General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
9546 - Madison Water Utility Olin Ave. Administrative Building Roof Replacement
The work for this project includes replacing the existing 17,000 sq ft. (approximate, contractor to verify area) of shingled roof with a metal panel roofing system.
07/11/2024 07:00 PM UTC
8626 - Olin-Turville Court and E. Lakeside Street Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of sanitary sewer main, culverts, earthwork, base preparation, curb and gutter, asphalt pavement, sidewalk, shared-use path, curb ramps, pavement marking, and restoration.
07/11/2024 07:00 PM UTC
9502 - Warner Park Community Recreation Center Expansion
The work includes removal of some existing exterior walls, excavation for new footings and foundations, construction of a building addition, which includes a gymnasium, with new exterior walls, roofs and interior slabs. Installation of new mechanical, electrical, and plumbing systems, and interior renovations to create new restrooms and a comfort room. Site work including geothermal, landscaping, and parking lot modifications.
06/27/2024 07:00 PM UTC
9372 - Prairie Hills Detention Basin Improvements
The work includes but is not limited to removing 100 cu. yards of existing sediment buildup from the bottom of the Prairie Hills Detention Basin West Cell under an existing maintenance permit, constructing a maintenance access drive off Dorchester Way, constructing three 6’x6’ Storm Access Structures with 6’ sumps connected to existing stormsewer, removal of two inlets, clearing and grubbing, grading and street and site restoration.
06/27/2024 07:00 PM UTC
9521 2024 Playground Improvements
This project consists of installation of new playground equipment and/or nature play features, benches, playground safety surfacing, underdrain, asphalt paths and associated sitework at four (4) City of Madison park locations including Garner Park, Manchester Park, Meadowood Park, and Sherwood Forest Park.
06/27/2024 07:00 PM UTC
8744 - Atticus Way Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of storm sewer structures and pipes, base preparation, curb and gutter, asphalt pavement, sidewalk, street lighting, pavement marking, and signing.
06/27/2024 07:00 PM UTC
9522 - 20 Is Plenty
The work includes providing, hauling, and installing 24” x 30” “Speed Limit 20” signs on residential streets throughout the City of Madison as shown on the provided plan sheets and per the provided detail drawings and bid items specifications.
06/13/2024 07:00 PM UTC
9527 - Madison Water Utility Olin Ave. Administrative Building Roof Replacement
The work for this project includes replacing the existing 17,000 sq ft. (approximate, contractor to verify area) of shingled roof with a metal panel roofing system.
06/13/2024 07:00 PM UTC
8635 - Knutson Drive and Green Avenue Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, installation of storm sewer main and storm sewer structures, adjustment of sanitary sewer man structures, adjustment of water valves, excavation, base course preparation, bridge rehabilitation, curb and gutter, driveway aprons, sidewalk installation, green infrastructure, colored concrete pavement, asphalt pavement, pavement marking and signing.
06/13/2024 07:00 PM UTC
9358 - Bartillon Shelter
The work includes, but is not limited to, general site and building construction including civil, landscape, architectural, mechanical, electrical, plumbing, fire suppression, fire alarm, technology, and site utilities.
05/23/2024 07:00 PM UTC
91 - 100 of 1087 Solicitations
1 2 6 7 8 10 12 13 14 108 109