City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9813PlanHolders07102026.pdf (89.8 KB)
Contract 9813 - Overture Center Garage Electrical
2 Documents

Upcoming Solicitations

Number Deadline
9813 - Overture Center Garage Electrical Upgrade
Electrical system upgrades at the Overture Center Garage. Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, concrete slabs, architectural components (new electrical rooms, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement.
07/30/2026 07:00 PM UTC
8708 - Hermina Street Pedestrian-Bike Bridge Over Starkweather Creek
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk & ramps, block retaining wall, lighting conduit and base/poles, concrete bridge abutments/wingwalls, concrete bridge approaches, pre-fabricated steel truss bike/pedestrian bridge installation, pipe railing installation, channel grading, rip rap installation, ground restoration, pavement markings, erosion control installations, and work zone traffic control signs and devices.
07/30/2026 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
9792 - 2026 Sport Court Resurfacings
This project consists of resurfacing existing basketball, tennis and pickleball courts including crack sealing, seal coating, and court line painting at five (5) City of Madison project sites including Richmond Hill, Walnut Grove, Westhaven Trails, Elver, and Reindahl Parks.
07/09/2026 07:00 PM UTC
9805 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI. The work includes, but is not limited to, the removal of the existing flagpole, removal and replacement of electrical systems, installation of two new flagpoles, installation of new lighting and electrical, excavation and earthwork, and the removal and replacement/patching of concrete as needed. The existing concrete planters are to be protected to minimize concrete removal and patching.
07/09/2026 07:00 PM UTC
9588 - Wester Badger Mill Greenway Improvements
This contract and associated plan set describes the work necessary to remove existing sediment deposition, grading, erosion control, remove, repair, and install new storm sewer within the existing greenway located at the City of Madison West Badger Mill Greenway in Madison, Wisconsin. This includes excavating, loading, hauling and disposal of approximately 5,300 cubic yards of soil. This work also includes construction of one (1) 6’x6’ catch basin w/sump, (1) 4’ SAS, storm sewer pipe, topsoiling and erosion matting, native seeding, planting and ecological restoration.
06/25/2026 07:00 PM UTC
9807 - Fordem Avenue - First Street Relief Sanitary Sewer
Work includes, but is not limited to, replacement of sanitary sewer main, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, base course, asphalt pavement, and pavement marking.
06/25/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
9795 - James Madison Park Retaining Wall Repair
This project will replace a failing concrete retaining wall in James Madison Park. This concrete wall supports the driveway to the underground parking garage serving the Lincoln School Apartments. The project uses a hybrid approach to replace a portion of the wall in kind then regrade a portion of the hillside within the park to support the driveway without a need for a retaining wall.
06/11/2026 07:00 PM UTC
8842 - Southwest Commuter Path & West Washington Avenue Traffic Signal
The work under this contract shall include but not be limited to removing existing Rectangular Rapid Flashing Beacons, installing new traffic signal bases, conduit, removing concrete sidewalk and ramps, and installing new sidewalks and ramps.
06/11/2026 07:00 PM UTC
9758 - Milwaukee Street & Sprecher Road Traffic Signal Assessment District
The work under this contract shall include but not be limited to removing and salvaging existing arms, poles, breakaway bases, and flashing red light devices; installing new traffic signal bases, conduit, and pullboxes. The project limits for the work at the intersection of Sprecher Road & Milwaukee Street are approximately 330-feet on each approach of the intersection.
06/11/2026 07:00 PM UTC
7431 - Cannonball Path Phase 6
The work under this contract shall include but is not limited to replacement and upgrade of sanitary sewer and laterals, storm sewer pipes and structures, as well as the installation and replacement of concrete sidewalk, concrete curb & gutter, concrete driveway aprons, concrete pavement, asphalt driveways, asphalt pavement, roadway base, path and street lighting, fiber conduit, pavement markings, bike-pedestrian bridge structure, and soil restoration.
06/11/2026 07:00 PM UTC
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC