Geauga County Engineer's Office
12665 Merritt Rd, Chardon, OH 44024-8000
(440) 279-1800
12665 Merritt Rd, Chardon, OH 44024-8000
(440) 279-1800
Name * | Description | |
---|---|---|
2025 GCE - Standard Contract Provisions for Improvement Project Contracts.pdf (538 KB) | ||
2025 GCE - Modifications to ODOT CMS 2023.pdf (873 KB) | ||
Number | Deadline |
---|---|
RS-RUS-V-2025
The asphalt resurfacing of various roads including Beechwood Drive, Deerbrook Drive, Hunting Hills Drive, and Squire Lane. This is approximately one and eight-hundredths (1.08) miles.
| 05/09/2025 02:00 PM UTC |
RC-CHE-V-2025
The Reconstruction of Pinewood Trail and Woodlands Trail in Chester Township. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 1.0 mile of roadway. All work for this project shall be completed within the construction limits.
| 05/09/2025 02:00 PM UTC |
RC-AUB-V-2025
This project shall include the reconstruction of Regal Place, Moreland Lane, Cooper Court, and Jensen Court. The work shall include improvement of approximately 1.02 miles of roadway.
| 05/09/2025 02:00 PM UTC |
RS-0008-GL-2025
This project shall include the asphalt resurfacing of Wilson Mills Road from Heath Road to Thwing Road. The work shall include improvement of approximately 4.48 miles of roadway.
| 05/23/2025 02:00 PM UTC |
Number | Deadline |
---|---|
RC-BAI-V-2025
The Reconstruction of Plum Creek Trail and Southbrook Trail, 0.5 miles of roadway improvement including cement stabilized subgrade, full depth asphalt resurfacing, curb and underdrain replacement, driveway aprons, and drainage improvements.
| 03/28/2025 02:15 PM UTC |
CU-GEA-V-2025
The project shall include the replacement of eight (8) culverts on Wilson Mills Road and the connecting side roads, including Stonegate Drive, Riverwood Drive, Basswood Road, Woodiebrook Road, and Winchester Drive in Munson township. Ranging from fifteen inches (15") to eighteen inches (18") in diameter, with ditch pipe and end structure installation.
| 03/14/2025 02:00 PM UTC |
RS-0004-RU-2024
The project shall include the asphalt resurfacing of Auburn Road from Chardon Road, US 6, to Colburn Road. The work shall include improvement of approximately 4.17 miles of roadway.
| 12/20/2024 03:00 PM UTC |
BG-GEA-V-2024
The construction of a salt storage building with a capacity of 6,600 tons of salt on an approximate footprint of 112' x 96' with concrete foundations.
| 11/01/2024 02:00 PM UTC |
RS-GEA-V2-2024
Asphalt Resurfacing of Clay Street, Sections E-F and Leggett Road, Section A. The project locations are generally shown on the Location Map. The work shall include improvements of 3.65 miles of roadway.
| 11/01/2024 02:00 PM UTC |
RS-0013-AD-2024
The Asphalt Resurfacing of Sections A-D of Chardon Windsor Road, CH-0013 from Grant Street to Old State Road. The work shall include improvement of approximately 3.56 miles of roadway.
| 05/31/2024 02:00 PM UTC |
RS-0004-KM-2024
The Asphalt Resurfacing of Sections K-M of Auburn Road, CH-0004 from Fairmount Road to Mayfield Road. The work shall include improvement of approximately 2.53 miles of roadway.
| 05/31/2024 02:00 PM UTC |
BR-0012-F-03.590-2024
The replacement of the Sperry Road Bridge including the removal of structure #0012-0359, a dual barrel 11'-10" metal plate pipe arch, and replacement with a 22' X 6' precast concrete box culvert with precast wingwall blocks and headwalls.
| 05/31/2024 02:00 PM UTC |
RS-TRO-V-2024
The Asphalt Resurfacing of Section B of Patch Road and Great Lakes Parkway. The project locations are generally shown on the Location Map. The work shall include improvement of 1.27 miles of roadway. All work for this project shall be completed within the construction limits.
| 05/31/2024 02:00 PM UTC |
RS-NEW-V-2024
The Asphalt Resurfacing of Pekin Road from Sperry Road to Auburn Road, Country River Road, and Chagrin Woods Drive. The project locations are generally shown on the Location Map. The work shall include improvement of 4.27 miles of roadway. All work for this project shall be completed within the construction limits.
| 05/24/2024 02:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.