Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-216-100751.1
Maintenance Buildings Roof Replacements Yellow Creek State Park Brush Valley Township Indiana County, Pennsylvania The work includes removal and replacement of asphalt shingle roofs on two existing maintenance buildings, each with an approximate roof area of 4,325 SF (8,650 SF total). The existing gutters (585 LF) and downspouts (185 LF) along with the fascia boards (585 LF) will also be replaced. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
08/20/2026 05:00 PM UTC
FDC-461-104347.1
Phase II Wet Well Upgrades Washington Crossing Historic Park Upper Makefield Township Upgrades to be performed include installation of a trash basket to replace the in line strainer that does not work. Work shall include fabrication of a trash basket, rail system, and emptying tray. Work will also include some minor concrete work, electrical work and installation of completed components. DGS Small Business Certification Required Engineer's Estimate: $200,000 - $250,000
08/20/2026 05:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
FDC-133-103473.4
Sewage Treatment Plant Rehabilitation Bald Eagle State Park Liberty Township, Centre County, Pennsylvania Work covers the upgrade of the existing wastewater treatment facility owned and operated by Bald Eagle State Park, located in Liberty Township, Centre County. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
07/11/2024 06:00 PM UTC
FDC-007-101656.1
Pave District Office Parking Lots, Maintenance HQ's Access Road, Pole Building Access Road Forest District 7, Bald Eagle State Forest Hartley Township, Centre County, Pennsylvania DGS Small Business Certification Required Engineer's Estimate: $250,000 - $600,000
07/11/2024 06:00 PM UTC
FDC-211-07293.1
Structure Replacement, Great Allegheny Passage (GAP) Trail Over UNT to Youghiogheny River Ohiopyle State Park Stewart Township, Fayette County, Pennsylvania Structure Replacement (Bridge) DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
07/11/2024 06:00 PM UTC
FDC-422-7486.1
Replace Boat Rental Docks (CULP) Nockamixon State Park Haycock Township, Bucks County, Pennsylvania. Work included under this project consists of the design of a new dock system using the existing ramps and professional engineer certification SDB Participation Goal: 12% VBE Participation Goal: 3% Engineer's Estimate: $600,000- $1 Million
06/27/2024 06:00 PM UTC
FDC-011-103307.1R
New Structure, Bridge 11-0009 Red Pine Plantation Trail Forest District 11, Pinchot State Forest Thornburst Township Lackawanna County, Pennsylvania Project Description: New Structure Project – Bridge No. 35-7935-5111-0009 a. Construction of the Red Pine Plantation Trail alignment from Station 11+00.00 to Station 15+50.00. b. Construction of a new prefabricated modular/panel steel truss on reinforced concrete abutments, associated riprap placement, channel grading, and guide rail installation for the Red Pine Plantation Trail crossing over Sand Spring Run SDB Participation Goal: 5% VBE Participation Goal: 3% Engineer's Estimate: $500,000-$1 million
06/27/2024 06:00 PM UTC
FDC-422-102768.1
PM Septic Tank Repair/Replacement Nockamixon State Park Haycock Township, Bucks County Project Description: Work includes the complete construction and start-up of a new residential sandmound style septic sewage disposal system at the Nockamixon State Park Deerwood Lane Residence DGS Small Business Certification Required Engineer's Estimate:30,000-60,000
06/27/2024 06:00 PM UTC
FDC-407-103143.1
Stream Assessment/Streambank Stabilization Jacobsburg Environmental Education Center Bushkill Township, Northampton County, Pennsylvania Work includes the complete construction of streambank stabilization and stream restoration measures along a 1,600 linear feet section of Bushkill Creek, located at the Jacobsburg Environmental Education Center. The Contractor will construct all streambank stabilization and stream restoration features in accordance with the plans, cross sections and details. SDB Participation Goal 8% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1M
06/13/2024 06:00 PM UTC
FDC-012-103509.1
Tomb Flats - ADA Fishing Access Forest District 12, Tiadaghton State Forest Brown Township, Lycoming County Pennsylvania The work under this project consists of constructing a new ADA fishing platform, ADA parking, concrete walkways, a concrete boat ramp extension, and other miscellaneous site improvements at Tomb Flats Campground in Tiadaghton State Forest. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
06/06/2024 06:00 PM UTC
FDC-128-10325.1
Structure Repairs, Bridge No. 6128-1600 Kinzua Gorge Overlook Over Kinzua Gorge Kinzua Bridge State Park Hamlin Township, McKean County, Pennsylvania Perform a restoration of the existing Kinzua Gorge Overlook over the Kinzua Gorge (6128-1600). The work will include removal and replacement of the timber deck, railings and glass floor system, structural steel repairs to the girders and towers, replacement of girder bearings at the abutment, replacement of girder bearings at select towers, cleaning and painting of the structural steel, and other miscellaneous work. SDB Participation Goal 5% VBE Participation Goal 3% Engineer's Estimate: Over $1M
05/30/2024 06:00 PM UTC
FDC-210-04405.4R
Replace Bike Rental Concession Building and Public Restrooms Moraine State Park Worth Township, Butler County, Pennsylvania Work included under this Contract consists of installation of a new electrical service entrance for a new concession building at Moraine State Park. Major items of work include demolition of existing electrical facilities, as required, and coordination and installation of new electrical service entrance for the building. This is a design build contract that requires design documents and permitting prepared by the electrical contractor and, coordination with the General Contractor to prepare an overall set of construction plans. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
05/30/2024 06:00 PM UTC
161 - 170 of 254 Solicitations
1 2 13 14 15 17 19 20 21 25 26