General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-014-104713.1
Plug and Properly Abandon Orphaned Oil & Gas Wells South Tank Hill Tract, DGS-196-13, Phase 4 Cornplanter State Forest Harmony Township, Forest County, Pennsylvania Work included under this Contract consists of the construction required to clean out and plug eighteen (18) orphaned oil & gas wells. Major items of work include construction of access routes to the wells, using approved well plugging equipment and materials to clean out and seal the wells, along with restoring the areas after construction. Proper erosion and sediment controls must be implemented during and after construction until the sites are stabilized. SDB Participation Goal 0% VBE Participation Goal 0% Engineer's Estimate: $800,000 - 850,000
10/01/2026 05:00 PM UTC
FDC-010-103030.1
Structure Replacement, Bridge No. 10-0084, Hensel Fork Road Over Hensel Fork Forest District 10, Sproul State Forest Leidy Township, Clinton County, Pennsylvania Replacing an existing 36-inch Corrugated Metal Pipe with a Precast Concrete Box Culvert (6ftx4ft). The proposed structure will have an 18 ft roadway width. Also to repair an approximately 55 ft section of roadway slide with R-7 riprap. DGS Small Business Certification Required Engineer's Estimate: $350,000 - $400,000
10/01/2026 05:00 PM UTC
FDC-425-7436.1
Mill Dairy Trail Bridge Abutment Underpinning Tyler State Park Northampton Township, Bucks County, Pennsylvania The project consists of underpinning of the existing scoured stone masonry foundation with reinforced concrete apron on the face of the North Abutment including replacement of several missing stones along the bottom of the abutment wall. The project is located in in Tyler State Park near the intersection of Stable Mill Trail and Mil Dairy Trail in Northampton Township, Bucks County, Pennsylvania. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
10/01/2026 05:00 PM UTC
FDC-414-10716.1
Reroof Park Office Promised Land State Park Greentown Township, Pike County, Pennsylvania Work included under this contract consists of demolition the complete roofing system and installation of new roofing system, including but not limited to remove and reinstall the heat trace cable, remove and replace damaged plywood sheathing, remove and replace skylights, replace starter strip, ridge cap, ridge vent, underlayment, ice & water shield, drip edge, flashing, pipe boots, repair aluminum soffit, remove and reinstall wood siding and wood fascia. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
10/01/2026 05:00 PM UTC
FDC-009-10757.1
Structure Replacements Structure A: Bridge No. 09-0071 Merrill Road Over Unt To Gifford Run Structure B: Bridge No. 09-0070 Merrill Road Over Mcnerney Run Forestry District 09, Moshannon State Forest Pennsylvania Game Commission, Northcentral Region, State Game Land 34 Girard Township, Clearfield County, Pennsylvania Work consists of replacement of an existing corrugated metal pipe arch conveying the UNT to Gifford Run under Merrill Road with a precast box culvert. Other work includes precast concrete end sections, aprons and headwalls, rock lining architectural surface treatment, driving surface aggregate (DSA) approach roadway and guide rail. This project will also replace an existing corrugated metal pipe arch carrying McNearny Run under Merrill Road with a precast rigid frame structure. Other work includes rock lining, channel lining, architectural surface treatment, and DSA approach roadway and guide rail. SDB Participation Goal: 17% VBE Participation Goal: 3% Engineer's Estimate: $600,000 - $1 Million
10/15/2026 05:00 PM UTC
FDC-131-101491.4
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $400,000
10/15/2026 05:00 PM UTC
FDC-131-101491.2
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate:
10/15/2026 05:00 PM UTC
FDC-131-101491.1
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $450,000
10/15/2026 05:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
FDC-115-103057.1R
General Construction, Install Electric Dam Gate Operators and Generator Lyman Run State Park West Branch Township, Potter County, Pennsylvajia 1. Work included under this contract consists of the complete construction and installation work for the following: a. Structural underwater inspection of water structures consisting of drawdown structure, upstream conduit, control tower, labyrinth spillway weir, and stilling basin. Work will also consist of design and installing a bulkhead in underwater conditions at the inlet structure after inspection of the inlet is completed. b. Remove and replace both upstream and downstream sluice gate stems in the control tower that are a part of the sluice gate system. c. Install two new electric operators and actuators sufficient enough to open the existing 96” sluice gates upstream and downstream in the control tower. d. Provide services of a Rodney Hunt and Rotork representative or approved equal to adjust the wedges of the sluice gate and set up the settings of the operators to run properly using the generator in FDC- 115-103057.4 contract. e. Have the contracted divers remove bulkhead after all work is completed and approved. SDB Participation Goal: 13% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $1 Million
06/01/2023 06:00 PM UTC
FDC-115-103057.4R
Electrical Construction Lyman Run State Park West Branch Township, Potter County, Pennsylvania The work under this project consists of providing a mobile generator system, generator interface kiosk with quick-connect disconnect switch, manual transfer switch, and actuator disconnect switches at Control Tower on the Dam at Lyman Run State Park. Work shall include all wiring and conduit, and utilization and demonstration of the mobile generator system in operating the gate actuators at the end of construction for start-up, training, and commissioning purposes. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
06/01/2023 06:00 PM UTC
FDC-303-103059.1
Stream and Pedestrian Bridge Restoration Caledonia State Park Green and Franklin Townships, Franklin and Adams Counties, Pennsylvania Work included under this contract consists of restoring four (4) pedestrian bridges and restoration activities of two (2) streams. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
06/01/2023 06:00 PM UTC
FDC-117-103234.1
Dam Repairs Parker Dam State Park Huston Township, Clearfield County, Pennsylvania Work included under this contract consists of the complete construction and installation work for the following: a. Dewatering: 1. All dewatering activities required, partial drawdown of fivefoot (5’) of the normal pool elevation of the reservoir. b. E&S: 1. Implementation, maintenance, and removal of erosion and sedimentation control measures. c. Pressure pointing (7360 square feet): 1. Pressure Pointing of surfaces of the existing masonry structures listed below. a. Primary spillway east wall, floor, and west abutment wall b. Primary spillway vertical wall into stilling basin c. Upstream end of the west wing wall of the auxiliary spillway. d. Upstream east wing wall of the primary spillway. e. Control tower from normal pool elevation down 2 ft in elevation d. Fiberglass Staff Gauge: 1. Remove existing staff gauge and install a fiberglass staff Contract No. FDC-117-103234.1 SUMMARY OF WORK 01010-2 gauge to the main spillway wall upstream of the spillway. e. Stone Masonry Work (125 Square Feet): 1. Displaced hand laid stone on the upstream side of the dam must be reset to original location. a. Located on auxiliary spillway wing wall on the upstream side of the dam. b. Located between the control tower and bridge abutment. f. Concrete Spall Repair (770 cubic inches): 1. Repair cracked and spalled concrete along the walls located inside the control tower. The work will consist of the following listed below. a. Spall repairs located above the 5 ft drawdown mark. b. Spall repairs are located underwater that will need to be completed by divers. g. Excavating, Backfill, and Compacting (109 Cubic Feet): 1. Repair the ground under the stone masonry work located between the control tower and bridge SDB Participation Goal: 5% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $1 Million
06/01/2023 06:00 PM UTC
FDC-428-6503.1
General Construction, Shower House Replacement, Phase 1 and Full Service Campsites Locust Lake State Park Ryan Township, Schuylkill County, Pennsylvania This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Clearing and grubbing of trees, shrubs, and other vegetation. b. Excavation, trenching, backfill, and compaction work required for new general, plumbing, and electrical construction work. c. Rough and finish grading. d. Construction of roadway and parking areas. e. Construction of stone and asphalt spurs, aggregate campsite living areas and tent pads. f. Signage, striping and relocation of wheel stops. g. Subsurface stone basins and rain gardens. h. Storm Sewer piping, domed risers, inlets and outlet structures. i. Domestic Water and Sanitary sewer piping related to exterior improvements. j. Wood fence k. Rock construction fencing, silt socks, and inlet protection. l. Construction of concrete and asphalt sidewalks. m. Seeding, mulching, and landscaping. n. Structure Demolition of Existing Showerhouses 1 and 3. o. Construction of new Showerhouses 1 and 3 including concrete footings and piers; concrete masonry unit (cmu) foundations; ground face cmu walls with insulation fill; reinforced cmu shear walls grouted solid; interior sloping reinforced concrete slab on grade floors; exterior reinforced concrete slab on grade with perimeter turndowns; wood shear wall extension panels; structural steel columns; common wood trusses; and miscellaneous rough carpentry and sheathing. p. Showerhouses 1 and 3 Building Envelope: Fiber cement siding and trim; building insulation and vapor barrier; thin stone veneer with cut stone base and water table; asphalt shingle roof; steel doors and frames; and aluminum windows. q. Showerhouses 1 and 3 Building Finishes, Specialties and Furnishings: Gypsum wall board; PVC panel ceilings, resinous floors; ceramic tile shower walls and floors; interior and exterior painting; solid surface countertops and integral sinks; exterior stainless-steel counters with integrated sinks; toilet and shower partitions; and toilet accessories. r. Department instruction and training. SDB Participation Goal 9% VBE Participation Goal 3% Engineer's Estimate: Over $1 Million
05/25/2023 06:00 PM UTC
FDC-428-6503.2
Mechanical Construction, Showerhouse Replacement Phase 1 & Full Service Campsites Locust Lake State Park Ryan Township, Schuylkill County, Pennsylvania This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Space heaters h. Exhaust grilles. i. Exhaust fans and related ductwork and insulation. j. HVAC controls and control systems. k. Miscellaneous earthwork related to the installation of the mechanical contract work. l. Testing, adjusting, and balancing. m. Department instruction and training. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $100,000
05/25/2023 06:00 PM UTC
FDC-428-6503.3
Plumbing Construction, Showerhouse Replacement Phase 1 & Full Service Campsites Locust Lake State Park This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Domestic water system piping. b. Water closets, urinals, lavatories, shower heads/controls, hose bibs, and other plumbing fixtures. d. Water heaters. e. Drinking fountain. f. Floor drains and trench drains. g. Sanitary sewer and vent piping. h. Propane gas piping from building to tank. Coordinate with .1 General Construction Contract for trenching and backfill. i. Connection to existing/relocated propane gas tanks. j. Department instruction and training. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
05/25/2023 06:00 PM UTC
FDC-428-6503.4
Electrical Construction, Locust Lake State Park Ryan Township, Schuylkill County, Pennsylvania This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Disconnecting electrical devices and equipment scheduled for removal by .1 Contract. b. Coordination with Utility Company for installation of new transformer. c. Conduit and placement of underground electrical. Coordinate with .1 General Construction Contract for trenching and backfill. d. Electric kiosk, panels, cabinets, and other equipment. e. Complete power and lighting systems, including conduit, wiring, boxes, panels, and fixtures and devices. f. Lighting control system. g. Campsite electric pedestals. h. Connection of power to existing equipment and new equipment installed by others. i. Emergency lighting system. j. Miscellaneous earthwork related to the installation of the electrical contract work. SDB Participation Goal 12% VBE Participation Goal 3% Engineer's Estimate: $400,000 - $1 Million
05/25/2023 06:00 PM UTC
FDC-210-07223.1
General Construction, Rehabilitation Sewage System North Shore Moraine State Park Muddy Creek and Worth Townships, Butler County, Pennsylvania Without intending to limit and/or restrict the volume of work required by these specifications or as shown on the contract drawings, work included under this contract includes the rehabilitation of five (5) sewage pumping stations. Four (4) of the existing stations, 8, 14, 15 and 16, are being converted from dry pit/wet pit type stations to submersible stations. Station 10 is being upgraded and will remain a dry pit/wet pit type station. Pump station 9 is being abandoned. The project also includes installing new force mains for several of the stations by horizontal directional drilling and trenching methods, rehabilitation and lining of manholes, using CIPP lining process for approximately 1,400 lineal feet of sanitary sewer. SDB Participation Goal: 0% VBE Participation Goal: 0% Engineer's Estimate: Over $1 Million
05/18/2023 06:00 PM UTC
FDC-210-07223.4
Electrical Construction, Rehabilitation Sewage System North Shore Moraine State Park Muddy Creek and Worth Townships Work included under this contract consists of but is not necessarily limited to, the furnishing of all labor, superintendence, materials and tools and equipment, miscellaneous items and performing all electrical work necessary to complete the rehabilitation of five (5) sewage pumping stations. Four of the existing stations 8, 14, 15, and 16 are being converted from dry pit/wet pit type stations to submersible stations. Station 10 is being upgraded and will remain a dry pit/wet pit type station. Pump station 9 is being abandoned. The project also includes installing new force mains for several of the stations by horizontal directional drilling and trenching methods, rehabilitation and lining of manholes, using CIPP lining process for approximately 1,400 lineal feet of sanitary sewer. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
05/18/2023 06:00 PM UTC
241 - 250 of 262 Solicitations
1 2 … 19 20 21 22 23 25 27