| 9813PlanHolders07102026.pdf (89.8 KB) |
Contract 9813 - Overture Center Garage Electrical
| |
| Number | Deadline |
|---|---|
|
9813 - Overture Center Garage Electrical Upgrade
Electrical system upgrades at the Overture Center Garage. Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, concrete slabs, architectural components (new electrical rooms, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement.
| 07/30/2026 07:00 PM UTC |
|
8708 - Hermina Street Pedestrian-Bike Bridge Over Starkweather Creek
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk & ramps, block retaining wall, lighting conduit and base/poles, concrete bridge abutments/wingwalls, concrete bridge approaches, pre-fabricated steel truss bike/pedestrian bridge installation, pipe railing installation, channel grading, rip rap installation, ground restoration, pavement markings, erosion control installations, and work zone traffic control signs and devices.
| 07/30/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
8796 - Repairing and Sealing Pavement Cracks - Major Streets 2025
The work under this contract consists of routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
| 03/20/2025 07:00 PM UTC |
|
8797 - Repairing and Sealing Pavement Cracks - Local Streets 2025
The work under this contract consists of routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
| 03/20/2025 07:00 PM UTC |
|
9318 - Olin Waste Transfer Drop-Off
This project is to provide a dedicated Public Waste and Recycling Drop-off site at the existing Olin Waste Transfer site. Currently the temporary site is co-mingled with large city vehicles and the drop-off site runs limited hours for safety reasons. This project will install a separate public access road off of Quann-Olin Pkwy. The internal circulation of the drop-off area will keep public and city vehicle traffic separated.
| 03/13/2025 07:00 PM UTC |
|
8811 - Bridge Repairs - 2025
This project consists of bridge repairs for the Park Street pedestrian bridge (P-13-760), Commercial Avenue bridge, USH-51 pedestrian bridge (B-13-341), and the Campus Drive Bridge (B-13-266) over Highland Avenue.
| 03/13/2025 07:00 PM UTC |
|
8791 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 20) - 2025
The work includes horizontally sawcutting/grinding sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
| 02/27/2025 08:00 PM UTC |
|
8788 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 10) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the contractor), and associated work.
| 02/27/2025 08:00 PM UTC |
|
9551 - Rennebohm Park Sprayground
This contract consists of installation of a Sprayground at Rennebohm Park (115 N. Eau Claire Ave.). Work to include:
-Water service lateral and associated pavement patching
-Concrete paving (colored and standard)
-Plumbing from command center to spray features
-Spray feature installation
-Shade structure installation
-Site earthwork
-Site restoration
| 02/13/2025 08:00 PM UTC |
|
9529 - Parks Sun Shelter Installations
This contract consists of installation of one (1) new prefabricated park sun shelter, concrete footings, concrete slab base and associated sitework at (3) park locations:
-Kestrel Park (9702 Grey Kestrel Dr, Verona, WI 53593)
-North Star Park (502 North Star Dr, Madison, WI 53718)
-Sycamore Park (830 Jana Ln, Madison, WI 53704)
| 02/13/2025 08:00 PM UTC |
|
8766 - N Franklin and Lynn Terrace Assessment District - 2025
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, reconnection of water services, and replacement and installation of storm sewer pipes and structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
| 02/13/2025 08:00 PM UTC |
|
8790 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 10) - 2025
The work includes horizontal sawcutting/grinding repair work primarily throughout the 10th Aldermanic District.
| 02/13/2025 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.