General Info

Business Logo

Vilas County Highway Department, WI

PO Box 1568, Eagle River, WI 54521-1568
(715) 479-4641


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
01-2026
The project consists of roadway reconstruction on County Highway E (CTH E) beginning at USH 45 and extending east approximately 2.8 miles to the intersection of the second Blong Road in the Towns of Land O’ Lakes and Phelps. Project limits include work through the CTH E /Blong Road intersection, extending beyond the existing intersection radius to ensure proper alignment and pavement transitions. Work under this contract includes, but is not limited to: Pulverizing the existing asphalt roadway surface. Shaping and grading the pulverized material to the required cross-section. Placement of 3 inches of hot-mix asphalt (HMA) in two lifts, meeting applicable WisDOT specifications. Construction of a finished roadway with: Eleven-foot driving lanes Three-foot paved shoulders Three-foot gravel shoulders Intersection work, including all necessary grading, shaping, and paving to properly tie into the existing roadway. All materials, workmanship, traffic control, mobilization, and restoration shall comply with current WisDOT Standard Specifications for Highway and Structure Construction, the project special provisions, and the bid documents.
03/10/2026 02:00 PM UTC
02-2026
Project Scope-Long line road center and edge striping on various County Trunk Highways.
03/10/2026 02:00 PM UTC
02-2025
Project Scope-Long line road center and edge striping on various County Trunk Highways.
02/18/2025 03:00 PM UTC
01-2025
This project on CTH W addresses multiple sections between Tower Road and CTH B with different scopes of work. The main component of the project is from CTH K to CTH P. This section is an LRIP-S project that will involve pulverizing the existing pavement, shaping and grading the road base, and placing and compacting the new asphalt. For the remaining sections, the project will be adding paved shoulders to the existing roadway.
02/18/2025 02:00 PM UTC
2024-04
Downtown Boulder Junction Milling & Paving- Scope of work to include milling and relaying 2.5" of asphalt, pavement markings and thermoplastic snowmobile crossings.
04/08/2024 02:00 PM UTC
2024-01_CTH M
CTH M Road Construction is a WisDOT LRIP Supplemental project and Scope of Work consists of pulverization, shaping, final grading, compacting and placement of asphalt.
03/11/2024 02:00 PM UTC
2024-02_Road Striping
Project Scope-Long line road center and edge striping on various County Trunk Highways.
03/11/2024 02:00 PM UTC
2024-03_CTH N
Scope of work CTH N – The work under this contract consists of tack coat and HMA overlaying the existing roadway with 1” X 22’ of compacted 6LT hot mix asphalt leveling course and application of CRS-2 emulsion oil, seal coat aggregate and subsequent CSS-1H D50 fog seal oil and all incidental items necessary to complete the work.
03/11/2024 02:00 PM UTC
8 Solicitations