General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
04/02/2026 07:00 PM UTC
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
04/02/2026 07:00 PM UTC
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex. The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
04/02/2026 07:00 PM UTC
9757 - Imagination Center Fiber Connection
A new fiber connection between an existing splice point on corner of E Washington Ave and Thierer Rd, and the newly constructed Imagination Center at Reindahl Park facility at 1818 Portage Road. The new duct will be a single 3” duct with a single 48-strand fiber optic cable.
04/02/2026 07:00 PM UTC
9751 - 2026 Parking Garage Maintenance
This work covers repairs at the Capitol Square North (CSN), State Street Capitol (SSCo), South Livingston Street (SLS), and Wilson Street Garage (WSG) parking ramps in Madison, Wisconsin. Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
04/02/2026 07:00 PM UTC
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
03/19/2026 07:00 PM UTC
9712 - Yahara Hills Golf Course Well Transfer Pipe
The objective of these specifications is to reroute the existing irrigation well to irrigation pond #3. Routing of the pipe shall avoid existing golf irrigation system. This project consists of irrigation mainline installation, irrigation shut off valve installation, and site restoration.
03/19/2026 07:00 PM UTC
9730 - Manitou Way Storm Box Replacement
The work under this contract shall include, but not be limited to, replacement of a portion of the storm sewer box culvert main and endwall, excavation, terrace restoration, and removal and rebuilding of a historical stone wall.
03/19/2026 07:00 PM UTC
8845 - Campus Drive at Babcock Drive Railroad Crossing Improvements
Work includes, but is not limited to, base preparation, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, electrical, traffic signals, lighting, pavement marking, signs, fencing, landscaping, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
03/19/2026 07:00 PM UTC
8810 - Midvale Boulevard Pavement Patching
The work under this contract shall include, but not be limited to, asphalt pavement patching, pavement markings, tubular bollard curb extensions, and rectangular rapid flashing beacon installations.
03/19/2026 07:00 PM UTC
1 - 10 of 1087 Solicitations
← Previous 1 3 4 5 6 7 8 9 108 109