General Info

Business Logo

Notifications are free for this business.

Road Commission for Oakland County

31001 Lahser Road, Beverly Hills, MI 48025
(248) 645-2000

The Road Commission for Oakland County (RCOC) maintains more than 2,700 miles of roads. This is the second largest road system in Michigan, second only to the state highway system.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
57954
SHORE HILL DRIVE CULVERT REHABILITATION - A CONTRACT FOR THE STRUCTURAL REHABILITATION OF TWO (2) 84 INCH DIAMETER CIRCULAR CMP PLATE CULVERTS BY CIPP OR GEOPOLYMER MORTAR METHODS ON SHORE HILL DRIVE OVER SHOREWOOD HILLS POND LOCATED IN WEST BLOOMFIELD AND BLOOMFIELD TOWNSHIPS, OAKLAND COUNTY, MICHIGAN.
07/15/2025 03:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
53311-MILFORD ROAD REHABILITIATION
A CONTRACT FOR 0.5 MILES OF COLD MILLING HMA PAVEMENT, PAVEMENT REMOVAL, HMA PAVING, ADA UPGRADES, TRAFFIC SIGNAGE, PAVEMENT MARKINGS AND OTHER ASSOCIATED ITEMS OF WORK LOCATED ON MILFORD ROAD BETWEEN LYON CENTER DRIVE AND PONTIAC TRAIL, LYON TOWNSHIP, OAKLAND COUNTY, MICHIGAN.
07/12/2016 03:00 PM UTC
201690 - 2016 LIMESTONE PROGRAM
A CONTRACT FOR THE PLACEMENT OF AGGREGATE SURFACE COARSE 23 A LIMESTONE ON APPROXIMATELY 6 MILES OF ROAD IN VARIOUS LOCATIONS IN LOCATIONS IN OAKLAND COUNTY, MICHIGAN.
07/05/2016 03:00 PM UTC
201680 - 2016, 2017, AND 2018 STORM SEWER CLEANING PROGRAM
A CONTRACT FOR THE MECHANICAL CLEANING OF DRAINAGE STRUCTURES AND STORM SEWER LINES ON VARIOUS CURBED AND GUTTERED PRIMARY ROADS LOCATED IN OAKLAND COUNTY, MICHIGAN.
06/28/2016 03:00 PM UTC
52601-ORCHARD LAKE ROAD AT MAPLE ROAD INTERSECTION IMPROVEMENTS
A CONTRACT FOR 0.6 MILES OF INTERSECTION LANE WIDENINGS INCLUDING HMA PAVING, DRAINAGE IMPROVEMENTS, TRAFFIC SIGNAL ADJUSTMENTS, ADA UPGRADES, SIGNAGE, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS ITEMS OF WORK, LOCATED AT THE ORCHARD LAKE ROAD AND MAPLE ROAD INTERSECTION, WEST BLOOMFIELD TOWNSHIP, OAKLAND COUNTY, MICHIGAN.
06/28/2016 03:00 PM UTC
REFLECTIVE SHEETING, IFB 8868-OQ
ANNUAL ESTIMATED QUANTITIES TO BE RELEASED AS REQUIRED AND DELIVRED FROM AUGUST 1, 2016 THROUGH JULY 31, 2017.
06/21/2016 06:30 PM UTC
GLOVES, IFB NO. 8870-OQ
ANNUAL ESTIMATED QUANTITIES RELEASED AS REQUIRED AND DELIVERED FROM AUGUST 1, 2016 THROUGH JULY 31, 2017.
06/21/2016 06:30 PM UTC
ALUMINUM SIGN BLANKS, IFB NO. 8869-OQ
ANNUAL ESTIMATED QUANTITIES RELEASED AS REQUIRED AND DELIVERED FROM AUGUST 1, 2016 THROUGH JULY 31, 2017.
06/21/2016 06:30 PM UTC
BLADES: GRADER,FLOAT.PLOW, IFB No. 8859-OQ 06/21/2016 06:30 PM UTC
52734-PUTNAM DRIVE OVER WALNUT LAKE CANAL - BRIDGE FABRICATION
FABRICATION AND DELIVERY (TO THE WORK SITE) OF A TIMBER BRIDGE, TIMBER BRIDGE RAILING, TIMBER APPROACH RAILING, TIMBER CAP BEAM, AND TIMBER ABUTMENT LAGGING INCLUDING ALL NECESSARY TIMBER AND STEEL COMPONENTS (SPREADER BEAM AND CAP PLATES) AND HARDWARE REQUIRED FOR ASSEMBLY AND COMPLETION OF THE PUTNAM DRIVE OVER WALNUT LAKE CANAL BRIDGE REPLACEMENT PROJECT, WEST BLOOMFIELD TOWNSHIP, OAKLAND COUNTY, MICHIGAN.
06/21/2016 03:00 PM UTC
10059 - SNOW APPLE DRIVE
A CONTRACT FOR 4" HMA SURFACE OVER PULVERIZED BASE WITH SODDED SHOULDERS AND MINOR DRAINAGE IMPROVEMENTS ON 2,711 LINEAL FEET OR 0.51 MILES OF SNOW APPLE DRIVE, LOCATED SOUTH OF WALDON ROAD AND WEST OF SASHABAW ROAD IN INDEPENDENCE TOWNSHIP, OAKLAND COUNTY, MICHIGAN.
06/14/2016 03:00 PM UTC
311 - 320 of 366 Solicitations
1 2 28 29 30 32 34 35 36 37