General Info

Business Logo

Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division

10 Park Plz, Boston, MA 02116-3933
(617) 222-3200


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
A34CN01 CMAR DTX/CENTRAL TRFQ Reinvite Glass and Glazing
Description Downtown Crossing Trade Package The purpose of this proposed work is to provide three new accessible transfer elevators at Downtown Crossing and Park Street Stations, and at Central Square Station, replace the existing outbound platform elevator and install 2 new elevators, while providing a more accessible, code compliant station. Request for Qualifications for the following Trade: Glass and Glazing -Downtown Crossing
07/15/2026 03:00 PM UTC
X92PS03- Request for Qualification
The Massachusetts Bay Transportation Authority is soliciting consulting services. The MBTA Quincy Traction Power Substation (TPSS) is a replacement of a exciting 53-year-old substation serving the Redline transit power needs with additional capacity to also serve the present and future power needs of the Quincy Center Station at Quincy, MA. The new TPSS will be constructed on MBTA ROW and portions of a privately owned property located adjacent to the tracks, Northeast of the Quincy Center Station, and South of Dimmock Street. The taking process of the proposed site has started. The MBTA Real Estate group is in charge of the taking process assisted by a consultant appointed for the same reason. The MBTA Power department has the need for twin 3MVAs feeding a modular substation for which a standard modular design has been completed and will be available upon request at RFP stage. The MBTA wishes to completed and deliver the TPSS with all the necessary site-specific installations, communications integrations, power utility coordination, environmental compliance, commissioning of the new system, de-commissioning of the exciting and power cutover.
07/30/2026 03:00 PM UTC
J63PS01 - Request for Qualification
The Massachusetts Bay Transportation Authority is soliciting consulting services for design and construction phase services (including vicinity master planning around the existing Castle Hill Yard and Salem Station) for two (2) 600ft (TBD) long high-level side platforms (or center platform), railings, and canopies including plumbed-in rainwater drains, elevator(s) with sump pumps and oil/water separators, pedestrian bridge(s), ramp(s), walkways, wayfinding, public address (PA) system, site utilities and relocation, electric power and emergency backup power, lighting, communications equipment, security cameras and call boxes, Variable Message Sign (VMS) units and display TVs, public address (PA) system, fare vending machines (FVM) and automatic fare collection equipment (AFC), 900ft elevated and enclosed community path, environmental and existing structures remediation, landscaping, site retaining and sound walls, track and signals infrastructure, storage shed(s), other station elements/amenities such as display cases, benches and trash cans as required, parking, bus shelter(s), bike shelter(s), passenger drop-off/pick-up areas and traffic calming measures along local roadways, roadway improvements including signage, traffic controls, and off-site improvements, including accessible paths, upgrades to existing bicycle facilities, and temporary facilities. Design may also include snow melting systems, and alternatives to concrete platforms such as FRP for snow melting chemical resistance to meet MBTA durability standards. Design should consider implementing advanced modern construction techniques including offsite prefabricated modular components to speed up construction during the environmental permitting phase.
07/31/2026 03:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
R17CN07- CMAR RFQ
R17CN07 CMAR Arborway Bus Maintenance Facility Project Description The objective of the project is to construct a new, modern bus maintenance and storage facility for up to 200 buses at 500 Arborway. The new facility will support a mixed fleet of battery electric buses and hybrid electric buses. The proposed project includes a new two-story indoor maintenance facility (46,000 SF), a new two-story operations facility (17,000 SF), charging infrastructure facility (16,000 SF), and a new one-story servicing and wash building (14,000 SF), as well as a parking canopy covering the up to 200 bus storage area. The parking canopy will be, at minimum, solar-ready. The project must accommodate approximately 200 parking spaces for employee vehicles (MBTA and employee owned) preferably on site. The scope of work also includes the demolition and abatement of the existing buildings on the 500 Arborway and 327 Forest Hills Street property. [MA
07/10/2026 03:00 PM UTC
A34CN01- CMAR DTX Trade RFQ Glass and Glazing
Downtown Crossing Trade Package The purpose of this proposed work is to provide three new accessible transfer elevators at Downtown Crossing and Park Street Stations, and at Central Square Station, replace the existing outbound platform elevator and install 2 new elevators, while providing a more accessible, code compliant station. Request for Qualifications for the following Trade: Glass and Glazing -Downtown Crossing
07/01/2026 03:00 PM UTC
P00PS01 - Systemwide DC Load Flow and Protection Study
The Massachusetts Bay Transportation Authority is soliciting Engineering services for Systemwide DC Load Flow and Protection Study. The Scope of Service(s) may include but are not limited to: developing, validating, and running a systemwide model using commercially available, non-proprietary software; defining necessary protective relay upgrades to the MBTA’s DC power infrastructure; and supporting implementation of the required system upgrades.
06/23/2026 03:00 PM UTC
Y42CN01 DB RFQ
The purpose of the project is to provide a new access point to the Red Line at Alewife Station. The MBTA Red Line subway northwest of the Charles River operates in a below grade tunnel. Maintenance access is four miles from Alewife Station at the First Street gate. The existing tunnel is over 25-ft below ground surface near Alewife. This Project will complete final design and construction to create the new access point to the Red Line Tunnel in Cambridge, MA near Alewife Station. The Base Technical Concept (“BTC”) consists of a 15-ft wide paved access road, approximately 150 feet in length, followed by a boat section ramp approximately 130-ft long that provides below-grade access to a new tunnel that ties into the existing Red Line tunnel approximately 150-ft from the end of the boat section ramp. The BTC includes constructing the new tunnel structure and boat section ramp within a support of excavation system (SOE). The proposed SOE system includes sheet piling walls, internal bracing, and a working base slab over a jet grout bottom plug. Soil within the excavation area is contaminated. A Final Release Abatement Measure (RAM) needs to be developed that follows the methods described in the Draft RAM plan submitted to the Massachusetts Department of Environmental Protection (MassDEP) in August 2024 or the Public Involvement Plan (PIP) process needs to be re-initiated. Dewatering will also be required as part of the excavation and water needs to be properly discharged. The tunnel and boat section ramp structures are detailed for conventional form and pour concrete methods starting with the base slab and progressing upward to the top of the boat walls and the tunnel roof slab. The final grading and tree planting plan needs to be in accordance with the Order of Conditions issued by the Cambridge Conservation Commission on January 6, 2025 (MassDEP File #123-0325), otherwise the process to receive a new Order of Conditions needs to be re-initiated. To provide access to the existing Red Line Tunnel, two openings approximately 14-ft high x 40-ft wide are included in the BTC into the side of the existing tunnel to connect the new Access Tunnel. This operation will include the partial demolition of the existing Red Line Tunnel slurry walls. Truck pads are included in the BTC within the existing Red Line Tunnel at each of the two openings to provide a designated “on-track” entrance point and “off-track” exit point for equipment and hi-rail vehicles. The BTC equips the new tunnel with a manually operated flood door to prevent unauthorized personnel from accessing the tunnel and to prevent water ingress. The proposed electrical scope of work includes new security devices, lighting within the new tunnel, and electrical modifications within the existing Red Line tunnel.
06/18/2026 03:00 PM UTC
P62CN02 CMAR Trade RFQ - Reinvite Miscellaneous and Ornamental Irons ONLY
Reinvite - CMAR Ashmont and Mattapan Infrastructure Upgrades, Boston, MA Ashmont Infrastructure Upgrades Trade Package Miscellaneous and Ornamental Irons ONLY The Purpose of the Project is to replace the Traction Power Equipment and Building Systems in order to return the facility back to a state of good repair. The capacity of the Ashmont TPSS will be expanded to meet the additional power requirements of the expanded Codman Yard and the upgrade Mattapan High Speed Line. The project scope of the Ashmont TPSS Replacement Project will include a phased full replacement of the traction power electrical equipment as well selected replacement and upgrades of the building structure (roof, masonry) and internal building systems including heating, ventilation, low voltage electrical, plumbing and safety systems. This substation will remain in service during the phased replacement. It is imperative that the service of the substation not be interrupted as it is the power source for the Mattapan Trolleys and Codman Yard.
06/15/2026 03:00 PM UTC
A34CN01- CMAR DTX/CENTRAL Trade RFQ Reinvite
A34CN01-CMAR DTX and Central Square Accessibility CMAR Downtown Crossing Phase 2 and Central Square Station Accessibility Improvements, The purpose of this proposed work is to provide three new accessible transfer elevators at Downtown Crossing and Park Street Stations, and at Central Square Station, replace the existing outbound platform elevator and install 2 new elevators, while providing a more accessible, code compliant station. Request for Qualifications for the following Trades: Waterproofing, Damp-proofing and Caulking Roofing and Flashing Terrazo Tile Elevators HVAC Fire Protection Sprinkler Systems
06/09/2026 03:00 PM UTC
Y42CN01 DB RFLOI Red Line Hi-Rail Access Tunnel
The purpose of this project is to provide a new access point to the Red Line northwest of the Charles River that will accommodate equipment, labor, and material delivery into the tunnel more efficiently. The MBTA Red Line subway northwest of the Charles River consists of a below grade tunnel with access for equipment, such as Hi-Rail vehicles, and maintenance only available just east of the Kendall/MIT station, some four miles from Alewife Station at the First Street gate. With the existing tunnel being over 25-ft below ground surface near Alewife, a tunnel is the most practical means of providing access from grade to the tunnel below for access.
05/05/2026 03:00 PM UTC
P62CN02 CMAR Trade RFQ - Ashmont Infrastructure Upgrades Trade Package
CMAR Ashmont and Mattapan Infrastructure Upgrades, Boston, MA Ashmont Infrastructure Upgrades Trade Package The Purpose of the Project is to replace the Traction Power Equipment and Building Systems in order to return the facility back to a state of good repair. The capacity of the Ashmont TPSS will be expanded to meet the additional power requirements of the expanded Codman Yard and the upgrade Mattapan High Speed Line. The project scope of the Ashmont TPSS Replacement Project will include a phased full replacement of the traction power electrical equipment as well selected replacement and upgrades of the building structure (roof, masonry) and internal building systems including heating, ventilation, low voltage electrical, plumbing and safety systems. This substation will remain in service during the phased replacement. It is imperative that the service of the substation not be interrupted as it is the power source for the Mattapan Trolleys and Codman Yard. Request for Qualifications for the following Trades: Masonry Work Miscellaneous and Ornamental Irons, Waterproofing, Damp-proofing and Caulking Roofing and Flashing Painting Plumbing HVAC Electrical Work
05/05/2026 03:00 PM UTC
A34CN01- CMAR DTX/CENTRAL Trade RFQ
CMAR Downtown Crossing Phase 2 and Central Square Station Accessibility Improvements, The purpose of this proposed work is to provide three new accessible transfer elevators at Downtown Crossing and Park Street Stations, and at Central Square Station, replace the existing outbound platform elevator and install 2 new elevators, while providing a more accessible, code compliant station. Request for Qualifications for the following Trades: Masonry Work Miscellaneous and Ornamental Irons Waterproofing, Damp-proofing and Caulking Roofing and Flashing Painting Terrazo Tile Elevators Plumbing Heating, Ventilating & Air-Conditioning Fire Protection Sprinkler Systems Electrical Work
04/30/2026 03:00 PM UTC
R16PS02 - Request for Qualification
The Massachusetts Bay Transportation Authority is soliciting Design Services for the demolition of existing Lake Street yard tracks, carhouse, catenary and Boston College Station, followed by construction of a new Traction Power Substation building within the yard and reconstruction of the Boston College station. A new Eversource switchgear is to also be installed within the yard.
03/16/2026 03:00 PM UTC
1 - 10 of 48 Solicitations