General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9801PlanHolders10082026.pdf (69.8 KB)
Contract 9801 - Madison LakeWay SkyLine Improvements
2 Documents

Upcoming Solicitations

Number Deadline
9801 - Madison LakeWay - SkyLine Improvements
The Madison LakeWay – SkyLine Improvements are the culmination of a multi-year collaboration among public and private partners to create a more welcoming, accessible, and vibrant public shoreline along Lake Monona. The project will provide a green, inviting linear parkway along one-half mile of shoreline adjacent to John Nolen Drive. The project scope builds upon work completed under the John Nolen Drive Reconstruction project (WisDOT Project# 5992-11). The new SkyLine shoreline amenities include two boardwalks, a pier, pedestrian-scale site lighting, enhanced paths, seating and bicycle amenities, wayfinding signage, and extensive site landscaping. This single contract is for the construction of the Madison LakeWay – SkyLine Improvements for the Madison Parks Division.
12/17/2026 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
9318 - Olin Waste Transfer Drop-Off
This project is to provide a dedicated Public Waste and Recycling Drop-off site at the existing Olin Waste Transfer site. Currently the temporary site is co-mingled with large city vehicles and the drop-off site runs limited hours for safety reasons. This project will install a separate public access road off of Quann-Olin Pkwy. The internal circulation of the drop-off area will keep public and city vehicle traffic separated.
03/13/2025 07:00 PM UTC
8811 - Bridge Repairs - 2025
This project consists of bridge repairs for the Park Street pedestrian bridge (P-13-760), Commercial Avenue bridge, USH-51 pedestrian bridge (B-13-341), and the Campus Drive Bridge (B-13-266) over Highland Avenue.
03/13/2025 07:00 PM UTC
8791 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 20) - 2025
The work includes horizontally sawcutting/grinding sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
02/27/2025 08:00 PM UTC
8788 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 10) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the contractor), and associated work.
02/27/2025 08:00 PM UTC
9551 - Rennebohm Park Sprayground
This contract consists of installation of a Sprayground at Rennebohm Park (115 N. Eau Claire Ave.). Work to include: -Water service lateral and associated pavement patching -Concrete paving (colored and standard) -Plumbing from command center to spray features -Spray feature installation -Shade structure installation -Site earthwork -Site restoration
02/13/2025 08:00 PM UTC
9529 - Parks Sun Shelter Installations
This contract consists of installation of one (1) new prefabricated park sun shelter, concrete footings, concrete slab base and associated sitework at (3) park locations: -Kestrel Park (9702 Grey Kestrel Dr, Verona, WI 53593) -North Star Park (502 North Star Dr, Madison, WI 53718) -Sycamore Park (830 Jana Ln, Madison, WI 53704)
02/13/2025 08:00 PM UTC
8766 - N Franklin and Lynn Terrace Assessment District - 2025
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, reconnection of water services, and replacement and installation of storm sewer pipes and structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
02/13/2025 08:00 PM UTC
8790 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 10) - 2025
The work includes horizontal sawcutting/grinding repair work primarily throughout the 10th Aldermanic District.
02/13/2025 08:00 PM UTC
9621 - 2025 Semi-Permanent Epoxy Pavement Markings
Furnishing and application or removal of epoxy pavement markings at locations throughout the City of Madison and per City of Madison Standard Pavement Marking Details or as shown on the plans provided by the City of Madison.
02/13/2025 08:00 PM UTC
8789 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 20) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the contractor), and associated work
02/13/2025 08:00 PM UTC
101 - 110 of 1126 Solicitations
1 2 … 7 8 9 11 13 14 15 … 112 113