General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9801PlanHolders10082026.pdf (69.8 KB)
Contract 9801 - Madison LakeWay SkyLine Improvements
2 Documents

Upcoming Solicitations

Number Deadline
9801 - Madison LakeWay - SkyLine Improvements
The Madison LakeWay – SkyLine Improvements are the culmination of a multi-year collaboration among public and private partners to create a more welcoming, accessible, and vibrant public shoreline along Lake Monona. The project will provide a green, inviting linear parkway along one-half mile of shoreline adjacent to John Nolen Drive. The project scope builds upon work completed under the John Nolen Drive Reconstruction project (WisDOT Project# 5992-11). The new SkyLine shoreline amenities include two boardwalks, a pier, pedestrian-scale site lighting, enhanced paths, seating and bicycle amenities, wayfinding signage, and extensive site landscaping. This single contract is for the construction of the Madison LakeWay – SkyLine Improvements for the Madison Parks Division.
12/17/2026 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
9782 - South Point Public Works Facility
This single contract is for the installation of a new Streets Division Operations Building and the remodeling of an existing warm storage building for Parks Division West Maintenance Operations.
09/24/2026 07:00 PM UTC
9818 - Cypress Spray Park Redevelopment
This contract consists of installation of a Splash Pad and Playground at Cypress Spray Park (902 Magnolia Ln.). The Contractor shall view the site prior to bidding to become familiar with the existing conditions. The Contractor shall work with the existing utilities to resolve conflicts during the construction process.
09/24/2026 07:00 PM UTC
9806 - 2026 Playgrounds -- Set 2
This project consists of installation of new playground equipment and/or nature play features, benches, playground safety surfacing, underdrain, asphalt paths and associated sitework at five (5) City of Madison park locations including James Madison Park, Marshall Park, Eastmorland Park, Orton Park, and Heifetz Park.
09/10/2026 07:00 PM UTC
7802 - Capital City Path Phases 5 and 6 Tree Removal
The work under this contract shall include, but is not limited to, cutting down and leaving trees within the limits provided in the plans. The limits for tree removal extend from Vondron Road to Interstate 90 along the South side of Wisconsin & Southern Railroad, covering approximately 3,700 feet.
09/10/2026 07:00 PM UTC
9668 - Mayflower Lift Station Replacement
The work under this contract shall include, but is not limited to, the removal and replacement of the existing Mayflower sanitary sewer lift station, replacement of the existing force main, replacement of gravity sanitary sewer mains and structures, installation of an emergency generator, installation of a telemetry antenna tower, installation of a new site access drive, grading of the site, and restoration of the site.
08/27/2026 07:00 PM UTC
9813 - Overture Center Garage Electrical Upgrade
Electrical system upgrades at the Overture Center Garage. Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, concrete slabs, architectural components (new electrical rooms, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement.
07/30/2026 07:00 PM UTC
8708 - Hermina Street Pedestrian-Bike Bridge Over Starkweather Creek
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk & ramps, block retaining wall, lighting conduit and base/poles, concrete bridge abutments/wingwalls, concrete bridge approaches, pre-fabricated steel truss bike/pedestrian bridge installation, pipe railing installation, channel grading, rip rap installation, ground restoration, pavement markings, erosion control installations, and work zone traffic control signs and devices.
07/30/2026 07:00 PM UTC
9733 - Willows Biobasin Repair
This contract and associated plan set describes the work necessary to install an equalizer stormwater channel between two existing bioretention basins. This includes grading, erosion control, removal of existing storm sewer, topsoiling, asphalt paving of the existing bike path. This work also includes construction of two (2) 18” RCP storm pipes, four (4) 18” apron endwalls, one (1) 4’x4’ catch basin w/ 3’ sump, and one (1) 4’x4’ storm sewer structure.
07/30/2026 07:00 PM UTC
9792 - 2026 Sport Court Resurfacings
This project consists of resurfacing existing basketball, tennis and pickleball courts including crack sealing, seal coating, and court line painting at five (5) City of Madison project sites including Richmond Hill, Walnut Grove, Westhaven Trails, Elver, and Reindahl Parks.
07/09/2026 07:00 PM UTC
9805 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI. The work includes, but is not limited to, the removal of the existing flagpole, removal and replacement of electrical systems, installation of two new flagpoles, installation of new lighting and electrical, excavation and earthwork, and the removal and replacement/patching of concrete as needed. The existing concrete planters are to be protected to minimize concrete removal and patching.
07/09/2026 07:00 PM UTC
1 - 10 of 1126 Solicitations
← Previous 1 3 4 5 6 7 8 9 … 112 113