City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 9726PlanHolders04032026.pdf (97.4 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9766PlanHolders04032026.pdf (88.9 KB) |
Contract 9766 - Metro Transit Kennedy Bus Charger
| |
| Number | Deadline |
|---|---|
|
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 04/23/2026 07:00 PM UTC |
|
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
| 04/23/2026 07:00 PM UTC |
|
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave.
The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
| 04/23/2026 07:00 PM UTC |
|
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
| 04/23/2026 07:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 05/21/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
8745 - Stevens Street Assessment District - 2024
The work includes replacement of sanitary sewer main, replacement of sanitary laterals, and replacement and installation of storm sewer pipes and structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
| 05/23/2024 07:00 PM UTC |
|
8709 Doncaster Beverly Danbury Reconstruction Assessment District - 2024
The work includes replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, replacement of storm sewer main and storm sewer structures, terrace rain gardens, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, and asphalt pavement.
| 05/23/2024 07:00 PM UTC |
|
9487 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2024
The work includes the trenchless rehabilitation of approximately 14,973 linear feet of sanitary sewer pipelines ranging in size from 8” to 15” diameter using an Ultraviolet light cure CIPP system. This contract shall also include the trenchless rehabilitation of approximately 860 linear feet of corrugated metal pipe (CMP) storm sewer pipelines with sizes of 21” diameter circular and 18”x24” elliptical using a thermal cure CIPP system.
| 05/09/2024 07:00 PM UTC |
|
8740 - Hermina St & Union St Reconstruction Assessment District
The work includes the removal and replacement of the following: sanitary sewer main and laterals, storm sewer pipes and structures, asphalt pavement and roadway gravel base, concrete curb & gutter, concrete driveway aprons, and concrete sidewalk as needed.
| 05/09/2024 07:00 PM UTC |
|
9497 - Streets West Facility HVAC and Lighting Upgrade
The work includes replacement of garage ventilation system with new make-up air unit and exhaust fan system. Lighting will be replaced in all garage and shop areas.
| 04/25/2024 07:00 PM UTC |
|
9525 - 2024 Sport Court Resurfacing
The work includes resurfacing and/or power washing existing basketball and tennis courts including crack sealing, seal coating, and court line painting at three (3) City of Madison project sites including Goodman, Huegel and Quann Parks.
| 04/25/2024 07:00 PM UTC |
|
9526 - 2024 Rennebohm Park East Tennis Courts
The work includes installing asphalt pavement, including base course for asphalt path and pickleball/tennis courts, installing footings/bases and electrical supply for the court lighting system, installing fencing, gates, net posts, net tie downs and sport court finishing and striping to construct a three (3) court (pickleball and tennis) complex at Rennebohm Park.
| 04/25/2024 07:00 PM UTC |
|
8317 - Blue Harvest Lane, Feather Edge Drive, & Soaring Sky Run Assessment District - 2023
The work under this contract shall include, but is not limited to, installation sanitary sewer main, laterals, water main and services, storm sewer structures and pipes, culverts, earthwork, base preparation, curb and gutter, asphalt pavement, sidewalk, shared-use path, driveway aprons, pavement marking, and restoration.
| 04/25/2024 07:00 PM UTC |
|
8695 - Safe Streets Madison 2024
The work includes installing traffic calming measures, pedestrian improvements and intersection updates at various locations in the City. This generally includes the installation of traffic calming islands, speed humps, sidewalk, curb and gutter, and pavement markings.
| 04/11/2024 07:00 PM UTC |
|
8735 - E. Wilson St. and E. Doty St. Reconstruction Assessment District - 2023
The work includes replacement and installation of sanitary sewer pipes and structures, water main, and storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of new bicycle facilities, underground terrace and sidewalk support systems, pavement marking, and signing.
| 04/04/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.