General Info

Business Logo

City of Streetsboro, Ohio

9184 State Route 43, Streetsboro, OH 44241-5322
(330) 626-4942

Long before settlers moved into the Connecticut Western Reserve, Seneca Indians traversed the area now called Streetsboro. They used Old Portage Trail, which crosses the southwest corner of the city, to go from Lake Erie to the Ohio River basin.

The founder of Streetsboro Township was Titus Street from Connecticut, who purchased the land in 1798. Streetsboro Township contained 15,279 acres (61.83 km2). The land was surveyed by Streets' agents Ralph Cowles and Lemuel Punderson in the summer of 1822 and divided into lots of 100 acres (0.40 km2).

In 1825, a turnpike from Cleveland to Wellsville, Ohio was laid by Frederick Wadsworth, Samuel Cowles, John Strauyhen and Titus Street. Street agreed to give enough land to make it through the township. In 1827, the turnpike was completed. It followed much of the route of the present Ohio State Route 14.

Major growth occurred in Streetsboro with the opening of the Ohio Turnpike on October 1, 1955, with Exit 13 (now known as Exit 187) initially being the only interchange in Portage County. By 1957, with the growth of the automobile industry, Streetsboro experienced a population explosion. Proximity to the Akron and Cleveland areas, along with direct access to Interstate 80 (Ohio Turnpike), Interstate 480 and State Routes 303, 43 and 14, have greatly contributed to the rapid growth of manufacturing, distribution, commercial and residential development in the past fifty years.

In 1968, voters decided to merge the township and the village to become one city consisting of 25 square miles (65 km2). Streetsboro was primarily a farming community until 1970.

Streetsboro was home to a small amusement park, Shady Lake Park, located on Route 14, which is now an apartment complex of the same name.

Due to the steady growth of Streetsboro and its surrounding area within the past ten years, the city has become a retail hub for Portage County with the arrival of many national big-box retailers including Wal-Mart Supercenter, Target, Lowe's, The Home Depot and Staples. The first Northeast Ohio location for Sonic Drive-In opened in Streetsboro in September 2008.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Police Department Replacement Roof
The City of Streetsboro is seeking a reputable contractor to perform the following project; generally includes removal and disposal of the existing roofing; repair/replacement of damaged roof decking; installation of new Class 4 architectural shingles and a new 0.90 mil EPDM or comparable flat-roof system; flashing and penetration repairs; protection of property; cleanup and disposal; permits and code compliance; and all labor, materials, equipment, and incidental work necessary to provide a complete, weather-tight roofing system.
08/28/2026 03:00 PM UTC
2026 Road Resurfacing Program
The scope of work for this project includes the following: asphalt resurfacing, intermediate leveling course, milling and partial and full depth pavement repairs. Contractor may visit the various sites to view existing conditions and base their bid accordingly. Work items listed for work locations are approximate only and may not include all work required for that street. The project locations consist of public roadways that include Green Tree Subdivision (Holborn, Jenwood, Dawnwood & Autumn Court), Elliman Road, and Ferguson Road. An alternate includes Quail Chase Subdivision (Hunting Valley Lane, Tanager Lane & Meadow Sweet Lane).
06/25/2026 03:00 PM UTC
Streetsboro City Center Activity Area Playground
This project includes installing and/or furnishing all labor, equipment, materials, and incidentals required to make the proposed site improvements to improve and install a playground, concrete sidewalk and all associated furnishings and underground infrastructure. Utility extensions and modifications including storm sewer and site electrical conduit wiring and lighting installations will also be included in this project. Site restoration work for reseeding disturbed areas and site landscaping will be performed.
04/29/2026 03:00 PM UTC
SR 43 City Center Pedestrian Crossing
THIS PROJECT CONSISTS OF ADDING A SIDEWALK ALONG THE WEST SIDE OF STATE ROUTE 43 WITH NEW CURB RAMPS FOR PEDESTRIAN CROSSINGS. ALSO INCLUDED IS DRIVEWAY RELOCATION AND CASTING ADJUSTMENTS.
03/26/2026 03:00 PM UTC
2026 Pavement Marking Program
The intent of this project is to provide yearly Pavement Marking services in accordance with the bid form contained herein to the City of Streetsboro, Ohio (City) for five (5) years, 2026, 2027, 2028, 2029 and 2030. As such, the Contractor will provide all materials, equipment and labor to install Pavement Markings including but not limited to lane lines, stop bars, crosswalk, words on pavement, and directional arrows in accordance to the most current edition of the Ohio Manual of Uniform Traffic Control Devices and The State of Ohio, Department of Transportation Construction and Material Specifications. These Pavement Markings will be throughout the City as identified by the Service Director or his designee. The project will be awarded based upon the base bid price for 2026, however the City will consider the prices submitted for the 2027, 2028, 2029 & 2030 base bids and when choosing the lowest and best bid. You may reference the 2026 Pavement Marking Program Documents for all detailed specifications, maps and other pertinent items related to this bid.
01/29/2026 04:00 PM UTC
Aurora-Hudson Waterline Replacement
THIS PROJECT CONSISTS OF INSTALLING A NEW 8" WATER MAIN AND ABANDONING THE EXISTING 12" WATER MAIN ALONG THE SOUTH SIDE OF AURORA HUDSON ROAD
11/05/2025 04:00 PM UTC
Miracle Lane Roadway Improvements
This project consists of 1200 feet of pavement widening along Miracle Lane south along with drainage improvements.
08/13/2025 03:00 PM UTC
2025 Chip and Seal Repairs
Base Bid Chip and Seal Repairs: a. Ferguson Road (Seasons Road to South Corporation Limit) b. Elliman Road (Frost Road to Bartlett Road) Contractor to provide single course chip and seal overlay. Contractor to provide pavement roadway markings to match existing pavement markings.
05/20/2025 03:00 PM UTC
2025 Mowing Maintenance
The City of Streetsboro is seeking a reputable contractor to perform mowing services for the 2025 season (approximately eight months, at the beginning of April through approximately the end of November). This is a one-year contract with renewal options for years 2 and 3.
03/03/2025 04:00 PM UTC
2024 Repair & Resurfacing of Residential Collectors
The work for this project generally includes asphalt resurfacing, leveling, milling and partial and full depth repairs. Contractor shall visit the various sites to view existing conditions and base their bid accordingly. Work items listed for work locations are approximate only and may not include all work required for that street. The project locations consist of four public roadways that include Barlett Road, Elliman Road, Page Road & Luke Drive.
03/28/2024 03:00 PM UTC
10 Solicitations