General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
7240 - Chip Sealing 2014 - West
Chip Sealing 2014 - West
02/21/2014 07:00 PM UTC
7215 - Tennis/Basketball Court Resurfacing - 2014
Tennis/Basketball Court Resurfacing - 2014
02/10/2014 07:00 PM UTC
7211 - W Badger Rd & Lancaster Dr Water Main Replacment
7211 - W Badger Rd & Lancaster Dr Water Main Replacement
02/07/2014 07:00 PM UTC
7176 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work - District 11
Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work - District 11
02/07/2014 07:00 PM UTC
7173-Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (District 11) by the Common Council
7173-Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (District 11) by the Common Council
02/07/2014 07:00 PM UTC
7220 - Resurfacing 2014 - Asphalt Base Patching and Base Patch Grinding
Resurfacing 2014 - Asphalt Base Patching and Base Patch Grinding
02/07/2014 07:00 PM UTC
7223 - Goodman Maintenance Facility Topsoil Shed
Goodman Maintenance Facility Topsoil Shed
01/24/2014 07:00 PM UTC
7218 - Resurfacing 2014 - Curb & Gutter and Castings
7218 - Resurfacing 2014 - Curb & Gutter and Castings
01/24/2014 07:00 PM UTC
7219 - Resurfacing 2014 - Asphalt Pavement Pulverizing & Paving
Resurfacing 2014 - Asphalt Pavement Pulverizing & Paving
01/24/2014 07:00 PM UTC
7217 - King Street, East Main Street and South Pinckney Street Reconstruction Assessment District-2014
King Street, East Main Street and South Pinckney Street Reconstruction Assessment District-2014
01/24/2014 07:00 PM UTC
1001 - 1010 of 1087 Solicitations
1 2 97 98 99 101 103 104 105 108 109