General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-103194.1
Water Treatment Facility, Forest District Office Moshannon State Forest Pine Township, Clearfield County, Pennsylvania This project includes the construction of a water treatment system and connection to a new groundwater source, to provide drinking water to the Moshannon State Forest District Office. This will require the installation of a submersible well pump, drop piping, pitless adaptor, sanitary seal well cap, and necessary appurtenances required to convey groundwater from the existing well source. Raw water distribution piping will be installed to connect the groundwater source to the District Office. A water treatment system will be constructed to provide disinfection, oxidation, greensand plus filtration, water storage, and pressurization. A backwash disposal system will be constructed to properly remove all regenerated water from the treatment process. Selective demolition and abandonment of existing water system piping is anticipated. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
05/15/2025 05:00 PM UTC
FDC-300-10790.1
Structure Replacement, Bridge A. No. 317-0802 Swimming Pool Road Over UNT to Little Buffalo Creek, Little Buffalo State Park, Centre Township, Perry County Structure Replacement, Bridge B. No. 6306-0001 Quaker Race Area Road Over UNT to Beaver Creek, Gifford Pinchot State Park, Warrington Township, York County This project will replace the existing corrugated metal pipe arch conveying the UNT to Little Buffalo Creek under Swimming Pool Road with a precast box culvert in Little Buffalo State Park and the existing corrugated metal pipe conveying the UNT to Beaver Creek under Quaker Race Area Road with an elliptical pipe in Gifford Pinchot State Park. Other work includes rock lining, channel realignments, precast concrete sections, headwalls, endwalls and aprons, architectural surface, asphalt approach roadway, DSA approach roadway, and guide rails. SDB Participation Goal 20% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1 Million
05/15/2025 05:00 PM UTC
FDC-202-07009.1
Rehab Suspension Bridge, Bridge No. 6202-0202 Swinging Bridge Over Toms Run Cook Forest State Park Farmington Township, Clarion County Rehabbing the existing foot bridge to extend service life. Repair will include removal, repair, replacement of the existing floor system, hand railing, hanger rods, tower, cleaning and painting the structural steel. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
05/15/2025 05:00 PM UTC
FDC-429-102287.1
General Construction Day Use CXT - Hillside Lackawanna State Park Dalton Township, Lackawanna County, Pennsylvania Work included under this contract consists of all site erosion sediment and control, miscellaneous demolition and site clearing, excavation, trenching, backfill, construction of ADA parking lot, ADA pedestrian paths, Installation of pre-fabricated comfort station, water and sanitary sewer service, seeding, mulching, landscaping, electrical service and connections and all general construction and electrical construction work as indicated on the Contract Drawings. SDB Participation Goal 21% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1 Million
05/15/2025 05:00 PM UTC
FDC-429-102287.4
Electrical Construction Day Use CXT - Hillside Lackawanna State Park Dalton Township, Lackawanna County, Pennsylvania Work included under this contract consists of all site erosion sediment and control, miscellaneous demolition and site clearing, excavation, trenching, backfill, construction of ADA parking lot, ADA pedestrian paths, Installation of pre-fabricated comfort station, water and sanitary sewer service, seeding, mulching, landscaping, electrical service and connections and all general construction and electrical construction work as indicated on the Contract Drawings. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $75,000
05/15/2025 05:00 PM UTC
FDC-211-103264.2R
Mechanical Construction Visitor Center HVAC Rehab Ohiopyle State Park Ohiopyle Borough, Fayette County, Pennsylvania This project will consist of selective demolition of the Biological Treatment room interior finishes and HVAC systems. Removal and reinstallation of certain items will also be necessary. New work will include insulation, air barriers and sealing off penetrations. Interior paint and repairs to existing aluminum-faced storefronts and glazed aluminum curtain walls. Installation of a new dehumidification unit with associated ductwork, new wall mounted instantaneous water heater to the heat pump loop, new supply and return water connections, valves, etc., and a new exhaust fan with pressurization control system. DGS Small Business Certification Required Engineer's Estimate: $100,000-$350,000
05/29/2025 05:00 PM UTC
FDC-001-103112.1
ATV Trail System Rehab Forest District 01, Michaux State Forest Menallen Township, Adams County, Pennsylvania To rehab and construct nearly 3,300 LF of ATV trail to connect Grave Ridge Trail to the nearby Log Sled Trail. This project also includes a prefabricated pedestrian bridge crossing Mountain Creek. The total land disturbance will be over one (1) acre, therefore a NPDES permit will be required. Construction of a new crossing will require a Joint Permit Application. SDB Participation Goal: 15% VBE Participation Goal: 3% Engineer's Estimate: Over $1 Million
05/29/2025 05:00 PM UTC
FDC-211-103264.1R
General Construction Visitor Center HVAC Rehab Ohiopyle State Park Ohiopyle Borough, Fayette County, Pennsylvania This project will consist of selective demolition of the Biological Treatment room interior finishes and HVAC systems. Removal and reinstallation of certain items will also be necessary. New work will include insulation, air barriers and sealing off penetrations. Interior paint and repairs to existing aluminum-faced storefronts and glazed aluminum curtain walls. Installation of a new dehumidification unit with associated ductwork, new wall mounted instantaneous water heater to the heat pump loop, new supply and return water connections, valves, etc., and a new exhaust fan with pressurization control system. DGS Small Business Certification Required Engineer's Estimate: $100,000-$350,000
05/29/2025 05:00 PM UTC
FDC-133-103878.4
Upgrade Electric Service to Well Houses Bald Eagle State Park Howard and Liberty Township, Centre County, Pennsylvania The work under this project consists of upgrading the electric service to Well Houses #1 & #2 on the grounds of Bald Eagle State Park (149 Main Park Road, Howard, PA). DGS Small Business Certification Required Engineer's Estimate: $50,000-$100,000
05/29/2025 05:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
FDC-320-100203.3
Plumbing Construction King's Gap Environmental Education Center Dickinson Township, Cumberland County, Pennsylvania Work included under this contract consists of the plumbing construction of the water tank replacement. DGS Small Business Certification Required Engineer's Estimate: Under $25,000.00
07/13/2023 06:00 PM UTC
FDC-320-100203.4
Electrical Construction King's Gap Environmental Education Center Dickinson Township, Cumberland County, Pennsylvania Work included under this contract consists of the electrical construction of the water tank replacement. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
07/13/2023 06:00 PM UTC
FDC-411-102176.4R
Project Name: Electrical Construction, McConnell Hall Rehabilitation State Park/Forest: Nolde Forest Environmental Education Center Township/County: Camru Township, Berks County, Pennsylvania Project Description Work included under this contract consists of demolition of some existing interior light fixtures, replacing exterior light fixtures and adding new some new, replacing some electrical wiring and running new circuits, replacing lighting controls, replacing emergency lighting, replacing hand dryers, updating the existing electrical panel, replacing some light bulbs, and replacing a couple of receptacles. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $50,000
07/06/2023 06:00 PM UTC
FDC-305-10755.1
Dam Control Tower, Masonry Veneer Repair Cowans Gap State Park Todd Township, Fulton County Work included under this contract consists of the restoration of stone masonry veneer where sections of stone masonry walls exhibit loose stones, or missing stones and preparing and repoints joints in the stone masonry veneer as shown on the contract drawings. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
06/22/2023 06:00 PM UTC
FDC-210-103441.1
Force Main Replacement LS7 Moraine State Park Muddy Creek Township, Butler County Work included under this contract consists of the complete construction of replacing an existing sewer force main connection between the lift station 7 and manhole #433 with approximately 2,100 L.F. of 8” DR-11 HDPE pipe PE4710. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
06/22/2023 06:00 PM UTC
FDC-414-102033.1R
Roadway Rehabilitations Promised Land State Park The work of this project will take place along Pickerel Point Road, North Shore Road and Ridgefield Point Road in Promised Land State Park located in Blooming Grove, Greene and Palmyra Townships, Pike County. Work included under this contract includes the full depth reclamation and repaving of approximately 1.1 miles of Pickerel Point Road, and the replacement of seven (7) existing culvert pipes and restoration of the ditch lines along the side of the road for storm water drainage improvements. Work also includes asphalt base repairs and installation of an asphalt wearing course along approximately 3 miles of North Shore Road and 0.4 miles of Ridgefield Road, and the rehabilitation of the Ridgefield Road over Big Inlet bridge. SDB Participation Goal: 0% VBE Participation Goal: 0% Engineer's Estimate: Over $1 Million
06/08/2023 06:00 PM UTC
FDC-115-103057.1R
General Construction, Install Electric Dam Gate Operators and Generator Lyman Run State Park West Branch Township, Potter County, Pennsylvajia 1. Work included under this contract consists of the complete construction and installation work for the following: a. Structural underwater inspection of water structures consisting of drawdown structure, upstream conduit, control tower, labyrinth spillway weir, and stilling basin. Work will also consist of design and installing a bulkhead in underwater conditions at the inlet structure after inspection of the inlet is completed. b. Remove and replace both upstream and downstream sluice gate stems in the control tower that are a part of the sluice gate system. c. Install two new electric operators and actuators sufficient enough to open the existing 96” sluice gates upstream and downstream in the control tower. d. Provide services of a Rodney Hunt and Rotork representative or approved equal to adjust the wedges of the sluice gate and set up the settings of the operators to run properly using the generator in FDC- 115-103057.4 contract. e. Have the contracted divers remove bulkhead after all work is completed and approved. SDB Participation Goal: 13% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $1 Million
06/01/2023 06:00 PM UTC
FDC-115-103057.4R
Electrical Construction Lyman Run State Park West Branch Township, Potter County, Pennsylvania The work under this project consists of providing a mobile generator system, generator interface kiosk with quick-connect disconnect switch, manual transfer switch, and actuator disconnect switches at Control Tower on the Dam at Lyman Run State Park. Work shall include all wiring and conduit, and utilization and demonstration of the mobile generator system in operating the gate actuators at the end of construction for start-up, training, and commissioning purposes. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
06/01/2023 06:00 PM UTC
FDC-303-103059.1
Stream and Pedestrian Bridge Restoration Caledonia State Park Green and Franklin Townships, Franklin and Adams Counties, Pennsylvania Work included under this contract consists of restoring four (4) pedestrian bridges and restoration activities of two (2) streams. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
06/01/2023 06:00 PM UTC
FDC-117-103234.1
Dam Repairs Parker Dam State Park Huston Township, Clearfield County, Pennsylvania Work included under this contract consists of the complete construction and installation work for the following: a. Dewatering: 1. All dewatering activities required, partial drawdown of fivefoot (5’) of the normal pool elevation of the reservoir. b. E&S: 1. Implementation, maintenance, and removal of erosion and sedimentation control measures. c. Pressure pointing (7360 square feet): 1. Pressure Pointing of surfaces of the existing masonry structures listed below. a. Primary spillway east wall, floor, and west abutment wall b. Primary spillway vertical wall into stilling basin c. Upstream end of the west wing wall of the auxiliary spillway. d. Upstream east wing wall of the primary spillway. e. Control tower from normal pool elevation down 2 ft in elevation d. Fiberglass Staff Gauge: 1. Remove existing staff gauge and install a fiberglass staff Contract No. FDC-117-103234.1 SUMMARY OF WORK 01010-2 gauge to the main spillway wall upstream of the spillway. e. Stone Masonry Work (125 Square Feet): 1. Displaced hand laid stone on the upstream side of the dam must be reset to original location. a. Located on auxiliary spillway wing wall on the upstream side of the dam. b. Located between the control tower and bridge abutment. f. Concrete Spall Repair (770 cubic inches): 1. Repair cracked and spalled concrete along the walls located inside the control tower. The work will consist of the following listed below. a. Spall repairs located above the 5 ft drawdown mark. b. Spall repairs are located underwater that will need to be completed by divers. g. Excavating, Backfill, and Compacting (109 Cubic Feet): 1. Repair the ground under the stone masonry work located between the control tower and bridge SDB Participation Goal: 5% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $1 Million
06/01/2023 06:00 PM UTC
151 - 160 of 178 Solicitations
1 2 10 11 12 13 14 16 18