General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-103194.1
Water Treatment Facility, Forest District Office Moshannon State Forest Pine Township, Clearfield County, Pennsylvania This project includes the construction of a water treatment system and connection to a new groundwater source, to provide drinking water to the Moshannon State Forest District Office. This will require the installation of a submersible well pump, drop piping, pitless adaptor, sanitary seal well cap, and necessary appurtenances required to convey groundwater from the existing well source. Raw water distribution piping will be installed to connect the groundwater source to the District Office. A water treatment system will be constructed to provide disinfection, oxidation, greensand plus filtration, water storage, and pressurization. A backwash disposal system will be constructed to properly remove all regenerated water from the treatment process. Selective demolition and abandonment of existing water system piping is anticipated. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
05/15/2025 05:00 PM UTC
FDC-300-10790.1
Structure Replacement, Bridge A. No. 317-0802 Swimming Pool Road Over UNT to Little Buffalo Creek, Little Buffalo State Park, Centre Township, Perry County Structure Replacement, Bridge B. No. 6306-0001 Quaker Race Area Road Over UNT to Beaver Creek, Gifford Pinchot State Park, Warrington Township, York County This project will replace the existing corrugated metal pipe arch conveying the UNT to Little Buffalo Creek under Swimming Pool Road with a precast box culvert in Little Buffalo State Park and the existing corrugated metal pipe conveying the UNT to Beaver Creek under Quaker Race Area Road with an elliptical pipe in Gifford Pinchot State Park. Other work includes rock lining, channel realignments, precast concrete sections, headwalls, endwalls and aprons, architectural surface, asphalt approach roadway, DSA approach roadway, and guide rails. SDB Participation Goal 20% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1 Million
05/15/2025 05:00 PM UTC
FDC-202-07009.1
Rehab Suspension Bridge, Bridge No. 6202-0202 Swinging Bridge Over Toms Run Cook Forest State Park Farmington Township, Clarion County Rehabbing the existing foot bridge to extend service life. Repair will include removal, repair, replacement of the existing floor system, hand railing, hanger rods, tower, cleaning and painting the structural steel. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
05/15/2025 05:00 PM UTC
FDC-429-102287.1
General Construction Day Use CXT - Hillside Lackawanna State Park Dalton Township, Lackawanna County, Pennsylvania Work included under this contract consists of all site erosion sediment and control, miscellaneous demolition and site clearing, excavation, trenching, backfill, construction of ADA parking lot, ADA pedestrian paths, Installation of pre-fabricated comfort station, water and sanitary sewer service, seeding, mulching, landscaping, electrical service and connections and all general construction and electrical construction work as indicated on the Contract Drawings. SDB Participation Goal 21% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1 Million
05/15/2025 05:00 PM UTC
FDC-429-102287.4
Electrical Construction Day Use CXT - Hillside Lackawanna State Park Dalton Township, Lackawanna County, Pennsylvania Work included under this contract consists of all site erosion sediment and control, miscellaneous demolition and site clearing, excavation, trenching, backfill, construction of ADA parking lot, ADA pedestrian paths, Installation of pre-fabricated comfort station, water and sanitary sewer service, seeding, mulching, landscaping, electrical service and connections and all general construction and electrical construction work as indicated on the Contract Drawings. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $75,000
05/15/2025 05:00 PM UTC
FDC-211-103264.2R
Mechanical Construction Visitor Center HVAC Rehab Ohiopyle State Park Ohiopyle Borough, Fayette County, Pennsylvania This project will consist of selective demolition of the Biological Treatment room interior finishes and HVAC systems. Removal and reinstallation of certain items will also be necessary. New work will include insulation, air barriers and sealing off penetrations. Interior paint and repairs to existing aluminum-faced storefronts and glazed aluminum curtain walls. Installation of a new dehumidification unit with associated ductwork, new wall mounted instantaneous water heater to the heat pump loop, new supply and return water connections, valves, etc., and a new exhaust fan with pressurization control system. DGS Small Business Certification Required Engineer's Estimate: $100,000-$350,000
05/29/2025 05:00 PM UTC
FDC-001-103112.1
ATV Trail System Rehab Forest District 01, Michaux State Forest Menallen Township, Adams County, Pennsylvania To rehab and construct nearly 3,300 LF of ATV trail to connect Grave Ridge Trail to the nearby Log Sled Trail. This project also includes a prefabricated pedestrian bridge crossing Mountain Creek. The total land disturbance will be over one (1) acre, therefore a NPDES permit will be required. Construction of a new crossing will require a Joint Permit Application. SDB Participation Goal: 15% VBE Participation Goal: 3% Engineer's Estimate: Over $1 Million
05/29/2025 05:00 PM UTC
FDC-211-103264.1R
General Construction Visitor Center HVAC Rehab Ohiopyle State Park Ohiopyle Borough, Fayette County, Pennsylvania This project will consist of selective demolition of the Biological Treatment room interior finishes and HVAC systems. Removal and reinstallation of certain items will also be necessary. New work will include insulation, air barriers and sealing off penetrations. Interior paint and repairs to existing aluminum-faced storefronts and glazed aluminum curtain walls. Installation of a new dehumidification unit with associated ductwork, new wall mounted instantaneous water heater to the heat pump loop, new supply and return water connections, valves, etc., and a new exhaust fan with pressurization control system. DGS Small Business Certification Required Engineer's Estimate: $100,000-$350,000
05/29/2025 05:00 PM UTC
FDC-133-103878.4
Upgrade Electric Service to Well Houses Bald Eagle State Park Howard and Liberty Township, Centre County, Pennsylvania The work under this project consists of upgrading the electric service to Well Houses #1 & #2 on the grounds of Bald Eagle State Park (149 Main Park Road, Howard, PA). DGS Small Business Certification Required Engineer's Estimate: $50,000-$100,000
05/29/2025 05:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
FDC-114-11363.1
Little Pine Residence Well 2024 Little Pine State Park Gallagher Township, Clinton County, Pennsylvania Install and develop one (1) new well for domestic drinking water use with a sustainable household yield and connect to the existing storage, treatment, and distribution system. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
10/31/2024 06:00 PM UTC
FDC-012-10769.1
Project Name: Structure Bearing Replacements for Pine Creek Rail Trail Tioga and Tiadaghton State Forests Brown Township, Lycoming County McHenry Township, Lycoming County Delmar Township, Lycoming County Lycoming And Tioga Counties, Pennsylvania Project Description a. All site work required for project preparation, execution and completion. b. All measures to protect trail users. c. Installation of stream diversions, erosion, and sediment controls to facilitate the bearing replacement. d. Excavation required to facilitate the jacking and bearing replacement. e. Design, install and jack or lift the bridges to facilitate the bearing replacement. f. Perform substructure deteriorated concrete repairs. g. Removal of timber bearings and installation of new concrete or steel pedestals, including all surveying, bearing pads, anchor bolts, and soles plates. Replacement of timber backwalls as indicated. h. Restoration of site to original condition, including grading of trail adjacent to the bridge as required.   SDB Participation Goal: 6% VBE Participation Goal: 3% Engineer's Estimate: $ 500,000- 1 Million
10/17/2024 06:00 PM UTC
FDC-007-103149.1
Deck Replacement, Bridge No. 07-0066 Penns Creek Trail Over Penns Creek Forest District 7, Bald Eagle State Forest Penn Township, Centre County, Pennsylvania Project Description: This project consists of construction of a new deck, railings and bollards for bridge no. 07-0066, Penns Creek Trail Bridge over Penns Creek. The bridge approaches will also be modified as necessary to tie into the new deck elevation. Other work includes in stream timber debris removal. DGS Small Business Certification Required Engineer's Estimate: $100,000 -$500,000
10/10/2024 06:00 PM UTC
FDC-418-103139.1
Pavement Rehabilitation of Multiple Roadworks and Trail Marsh Creek State Park Wallace & Upper Uwchlan Townships, Chester County, Pennsylvania The work for this project will consist of repair, reclamation and repaving of the sections of the existing paved roadway and other incidental construction of Marsh Creek West Park Road, Milford Road, Chalfont Road Boat Launch, and Park Trail Road as specified in the plan located within Marsh Creek State Park, Wallace & Upper Uwchlan Townships in Chester County. SDB Participation Goal: 8% VBE Participation Goal: 3% Engineer's Estimate: $400,000-$800,000
10/03/2024 06:00 PM UTC
FDC-005-103280.1
Bridge Maintenance (6 Bridges) Forest District 5, Rothrock State Forest West, Jackson, & Todd Townships Huntingdon County, Pennsylvania This project is for the maintenance repair or rehabilitation of six existing structures throughout the Rothrock State Forest. The proposed work includes: • The maintenance repair for Bridge A on PA Furnace Road includes repairing underpinning along the near abutment using a concrete collar and rock scour protection; cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; rebuilding a stone masonry wingwall; and replacing portions of the guiderail along the approach. • The rehabilitation for Bridge B on Pine Swamp Road will replace the existing superstructure with a steel I-beam bridge superstructure, including a nail laminated timber deck, timber curbs and structure mounted guiderail. The maintenance repairs for Bridge B also includes new concrete for beam seats, backwalls, cheekwalls, wingwall caps and concrete collars along the abutments; repointing existing stone masonry joints; and installing a new structure waterproofing and foundation drainage system. • The maintenance repair for Bridge C on Stone Creek Road includes cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; recaulking joints; and replacing portions of the guiderail along the approach. • The maintenance repair for Bridge D on Seeger Road includes cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; and recaulking joints. • The maintenance repair for Bridge E on Diamond Valley Road includes cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; repointing existing stone masonry joints; and crack sealing on the asphalt roadway. • The maintenance repair for Bridge F on Trough Creek Drive includes cleaning, blasting, and repainting the steel floorbeam system; replacing existing deck connection hardware and retorquing hanger connections; retreating the existing glu-laminated timber arches and sidewalks; removing/reinstalling the membrane waterproofing and asphalt over the deck including repaving the approach roadway; and replacement of the approach guiderail. SDB Participation Goal 0% VBE Participation Goal 0% Engineer's Estimate: Over $1M
10/03/2024 06:00 PM UTC
FDC-010-103277.1
Structure Replacement Bridge A - No. 10-0001, Graham Road Over Graham Run Bridge B - No. 10-0002, Graham Road Over East Ferney Run Roadway Rehabilitation Graham Road Forest District 10, Sproul State Forest Colebrook Township Clinton County, Pennsylvania Replace 2 structures with P/S Concrete Plank Beam bridge, and Precast Concrete Box Culvert. In addition, construction of a slide repair and placement of driving surface material on Graham Road. SDB Participation Goal 8% VBE Participation Goal 3% Engineer's Estimate: Over $1M
09/19/2024 06:00 PM UTC
FDC-011-10059.1
Structure Replacement Bridge No. 5111-0014 Bear Creek Blvd over Laurel Run Forest District 11, Pinchot State Forest Plains Township, Luzerne County, Pennsylvania Project Description: a. All site work to suit project preparation, execution, and completion. b. Partial demolition of the existing structure carrying Bear Creek Blvd over Laurel Run consisting of a 45’-0” long x 35’-0” wide Reinforced Concrete T Beam bridge. This structure will be replaced with a Single Span Composite Prestressed Concrete Spread Box Beam Superstructure atop Cast-in-Place Reinforced Concrete Cantilever Abutments that will provide a 18’ clear roadway width between the Structure Mounted Guide Rail barriers. The existing bridge substructure will be demolished to Elevation 1022.00 and the new bridge will span past the existing abutments and wingwalls. Replacement includes driving surface aggregate, rock lining, and architectural surface treatment. c. Construction of structure mounted guide rail barrier, measured from end of structure to end of structure. d. Construction of approach guide rail including: 12’-6” Type 31-S Guide Rail with 37’-6” Turned Down End Treatments at all four (4) corners. SDB Participation Goal: 6 % VBE Participation Goal: 3 % Engineer's Estimate: $ 800,000 - $ 1 Million
09/19/2024 06:00 PM UTC
FDC-007-10056.1
Structure Replacement, Bridge No. 5107-0056 Poe Paddy Drive Over Swamp Run Forest District 7, Bald Eagle State Forest Penn Township, Centre County, Pennsylvania The proposed project includes a structure replacement of Poe Paddy Drive over Pine Swamp Run. It will be replacing the existing reinforced concrete slab structure with a precast reinforced concrete arch culvert at the same location as the existing structure. The proposed structure will provide two lanes of unopposed traffic as well as adequate barrier and approach guide rail updates where necessary. DGS Small Business Certification Required Engineer's Estimate: $500,0000 - $1M
09/19/2024 06:00 PM UTC
FDC-009-103274.1
Structure Replacement, Bridge No. 09-0053 Claymine Road Over Corbin Run Forest District 9, Moshannon State Forest Rush Township, Centre County, Pennsylvania This project will replace a partially collapsed 36” diameter corrugated metal pipe culvert on Claymine Road. The existing culvert is significantly undersized to provide the flow capacity necessary for the large upstream drainage area, which includes a significant amount of surface water runoff from the Mid-State Regional Airport runways. The proposed replacement structure is a precast concrete spread box beam superstructure supported by an integral abutment substructure. SDB Participation Goal 12% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1M
09/19/2024 06:00 PM UTC
FDC-418-103107.4R
Electrical Construction Construct New Park Office Marsh Creek State Park Upper Uwchlan Township, Chester County, Pennsylvania. Project Description The work under this project consists of the construction of a new Park Office and associated site development. Work performed under the contract shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of, the Department SDB Participation Goal: Base Bid 1: 5% - Base Bid 2: 0% VBE Participation Goal: Base Bid 1: 3% - Base Bid 2: 0% Engineer's Estimate: over $1 Million
09/12/2024 06:00 PM UTC
61 - 70 of 178 Solicitations
1 2 3 4 5 7 9 10 11 17 18