This project consists of removal of an existing pedestrian suspension bridge and construction of a new suspension pedestrian bridge in the same footprint. Access trail will be overlaid with shale. A new gate will be installed to limit traffic on the trail to pedestrian/hiker only. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $600,000
12/04/2025 06:00 PM UTC
FDC-409-101695.1
Bridge Abutment and Beam Seat Rehabilitation, Bridge No. 6409-0500, Scenic Drive Over Hickory Run, Hickory Run State Park Kidder Township, Carbon County, Pennsylvania Scenic Drive over Hickory Run is a one span prestressed concrete box beam bridge. The existing stone masonry substructure will be repointed, and missing/loose stones will be replaced in the stone masonry pier, abutments and wingwalls. The spalled concrete bridge seats will be repaired. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $50,000
12/04/2025 06:00 PM UTC
FDC-237-103995.4
Backup Generator Installation Laurel Caverns State Park Georges Township, Fayette County Pennsylvania The work under this project consists of providing and installing a propane gas packaged engine generator system adjacent to the electric service area on the grounds of Laurel Caverns State Park (1065 Skyline Drive, Farmington, PA). DGS Small Business Certification Required Engineer's Estimate: $100,000-$600,000
12/18/2025 06:00 PM UTC
FDC-220-10043.1
Area Rehab - Perry Monument Restoration Presque Isle State Park Millcreek Township Erie County, Pennsylvania Work included under this contract consists of the removal and replacement of the seawall cap, cleaning and restoration of the Perry Monument Plaza and stabilization, cleaning, and restoration of the monument. The existing seawall cap will be removed and replaced. The restoration of the plaza includes removal and replacement of deteriorate concrete sidewalk, concrete crack repair, the removal of the knee wall and moat surrounding the monument, installation of concrete bollards with chains connecting the bollards, and lighting upgrades. The stabilization and restoration of the monument includes polymer soil injections, spall repair, removal and replacement of stone, partial stone replacement, repoint mortar joints, replace brick behind stone, and apply waterproofing and anti-graffiti coating to monument. All work will be performed in compliance with the DEP issued Chapter 105 general permit. SDB Participation Goal: 18% VBE Participation Goal: 3% Engineer's Estimate: Over $ 1 Million
12/18/2025 06:00 PM UTC
FDC-220-10043.4
Area Rehab - Perry Monument Restoration Presque Isle State Park Millcreek Township Erie County, Pennsylvania Work included under this contract consists of the removal and replacement of the seawall cap, cleaning and restoration of the Perry Monument Plaza and stabilization, cleaning, and restoration of the monument. The existing seawall cap will be removed and replaced. The restoration of the plaza includes removal and replacement of deteriorate concrete sidewalk, concrete crack repair, the removal of the knee wall and moat surrounding the monument, installation of concrete bollards with chains connecting the bollards, and lighting upgrades. The stabilization and restoration of the monument includes polymer soil injections, spall repair, removal and replacement of stone, partial stone replacement, repoint mortar joints, replace brick behind stone, and apply waterproofing and anti-graffiti coating to monument. All work will be performed in compliance with the DEP issued Chapter 105 general permit. DGS Small Business Certification Required Engineer's Estimate: $30,000- $60,000
12/18/2025 06:00 PM UTC
FDC-010-104061.1
Sproul State Forest Structure Replacements Bridge A: Bridge 10-0062 Pfoutz Valley Road over Hensel Fork Bridge B: Bridge 10-0085 Stony Run Road over UNT to Stony Run Bridge C: Bridge 10-0087 Stony Run Road over Stony Run Bridge D: Bridge 10-0060 Boone Road over Sandy Run Forest District 10, Sproul State Forest Leidy Township, Clinton County, Pennsylvania This project will replace an existing concrete slab bridge structure on Pfoutz Valley Road. The replacement structure is a precast reinforced concrete rigid frame. This project will also replace a corrugated metal structure carrying Stony Run Road over Unnamed Tributary (UNT) to Stony Run. Replacement structure is a precast concrete box culvert. Other work includes rock lining, architectural surface, DSA approach roadway, and guide rail. This project will replace a reinforced concrete pipe with a 73’ long, 87” x 63” (10 Gage) Coated (Polymer) Corrugated Galvanized Steel (CCGSP) Arch Culvert with Flared Galvanized Steel End Sections. Replacement includes DSA approach roadway and rock scour protection. This project will replace an existing reinforced concrete rigid frame on Boone Road. The existing structure is in poor condition. The proposed replacement structure is a 6’-0” precast reinforced concrete box culvert and end sections. SDB Participation Goal: 14% VBE Participation Goal: 3% Engineer's Estimate: over $1 Million
12/18/2025 06:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
FDC-400-10984.1
Dorm Room Renovations Hickory Run State Park Kidder Township, Carbon County, Pennsylvania SDB Participation Goal 15% VBE Participation Goal 3% Engineer's Estimate: $1M+
11/20/2025 06:00 PM UTC
FDC-400-10984.2
Dorm Room Renovations Hickory Run State Park Kidder Township, Carbon County, Pennsylvania DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
11/20/2025 06:00 PM UTC
FDC-400-10984.3
Dorm Room Renovations Hickory Run State Park Kidder Township, Carbon County, Pennsylvania DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
11/20/2025 06:00 PM UTC
FDC-400-10984.4
Dorm Room Renovations Hickory Run State Park Kidder Township, Carbon County, Pennsylvania SDB Participation Goal 16% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1M
11/20/2025 06:00 PM UTC
FDC-009-10014.1
Structure Replacement, Bridge A No. 09-0062, Wallace Mine Road Over UNT to Alex Branch, Bridge B No. 09-0065, Wallace Mine Road Over UNT to Trout Run, Forest District 09, Moshannon State Forest, Lawrence & Goshen Townships, Clearfield County, Pennsylvania Bridge A: replacement of a corrugated metal pipe with precast reinforced concrete pipe with precast reinforced concrete end sections. Bridge B: replacement of a smooth wall corrugated high-density polyethylene pipe with precast reinforced concrete pipe with precast reinforced concrete end sections. DGS Small Business Certification Required Engineer's Estimate: $100,000.00 - $500,000.00
10/09/2025 05:00 PM UTC
FDC-013-10029.1
Structure Replacements, Bridge No. 13-0078, Simons Lane Over Bender Run, Bridge No. 13-0079, Simon Lane Over Portable Run, Forest District 13, Elk State Forest, Shippen Township, Cameron County, Pennsylvania This project will replace two (36” and 48” diameter) corrugated metal pipe culverts on Simons Lane. The existing culverts are both undersized, misaligned with their respective stream channel, and are in poor condition or collapsing. The proposed replacement structures are 6’-0” and 12’-0” precast reinforced concrete box culverts and end sections. SDB Participation Goal 12% VBE Participation Goal 3% Engineer's Estimate: $500,000.00 - $1M
10/09/2025 05:00 PM UTC
FDC-007-10055.1
Structure Replacement, Bridge No. 07-9011, Pine Creek Hollow Road Over UNT to Pine Creek, Forest District 07, Bald Eagle State Forest, Haines Township, Centre County, Pennsylvania This project consists of the demolition of existing corrugated metal pipe arch structure and stone wingwalls and replacement with a precast reinforced concrete rigid frame. Other work includes rock lining, channel lining, architectural surface treatment, guide rail and driving surface aggregate (DSA) approach roadway. DGS Small Business Certification Required Engineer's Estimate: $500,000.00 - $1M
10/09/2025 05:00 PM UTC
FDC-326-10983.1
Iron Master's Mansion Rehabilitation, Susquehanna Riverlands State Park, Hellam Township, York County, Pennsylvania Rehabilitate the Iron Master's Mansion exterior shell and do selective demolition on the interior of the building. SDB Participation Goal 13% VBE Participation Goal 3% Engineer's Estimate: Over $1 Million
10/09/2025 05:00 PM UTC
FDC-009-10016.1
Structure Replacement Bridge No. 09-0066 McGeorge Rd over Alex Branch Forest District 09, Moshannon State Forest Lawrence Township, Clearfield County, Pennsylvania This project consists of demolition of existing corrugated metal pipe arch structure and stone wingwalls carrying McGeorge Road over Alex Branch and replacement with a single cell precast reinforced concrete box culvert. Other work includes rock lining, architectural surface treatment, DSA approach roadway, and guide rail. DGS Small Business Certification Required Engineer's Estimate: $300,000-$550,000
09/25/2025 05:00 PM UTC
FDC-016-10759.1
Structure Replacements & Preservation Bridge A: No. 16-0043 Landrus Road OVER UNT to Babb Creek Bridge B: No. 16-0044 Landrus Road over Bear RUN Bridge C: No. 16-0045 Landrus Road over Silver Run Forest District 16, Tioga State Forest Bloss Township, Tioga County, Pennsylvania This project is the replacement two corrugated metal pipe culverts and a preservation of a corrugated metal pipe culvert along Landrus Road. Bridge A replacement will consist of a corrugated galvanized steel pipe arch culvert with flared concrete end sections. Bridge B replacement will consist of an integral abutment bridge with a composite prestressed concrete spread box beam superstructure. Bridge C preservation will consist of paving the invert/flowline of the pipe to eliminate further pipe invert deterioration and loss of bearing material beneath the pipe invert and placement of riprap for scour protection. SDB Participation Goal: 21% VBE Participation Goal: 3% Engineer's Estimate: $1,000,000-$ 2,000,000
09/25/2025 05:00 PM UTC
1 - 10 of 210 Solicitations
← Previous 1 3 4 5 6 7 8 9 20 21