General Info

Business Logo

Notifications are free for this business.

Road Commission for Oakland County

31001 Lahser Road, Beverly Hills, MI 48025
(248) 645-2000

The Road Commission for Oakland County (RCOC) maintains more than 2,700 miles of roads. This is the second largest road system in Michigan, second only to the state highway system.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
57954
SHORE HILL DRIVE CULVERT REHABILITATION - A CONTRACT FOR THE STRUCTURAL REHABILITATION OF TWO (2) 84 INCH DIAMETER CIRCULAR CMP PLATE CULVERTS BY CIPP OR GEOPOLYMER MORTAR METHODS ON SHORE HILL DRIVE OVER SHOREWOOD HILLS POND LOCATED IN WEST BLOOMFIELD AND BLOOMFIELD TOWNSHIPS, OAKLAND COUNTY, MICHIGAN.
07/15/2025 03:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
24201
Upper Straits/Northwood-4" HMA Surfacing over Pulverized Base with Concrete Curb and Gutter, Sodded Shoulders and Minor Drainage Improvements.
03/07/2017 04:00 PM UTC
IFB No. 8932-OQ CONCRETE SAWS
WORK READY, WALK-BEHIND
02/28/2017 07:30 PM UTC
2017098
Maintenance Preservation Overlay - 23.77 Miles of road resurfacing which includes 2 inches of asphalt, cold milling, placing gravel shoulders, adjusting structures, and cold plastic pavement markings located at various locations in Oakland County, Michigan.
02/28/2017 04:00 PM UTC
95117
A CONTRACT FOR INSTALLATION OF COLD PLASTIC PAVEMENT MARKINGS ON VARIOUS ROADS LOCATED IN OAKLAND COUNTY, MICHIGAN
02/28/2017 04:00 PM UTC
93117
A CONTRACT FOR RETROREFLECTIVE RAISED PAVEMENT MARKER INSTALLATION AND REPLACEMENT ON VARIOUS ROADS LOCATED IN OAKLAND COUNTY, MICHIGAN
02/28/2017 04:00 PM UTC
94117
2017 COUNTY WIDE STRIPING PROGRAM
02/28/2017 03:50 PM UTC
RFP 01-2017 Landscaping Installation and Stamped Concrete Work
Work to be accomplished at 31001 Lahser Road, Beverly Hills, MI 48025
02/22/2017 07:30 PM UTC
IFB NO. 8929-OQ, ASPHALT PATCHER PARTS
ANNUAL ESTIMATED QUANTITIES APRIL 1, 2017 THROUGH MARCH 31, 2018
02/21/2017 07:30 PM UTC
IFB NO. 8922-OQ, AUTOMOTIVE BATTERIES
ANNUAL ESTIMATED QUANTITIES APRIL 1, 2017 THROUGH MARCH 31, 2018
02/14/2017 07:30 PM UTC
IFB NO. 8923-OQ ATTENUATOR PARTS
Annual Estimated Quantitites to be released as requested and delivered from April 1, 2017 through March 31, 2018, with two additional option years.
02/14/2017 07:30 PM UTC
261 - 270 of 366 Solicitations
1 2 23 24 25 27 29 30 31 36 37