General Info

Business Logo

Geauga County Engineer's Office

12665 Merritt Rd, Chardon, OH 44024-8000
(440) 279-1800


Upcoming Solicitations

Number Deadline
RS-RUS-V-2025
The asphalt resurfacing of various roads including Beechwood Drive, Deerbrook Drive, Hunting Hills Drive, and Squire Lane. This is approximately one and eight-hundredths (1.08) miles.
05/09/2025 02:00 PM UTC
RC-CHE-V-2025
The Reconstruction of Pinewood Trail and Woodlands Trail in Chester Township. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 1.0 mile of roadway. All work for this project shall be completed within the construction limits.
05/09/2025 02:00 PM UTC
RC-AUB-V-2025
This project shall include the reconstruction of Regal Place, Moreland Lane, Cooper Court, and Jensen Court. The work shall include improvement of approximately 1.02 miles of roadway.
05/09/2025 02:00 PM UTC
RS-0008-GL-2025
This project shall include the asphalt resurfacing of Wilson Mills Road from Heath Road to Thwing Road. The work shall include improvement of approximately 4.48 miles of roadway.
05/23/2025 02:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
RC-BAI-V-2025
The Reconstruction of Plum Creek Trail and Southbrook Trail, 0.5 miles of roadway improvement including cement stabilized subgrade, full depth asphalt resurfacing, curb and underdrain replacement, driveway aprons, and drainage improvements.
03/28/2025 02:15 PM UTC
CU-GEA-V-2025
The project shall include the replacement of eight (8) culverts on Wilson Mills Road and the connecting side roads, including Stonegate Drive, Riverwood Drive, Basswood Road, Woodiebrook Road, and Winchester Drive in Munson township. Ranging from fifteen inches (15") to eighteen inches (18") in diameter, with ditch pipe and end structure installation.
03/14/2025 02:00 PM UTC
RS-0004-RU-2024
The project shall include the asphalt resurfacing of Auburn Road from Chardon Road, US 6, to Colburn Road. The work shall include improvement of approximately 4.17 miles of roadway.
12/20/2024 03:00 PM UTC
BG-GEA-V-2024
The construction of a salt storage building with a capacity of 6,600 tons of salt on an approximate footprint of 112' x 96' with concrete foundations.
11/01/2024 02:00 PM UTC
RS-GEA-V2-2024
Asphalt Resurfacing of Clay Street, Sections E-F and Leggett Road, Section A. The project locations are generally shown on the Location Map. The work shall include improvements of 3.65 miles of roadway.
11/01/2024 02:00 PM UTC
RS-0013-AD-2024
The Asphalt Resurfacing of Sections A-D of Chardon Windsor Road, CH-0013 from Grant Street to Old State Road. The work shall include improvement of approximately 3.56 miles of roadway.
05/31/2024 02:00 PM UTC
RS-0004-KM-2024
The Asphalt Resurfacing of Sections K-M of Auburn Road, CH-0004 from Fairmount Road to Mayfield Road. The work shall include improvement of approximately 2.53 miles of roadway.
05/31/2024 02:00 PM UTC
BR-0012-F-03.590-2024
The replacement of the Sperry Road Bridge including the removal of structure #0012-0359, a dual barrel 11'-10" metal plate pipe arch, and replacement with a 22' X 6' precast concrete box culvert with precast wingwall blocks and headwalls.
05/31/2024 02:00 PM UTC
RS-TRO-V-2024
The Asphalt Resurfacing of Section B of Patch Road and Great Lakes Parkway. The project locations are generally shown on the Location Map. The work shall include improvement of 1.27 miles of roadway. All work for this project shall be completed within the construction limits.
05/31/2024 02:00 PM UTC
RS-NEW-V-2024
The Asphalt Resurfacing of Pekin Road from Sperry Road to Auburn Road, Country River Road, and Chagrin Woods Drive. The project locations are generally shown on the Location Map. The work shall include improvement of 4.27 miles of roadway. All work for this project shall be completed within the construction limits.
05/24/2024 02:00 PM UTC
11 - 20 of 36 Solicitations
2 4