01-2026
The project consists of roadway reconstruction on County Highway E (CTH E) beginning at USH 45 and extending east approximately 2.8 miles to the intersection of the second Blong Road in the Towns of Land O’ Lakes and Phelps. Project limits include work through the CTH E /Blong Road intersection, extending beyond the existing intersection radius to ensure proper alignment and pavement transitions.
Work under this contract includes, but is not limited to:
Pulverizing the existing asphalt roadway surface.
Shaping and grading the pulverized material to the required cross-section.
Placement of 3 inches of hot-mix asphalt (HMA) in two lifts, meeting applicable WisDOT specifications.
Construction of a finished roadway with:
Eleven-foot driving lanes
Three-foot paved shoulders
Three-foot gravel shoulders
Intersection work, including all necessary grading, shaping, and paving to properly tie into the existing roadway.
All materials, workmanship, traffic control, mobilization, and restoration shall comply with current WisDOT Standard Specifications for Highway and Structure Construction, the project special provisions, and the bid documents.
| 03/10/2026 02:00 PM UTC |
|
02-2026
Project Scope-Long line road center and edge striping on various County Trunk Highways.
| 03/10/2026 02:00 PM UTC |
|
02-2025
Project Scope-Long line road center and edge striping on various County Trunk Highways.
| 02/18/2025 03:00 PM UTC |
|
01-2025
This project on CTH W addresses multiple sections between Tower Road and CTH B with different scopes of work. The main component of the project is from CTH K to CTH P. This section is an LRIP-S project that will involve pulverizing the existing pavement, shaping and grading the road base, and placing and compacting the new asphalt. For the remaining sections, the project will be adding paved shoulders to the existing roadway.
| 02/18/2025 02:00 PM UTC |
|
2024-04
Downtown Boulder Junction Milling & Paving- Scope of work to include milling and relaying 2.5" of asphalt, pavement markings and thermoplastic snowmobile crossings.
| 04/08/2024 02:00 PM UTC |
|
2024-01_CTH M
CTH M Road Construction is a WisDOT LRIP Supplemental project and Scope of Work consists of pulverization, shaping, final grading, compacting and placement of asphalt.
| 03/11/2024 02:00 PM UTC |
|
2024-02_Road Striping
Project Scope-Long line road center and edge striping on various County Trunk Highways.
| 03/11/2024 02:00 PM UTC |
|
2024-03_CTH N
Scope of work CTH N – The work under this contract consists of tack coat and HMA overlaying the existing roadway with 1” X 22’ of compacted 6LT hot mix asphalt leveling course and application of CRS-2 emulsion oil, seal coat aggregate and subsequent CSS-1H D50 fog seal oil and all incidental items necessary to complete the work.
| 03/11/2024 02:00 PM UTC |
|
8 Solicitations
|
|
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.