General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
#7202 - Meadowridge Branch Library/Meadowood Neighborhood Center Remodeling
Meadowridge Branch Library/Meadowood Neighborhood Center Remodeling
01/10/2014 07:00 PM UTC
6988 - John Nolen Drive Bridge Bike Path Railing Replacement and Bike Path Bridge Approach Reconstruction, 3rd Bridge Outbound
John Nolen Drive Bridge Bike Path Railing Replacement and Bike Path Bridge Approach Reconstruction, 3rd Bridge Outbound
01/10/2014 07:00 PM UTC
#7203 - CIPP Rehab of Sanitary & Storm Sewers 2013 - East Side
CIPP Rehab of Sanitary & Storm Sewers 2013 - East Side
12/06/2013 07:00 PM UTC
Contract Number 7107, Unit Well 26 Generator Addition
Unit Well 26 Generator Addition
11/08/2013 07:00 PM UTC
Contract 7167 - Boulevard Landscaping-2013
Boulevard Landscaping-2013
11/08/2013 07:00 PM UTC
7191
Monona Terrace Carpet Replacement
10/04/2013 06:00 PM UTC
7185
Well 24 Roof Repair
10/04/2013 06:00 PM UTC
7194
Owen Park Drainage Channel Stabilization - 2013
10/04/2013 06:00 PM UTC
7172
Traffic Engineering Electrical Upgrades-2013
09/20/2013 06:00 PM UTC
7003
University Avenue Landscaping
09/20/2013 06:00 PM UTC
1011 - 1020 of 1087 Solicitations
1 2 98 99 100 102 104 105 106 107 108 109