General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9813PlanHolders07102026.pdf (89.8 KB)
Contract 9813 - Overture Center Garage Electrical
2 Documents

Upcoming Solicitations

Number Deadline
9813 - Overture Center Garage Electrical Upgrade
Electrical system upgrades at the Overture Center Garage. Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, concrete slabs, architectural components (new electrical rooms, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement.
07/30/2026 07:00 PM UTC
8708 - Hermina Street Pedestrian-Bike Bridge Over Starkweather Creek
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk & ramps, block retaining wall, lighting conduit and base/poles, concrete bridge abutments/wingwalls, concrete bridge approaches, pre-fabricated steel truss bike/pedestrian bridge installation, pipe railing installation, channel grading, rip rap installation, ground restoration, pavement markings, erosion control installations, and work zone traffic control signs and devices.
07/30/2026 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
8796 - Repairing and Sealing Pavement Cracks - Major Streets 2025
The work under this contract consists of routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
03/20/2025 07:00 PM UTC
8797 - Repairing and Sealing Pavement Cracks - Local Streets 2025
The work under this contract consists of routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
03/20/2025 07:00 PM UTC
9318 - Olin Waste Transfer Drop-Off
This project is to provide a dedicated Public Waste and Recycling Drop-off site at the existing Olin Waste Transfer site. Currently the temporary site is co-mingled with large city vehicles and the drop-off site runs limited hours for safety reasons. This project will install a separate public access road off of Quann-Olin Pkwy. The internal circulation of the drop-off area will keep public and city vehicle traffic separated.
03/13/2025 07:00 PM UTC
8811 - Bridge Repairs - 2025
This project consists of bridge repairs for the Park Street pedestrian bridge (P-13-760), Commercial Avenue bridge, USH-51 pedestrian bridge (B-13-341), and the Campus Drive Bridge (B-13-266) over Highland Avenue.
03/13/2025 07:00 PM UTC
8791 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 20) - 2025
The work includes horizontally sawcutting/grinding sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
02/27/2025 08:00 PM UTC
8788 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 10) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the contractor), and associated work.
02/27/2025 08:00 PM UTC
9551 - Rennebohm Park Sprayground
This contract consists of installation of a Sprayground at Rennebohm Park (115 N. Eau Claire Ave.). Work to include: -Water service lateral and associated pavement patching -Concrete paving (colored and standard) -Plumbing from command center to spray features -Spray feature installation -Shade structure installation -Site earthwork -Site restoration
02/13/2025 08:00 PM UTC
9529 - Parks Sun Shelter Installations
This contract consists of installation of one (1) new prefabricated park sun shelter, concrete footings, concrete slab base and associated sitework at (3) park locations: -Kestrel Park (9702 Grey Kestrel Dr, Verona, WI 53593) -North Star Park (502 North Star Dr, Madison, WI 53718) -Sycamore Park (830 Jana Ln, Madison, WI 53704)
02/13/2025 08:00 PM UTC
8766 - N Franklin and Lynn Terrace Assessment District - 2025
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, reconnection of water services, and replacement and installation of storm sewer pipes and structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
02/13/2025 08:00 PM UTC
8790 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 10) - 2025
The work includes horizontal sawcutting/grinding repair work primarily throughout the 10th Aldermanic District.
02/13/2025 08:00 PM UTC
91 - 100 of 1118 Solicitations
1 2 6 7 8 10 12 13 14 111 112