General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-014-104713.1
Plug and Properly Abandon Orphaned Oil & Gas Wells South Tank Hill Tract, DGS-196-13, Phase 4 Cornplanter State Forest Harmony Township, Forest County, Pennsylvania Work included under this Contract consists of the construction required to clean out and plug eighteen (18) orphaned oil & gas wells. Major items of work include construction of access routes to the wells, using approved well plugging equipment and materials to clean out and seal the wells, along with restoring the areas after construction. Proper erosion and sediment controls must be implemented during and after construction until the sites are stabilized. SDB Participation Goal 0% VBE Participation Goal 0% Engineer's Estimate: $800,000 - 850,000
10/01/2026 05:00 PM UTC
FDC-010-103030.1
Structure Replacement, Bridge No. 10-0084, Hensel Fork Road Over Hensel Fork Forest District 10, Sproul State Forest Leidy Township, Clinton County, Pennsylvania Replacing an existing 36-inch Corrugated Metal Pipe with a Precast Concrete Box Culvert (6ftx4ft). The proposed structure will have an 18 ft roadway width. Also to repair an approximately 55 ft section of roadway slide with R-7 riprap. DGS Small Business Certification Required Engineer's Estimate: $350,000 - $400,000
10/01/2026 05:00 PM UTC
FDC-425-7436.1
Mill Dairy Trail Bridge Abutment Underpinning Tyler State Park Northampton Township, Bucks County, Pennsylvania The project consists of underpinning of the existing scoured stone masonry foundation with reinforced concrete apron on the face of the North Abutment including replacement of several missing stones along the bottom of the abutment wall. The project is located in in Tyler State Park near the intersection of Stable Mill Trail and Mil Dairy Trail in Northampton Township, Bucks County, Pennsylvania. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
10/01/2026 05:00 PM UTC
FDC-414-10716.1
Reroof Park Office Promised Land State Park Greentown Township, Pike County, Pennsylvania Work included under this contract consists of demolition the complete roofing system and installation of new roofing system, including but not limited to remove and reinstall the heat trace cable, remove and replace damaged plywood sheathing, remove and replace skylights, replace starter strip, ridge cap, ridge vent, underlayment, ice & water shield, drip edge, flashing, pipe boots, repair aluminum soffit, remove and reinstall wood siding and wood fascia. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
10/01/2026 05:00 PM UTC
FDC-009-10757.1
Structure Replacements Structure A: Bridge No. 09-0071 Merrill Road Over Unt To Gifford Run Structure B: Bridge No. 09-0070 Merrill Road Over Mcnerney Run Forestry District 09, Moshannon State Forest Pennsylvania Game Commission, Northcentral Region, State Game Land 34 Girard Township, Clearfield County, Pennsylvania Work consists of replacement of an existing corrugated metal pipe arch conveying the UNT to Gifford Run under Merrill Road with a precast box culvert. Other work includes precast concrete end sections, aprons and headwalls, rock lining architectural surface treatment, driving surface aggregate (DSA) approach roadway and guide rail. This project will also replace an existing corrugated metal pipe arch carrying McNearny Run under Merrill Road with a precast rigid frame structure. Other work includes rock lining, channel lining, architectural surface treatment, and DSA approach roadway and guide rail. SDB Participation Goal: 17% VBE Participation Goal: 3% Engineer's Estimate: $600,000 - $1 Million
10/15/2026 05:00 PM UTC
FDC-131-101491.4
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $400,000
10/15/2026 05:00 PM UTC
FDC-131-101491.2
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate:
10/15/2026 05:00 PM UTC
FDC-131-101491.1
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $450,000
10/15/2026 05:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
FDC-010-100893.4
District Office Generator Forest District 10, Sproul State Forest Noyes Township, Clinton County Project Description The work under this project consists of providing and installing a propane gas packaged engine generator system at the District Office on the grounds of Sproul State Forest DGS Small Business Certification Required Engineer's Estimate:100,000-200,000
05/16/2024 06:00 PM UTC
FDC-306-11035.1
Bituminous Roadway Repairs Gifford Pinchot State Park Warrington Township, York County, Pennsylvania Project Description: Work includes the placement of 9.5mm Superpave Wearing Course, 19mm Superpave Binder Course, 25mm Superpave Base Course, and 2A Aggregate. Additional work includes excavation, culvert installation, inlet installation, tack coating, shoulder back up, pavement demolition, and pavement markings. SDB Participation Goal: 0% VBE Participation Goal: 0% Engineer's Estimate: Over $ 1 Million
04/25/2024 06:00 PM UTC
FDC-143-101480.1
Cherry Springs Astronomy Programming Area Rehabilitation Cherry Springs State Park West Branch Township Potter County, Pennsylvania Project Description: The work under this project consists of the development and construction of the Pavilion, Contact Building, Water Treatment Building, new access roads, parking areas, sidewalks, landscaping and associated utilities. SDB Participation Goal: 8% VBE Participation Goal: 3% Engineer's Estimate: Over $1 Million
04/25/2024 06:00 PM UTC
FDC-143-101480.4
Cherry Springs Astronomy Programming Area Rehabilitation Cherry Springs State Park West Branch Township Potter County, Pennsylvania Project Description: The work under this project consists of the development and construction of the Pavilion, Contact Building, Water Treatment Building, new access roads, parking areas, sidewalks, landscaping and associated utilities. SDB Participation Goal: 12% VBE Participation Goal: 3% Engineer's Estimate: $600,000 - $800,000
04/25/2024 06:00 PM UTC
FDC-428-101212.1
Rehab Campground Road and Drainage for Campsites 89-213 Locust Lake State Park, Ryan Township, Schuylkill County, Pennsylvania . Project Description Work consists of repaving specific sections of the campground Locust Lake Road and associated loops to access campsites 89 - 213. Work includes, but is not limited to, reclamation full depth repair and repaving of the sections of the existing paved roadway, pedestrian walking surfaces, campsite pads, and improving existing drainage conditions but adding inlets and pipes. DGS Small Business Certification Required Engineer's Estimate: $400,000-600,000
04/18/2024 06:00 PM UTC
FDC-309-100774.1
Repave Warriors Path Road Warriors Path State Park Liberty Township Bedford County, Pennsylvania Project Description 1. Work included under this contract consists of: The placement of approximately 1,800 tons of 9.5mm Superpave HMA Wearing Course, 3,600 tons of 25mm Superpave HMA Base Course, 300 tons of 2A Stone and 700 tons of 2RC Aggregate, 41 Cast-in-Place/Precast Headwalls, 2,100 S.Y. of Road Milling, 1,025 L.F. of 15” and 18” HDPE Pipe Installation, 1,300 Tons of Driving Surface Aggregate (DSA) Placement, road widening, ditching, line striping, and tack coating. SDB Participation Goal : 0% VBE Participation Goal : 0% Engineer's Estimate: $600,000 - $1 Million
04/18/2024 06:00 PM UTC
FDC-210-04405.1
Replace Bike Rental Concession Building & Public Restrooms Moraine State Park Worth Township, Butler County, Pennsylvania Work included under this Contract consists of construction for a new concession building at Moraine State Park. Major items of work includes construction of a 48’-8’ x 28-0”’ reinforced concrete masonry block building that will include a public use area, service room, two bathrooms and a mechanical room; new utility services (electrical, tele/comm., plumbing, HVAC, storm, etc.) to support the new facility; site improvements including new concrete sidewalks & curbs, site grading for and around the building pad and to improve site drainage, bike repair station, paint striping, pavement repairs, removal of existing miscellaneous concrete (sidewalks, curbs, building foundation, retaining wall) and erosion and sediment controls. SDB Participation Goal 13% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1M
04/18/2024 06:00 PM UTC
FDC-210-04405.4
Replace Bike Rental Concession Building & Public Restrooms Moraine State Park Worth Township, Butler County, Pennsylvania Work included under this Contract consists of construction for a new concession building at Moraine State Park. Major items of work includes construction of a 48’-8’ x 28-0”’ reinforced concrete masonry block building that will include a public use area, service room, two bathrooms and a mechanical room; new utility services (electrical, tele/comm., plumbing, HVAC, storm, etc.) to support the new facility; site improvements including new concrete sidewalks & curbs, site grading for and around the building pad and to improve site drainage, bike repair station, paint striping, pavement repairs, removal of existing miscellaneous concrete (sidewalks, curbs, building foundation, retaining wall) and erosion and sediment controls. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
04/18/2024 06:00 PM UTC
FDC-434-6137.1
Pavement Rehabilitation Of Multiple Roadways Evansburg State Park Lower Providence & Skippack Townships Montgomery County, Pennsylvania Project Description : The work for this project will consist of repair, reclamation and repaving of the sections of the existing paved roadway and other incidental construction of May Hall Road; Old Cedar Lane; Skippack Creek Road & Mill Road located within Evansburg State Park, Lower Providence and Skippack Townships, Montgomery County, Pennsylvania. SDB Participation Goal: 0% VBE Participation Goal: 0% Engineer's Estimate: $ 600,000 - $900,000
04/18/2024 06:00 PM UTC
FDC-406-00565.1
Pavement Rehabilitation of Multiple Roadways French Creek State Pak Union Township, Berks County, Pennsylvania The work for this project will consist of repair, reclamation and repaving of the sections of the existing paved roadway and other incidental construction of Park Road (North and South Section), Cabin Road, Scott Run Road, Scott Run Road Loop, Loop Road, and Campground Road (North and South section) as specified in the plan located within French Creek State Park, Union Township in Berks County. The work included under this contract consist of repair and repaving of the sections of the existing paved roadway tie-in with other existing roads, black top overlay of roads, and mill and overlay, construction of 2-ft wide 2A shoulder on both sides of the roadway, removal, and replacement of six (6) existing culvert pipes, stabilizing of two (2) outlet protection with riprap, the cleaning of the thirty-six (36) of the existing culverts, and stabilizing of a existing rock lined parallel ditch as indicated on the Contract Drawings. The work also includes maintenance and protection of traffic, erosion and sediment control measures and all miscellaneous incidental work. SDB Participation Goal 16% VBE Participation Goal 3% Engineer's Estimate: Over $1Million
04/18/2024 06:00 PM UTC
181 - 190 of 262 Solicitations
1 2 … 15 16 17 19 21 22 23 … 26 27