General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-103194.1
Water Treatment Facility, Forest District Office Moshannon State Forest Pine Township, Clearfield County, Pennsylvania This project includes the construction of a water treatment system and connection to a new groundwater source, to provide drinking water to the Moshannon State Forest District Office. This will require the installation of a submersible well pump, drop piping, pitless adaptor, sanitary seal well cap, and necessary appurtenances required to convey groundwater from the existing well source. Raw water distribution piping will be installed to connect the groundwater source to the District Office. A water treatment system will be constructed to provide disinfection, oxidation, greensand plus filtration, water storage, and pressurization. A backwash disposal system will be constructed to properly remove all regenerated water from the treatment process. Selective demolition and abandonment of existing water system piping is anticipated. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
05/15/2025 05:00 PM UTC
FDC-300-10790.1
Structure Replacement, Bridge A. No. 317-0802 Swimming Pool Road Over UNT to Little Buffalo Creek, Little Buffalo State Park, Centre Township, Perry County Structure Replacement, Bridge B. No. 6306-0001 Quaker Race Area Road Over UNT to Beaver Creek, Gifford Pinchot State Park, Warrington Township, York County This project will replace the existing corrugated metal pipe arch conveying the UNT to Little Buffalo Creek under Swimming Pool Road with a precast box culvert in Little Buffalo State Park and the existing corrugated metal pipe conveying the UNT to Beaver Creek under Quaker Race Area Road with an elliptical pipe in Gifford Pinchot State Park. Other work includes rock lining, channel realignments, precast concrete sections, headwalls, endwalls and aprons, architectural surface, asphalt approach roadway, DSA approach roadway, and guide rails. SDB Participation Goal 20% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1 Million
05/15/2025 05:00 PM UTC
FDC-202-07009.1
Rehab Suspension Bridge, Bridge No. 6202-0202 Swinging Bridge Over Toms Run Cook Forest State Park Farmington Township, Clarion County Rehabbing the existing foot bridge to extend service life. Repair will include removal, repair, replacement of the existing floor system, hand railing, hanger rods, tower, cleaning and painting the structural steel. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
05/15/2025 05:00 PM UTC
FDC-429-102287.1
General Construction Day Use CXT - Hillside Lackawanna State Park Dalton Township, Lackawanna County, Pennsylvania Work included under this contract consists of all site erosion sediment and control, miscellaneous demolition and site clearing, excavation, trenching, backfill, construction of ADA parking lot, ADA pedestrian paths, Installation of pre-fabricated comfort station, water and sanitary sewer service, seeding, mulching, landscaping, electrical service and connections and all general construction and electrical construction work as indicated on the Contract Drawings. SDB Participation Goal 21% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1 Million
05/15/2025 05:00 PM UTC
FDC-429-102287.4
Electrical Construction Day Use CXT - Hillside Lackawanna State Park Dalton Township, Lackawanna County, Pennsylvania Work included under this contract consists of all site erosion sediment and control, miscellaneous demolition and site clearing, excavation, trenching, backfill, construction of ADA parking lot, ADA pedestrian paths, Installation of pre-fabricated comfort station, water and sanitary sewer service, seeding, mulching, landscaping, electrical service and connections and all general construction and electrical construction work as indicated on the Contract Drawings. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $75,000
05/15/2025 05:00 PM UTC
FDC-211-103264.2R
Mechanical Construction Visitor Center HVAC Rehab Ohiopyle State Park Ohiopyle Borough, Fayette County, Pennsylvania This project will consist of selective demolition of the Biological Treatment room interior finishes and HVAC systems. Removal and reinstallation of certain items will also be necessary. New work will include insulation, air barriers and sealing off penetrations. Interior paint and repairs to existing aluminum-faced storefronts and glazed aluminum curtain walls. Installation of a new dehumidification unit with associated ductwork, new wall mounted instantaneous water heater to the heat pump loop, new supply and return water connections, valves, etc., and a new exhaust fan with pressurization control system. DGS Small Business Certification Required Engineer's Estimate: $100,000-$350,000
05/29/2025 05:00 PM UTC
FDC-001-103112.1
ATV Trail System Rehab Forest District 01, Michaux State Forest Menallen Township, Adams County, Pennsylvania To rehab and construct nearly 3,300 LF of ATV trail to connect Grave Ridge Trail to the nearby Log Sled Trail. This project also includes a prefabricated pedestrian bridge crossing Mountain Creek. The total land disturbance will be over one (1) acre, therefore a NPDES permit will be required. Construction of a new crossing will require a Joint Permit Application. SDB Participation Goal: 15% VBE Participation Goal: 3% Engineer's Estimate: Over $1 Million
05/29/2025 05:00 PM UTC
FDC-211-103264.1R
General Construction Visitor Center HVAC Rehab Ohiopyle State Park Ohiopyle Borough, Fayette County, Pennsylvania This project will consist of selective demolition of the Biological Treatment room interior finishes and HVAC systems. Removal and reinstallation of certain items will also be necessary. New work will include insulation, air barriers and sealing off penetrations. Interior paint and repairs to existing aluminum-faced storefronts and glazed aluminum curtain walls. Installation of a new dehumidification unit with associated ductwork, new wall mounted instantaneous water heater to the heat pump loop, new supply and return water connections, valves, etc., and a new exhaust fan with pressurization control system. DGS Small Business Certification Required Engineer's Estimate: $100,000-$350,000
05/29/2025 05:00 PM UTC
FDC-133-103878.4
Upgrade Electric Service to Well Houses Bald Eagle State Park Howard and Liberty Township, Centre County, Pennsylvania The work under this project consists of upgrading the electric service to Well Houses #1 & #2 on the grounds of Bald Eagle State Park (149 Main Park Road, Howard, PA). DGS Small Business Certification Required Engineer's Estimate: $50,000-$100,000
05/29/2025 05:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
FDC-014-11302.1
Project Name: Plug and Properly Abandon Orphaned Oil & Gas Wells North Tank Hill Tract DGS 196-13, Phase 3 Forest District 14, Cornplanter State Forest Harmony Township, Forest County, Pennsylvania Project Description: Work included under this Contract consists of the construction required to clean out and plug twenty-one (21) orphaned oil & gas wells. Major items of work include construction of access routes to the wells, using approved well plugging equipment and materials to clean out and seal the wells, along with restoring the areas after construction. Proper erosion and sediment controls must be implemented during and after construction until the sites are stabilized. SDB Participation Goal: 0% VBE Participation Goal: 0 % Engineer's Estimate: $ 500,000- $1 Million
09/05/2024 06:00 PM UTC
FDC-523-101681.1
Superstructure Replacement Bridge No. 6423-1301 Cabin Bridge Road over Loyalsock Creek Worlds End State Park, Forks Township, Sullivan County, Pennsylvania Project Description: All site work to suit project preparation, execution and completion. b. Removal of existing non-composite, pre-stressed concrete adjacent box beam superstructure carrying Cabin Bridge Road over Loyalsock Creek and replacement with a composite, prestressed concrete adjacent box beam superstructure. Other work includes rock lining, architectural surface treatment, and guide rail. c. Construction of asphalt paving approach roadway, shoulder grading, guide rail, concrete structure barrier, barrier transitions, a terminal section, and an impact attenuator SDB Participation Goal: 8% VBE Participation Goal: 3% Engineer's Estimate: $800,000- $ 1 Million
09/05/2024 06:00 PM UTC
FDC-451-103306.1R
Structure Replacement, Bridge No. 6451-7502, Charles Bailey Trail Over UNT to East Branch White Clay Creek White Clay Creek Preserve London Britain Township, Chester County, Pennsylvania Demolition of the remaining portions of the existing structure which formerly carried Charles Bailey Trail over Unnamed Tributary to East Branch White Clay Creek (15 7935 6451 7501) in White Clay Creek Preserve. The existing single span concrete slab superstructure is no longer in place as it was washed out by flooding. Only portions of the existing stone masonry abutments remain. The remnant of the washed-out superstructure is stockpiled (rubble) on the east approach. This structure will be replaced with one precast reinforced concrete box culvert with precast reinforced concrete end sections which will provide an 8-foot useable trail width; 14-foot clear span and 7-foot rise. Replacement includes Driving Surface Aggregate (DSA) – 6” Depth, rock lining, and architectural surface treatment. Construction of 200 total linear feet of permanent timber split rail fence across the culvert. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
09/05/2024 06:00 PM UTC
FDC-211-100726.1
Replace Campground Water Tower Ohiopyle State Park Stewart Township, Fayette County, Pennsylvania Work included under this Contract consists of the design construction for a new bolted steel potable water tower at Ohiopyle State Park. Major items of work include design plans, permitting and construction of a new 150,000 gallon bolted steel potable water storage tank. The existing 225,000 gallon tank will be demolished once the new tank is put into service. Site improvements include new gravel access drive and parking area, chain link fencing, site grading for and around the water tower, storm drainage, and erosion and sediment controls. SDB Participation Goal 20% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $900,000
08/22/2024 06:00 PM UTC
FDC-427-11252.1
Waterline Break Permanent Repair Under Ridley Creek Ridley Creek State Park Edgmont Township, Delaware County, Pennsylvania Work included under this contract consists of the complete construction of replacing an existing 8” Cast Iron watermain under Ridley Creek with approximately 130 L.F. of 8” DR-11 HDPE pipe PE4710. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
08/22/2024 06:00 PM UTC
FDC-133-103473.4R
Sewage Treatment Plant Rehabilitation Bald Eagle State Park Liberty Township, Centre County, Pennsylvania Project Description: Work covers the upgrade of the existing wastewater treatment facility owned and operated by Bald Eagle State Park, located in Liberty Township, Centre County. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
08/22/2024 06:00 PM UTC
FDC-418-103107.1
General Construction Construct New Park Office, Marsh Creek State Park Upper Uwchlan Township, Chester County, Pennsylvania. Project Description The work under this project consists of the construction of a new Park Office and associated site development. Work performed under the contract shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of, the Department SDB Participation Goal: 7 % VBE Participation Goal: 3 % Engineer's Estimate: $ 3 Million-$5 million
08/08/2024 06:00 PM UTC
FDC-418-103107.2
Project Name: Construct New Park Office, Marsh Creek State Park Upper Uwchlan Township, Chester County, Pennsylvania. Project Description The work under this project consists of the construction of a new Park Office and associated site development. Work performed under the contract shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of, the Department DGS Small Business Certification Required Engineer's Estimate: $ 500,000-$600,000
08/08/2024 06:00 PM UTC
FDC-418-103107.3
Project Name: Plumbing Construction Construct New Park Office, Marsh Creek State Park Upper Uwchlan Township, Chester County, Pennsylvania. Project Description The work under this project consists of the construction of a new Park Office and associated site development. Work performed under the contract shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of, the Department DGS Small Business Certification Required Engineer's Estimate:$ 50,000-150,000
08/08/2024 06:00 PM UTC
FDC-418-103107.4
Project Name Electrical Construction Construct New Park Office, Marsh Creek State Park Upper Uwchlan Township, Chester County, Pennsylvania. Project Description The work under this project consists of the construction of a new Park Office and associated site development. Work performed under the contract shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of, the Department SDB Participation Goal: Base Bid 1: 5% - Base Bid 2: 0% VBE Participation Goal: Base Bid 1: 3% - Base Bid 2: 0% Engineer's Estimate: $1 Million-2 Million
08/08/2024 06:00 PM UTC
71 - 80 of 178 Solicitations
1 2 3 4 5 6 8 10 11 12 17 18