General Info

Business Logo

City of Vacaville, CA

650 Merchant St, Vacaville, CA 95688-6908
(707) 449-5296


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CIP 1032 - Alamo Creek Bridge Water Line Replacement
The work to be performed consists of furnishing all labor, materials, tools, equipment, traffic control, and incidentals necessary to remove approximately 130 linear feet of an existing 12-inch diameter Asbestos Cement Pipe (ACP) water main and its supports mounted beneath the Alamo Drive Bridge over Alamo Creek. A new 12-inch Ductile Iron Pipe (DIP) water main will replace the existing pipe and be mounted along the bridge’s concrete barrier. The Engineer's Estimate is $397,825 PHYSICAL BID BONDS ARE DUE TO THE CITY OF VACAVILLE'S PUBLIC WORKS DEPARTMENT COUNTER PRIOR TO BID OPENING.
06/29/2026 05:00 PM UTC
CIP 1049 - Bike Trail Pedestrian Improvements Project [Federal Project No. CML-5094(077)]
At three (3) trail crossings, Arlene Drive west of Arlene Way; Briarwood Drive south of Florence Drive; and Fruitvale Road between Ridgewood Drive and Parkridge Drive: Install crosswalks; Rapid Rectangular Flashing Beacons (RRFBs), and associated signing and striping. Engineer's Estimate: $232,944.18 Questions only accepted via e-mail and letter. See specs section 2-1.01 for instructions. Only bid proposals via BidExpress shall be accepted. ORIGINAL BID BOND DUE TO CITY OF VACAVILLE PUBLIC WORKS FRONT COUNTER PRIOR TO DEADLINE. See Spec Section 2-1.04
06/29/2026 09:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CIP #1023 Alamo Creek Park Improvements Project
The general description of work includes group picnic area, picnic tables, benches, pedestrian accessible paths, basketball court, pedestrian path improvements, and landscape and irrigation improvements and other items of work as shown on the Project Plans and specified in the Special Provisions.
02/26/2025 10:00 PM UTC
CIP 1065 - 2025 ADA Curb Ramp Improvements Project
The project consists of the reconstruction of 30 non-compliant curb ramps by installing ADA Compliant curb ramps on Yellowstone Drive, along with sidewalk repairs.
01/21/2025 10:00 PM UTC
11 - 12 of 12 Solicitations