Upcoming Solicitations

Number Deadline
9638 - Country Grove Singletrack Trail Improvements 2025
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
07/24/2025 07:00 PM UTC
8739 - Tancho Dr Bike Path & Northeast Regional Pond Repair
The work under this contract shall include, but is not limited to, tree removal, storm sewer pipes and structures, base preparation, curb and gutter, sidewalk spot replacement, asphalt pavement, shared-use path, improvement on pedestrian crossings, pavement marking, signing, and path lighting.
07/24/2025 07:00 PM UTC
9670 - MADISON MUNICIPAL BUILDING FLAGPOLE REPLACEMENT
This contract is for the removal of the existing flagpole and the replacement/installation of two new flagpoles at the entrance of the Madison Municipal Building located at 215 Martin Luther King Jr Blvd. This work includes, but is not limited to, general site and earthwork, general building construction, electrical, and concrete work.
08/21/2025 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
9495 - 2024 Semi-Permanent Epoxy Pavement Markings
Furnishing and application or removal of epoxy pavement markings at locations throughout the City of Madison and per City of Madison Standard Pavement Marking Details or as shown on the plans provided by the City of Madison.
02/08/2024 08:00 PM UTC
8755 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 11) - 2024
The work includes horizontally sawcut/grinding sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
02/08/2024 08:00 PM UTC
8754 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 19) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the City of Madison), and associated work.
02/08/2024 08:00 PM UTC
9503 - Sycamore Singletrack Trail Improvements 2024
The work includes constructing up to 6538 linear feet of off-road, natural surface, bike optimized, single track trail in Sycamore Park
02/08/2024 08:00 PM UTC
9389 - Sycamore Singletrack Trail Improvements 2024
The work includes constructing up to 6538 linear feet of off-road, natural surface, bike optimized, single track trail in Sycamore Park. The trail consists of natural material constructed using a “lift and tilt” method to create a sustainable surface. A portion of the trail will be an all-weather feature trail using a chip seal product to allow all weather use. Technical trail features are added to both trail type to enhance riding experience. These features are constructed of native stone and imported stone where needed.
01/11/2024 08:00 PM UTC
9329 - Fire Station 14 Training Site Phase 1
The work includes the construction of private roadways to be located at the Madison Fire Station No. 14 Training Site, 3101 Dairy Drive. The private roadways, including water hydrants, paving, curb/gutter and stormwater management will be used by Madison Fire Department for operator training and access to future training apparatus.
01/11/2024 08:00 PM UTC
9390 - Lower Badger Mill Ponds Restoration
The work includes ecological restoration, including tree and shrub planting, invasive species removals, and native seeding at a City of Madison owned property.
12/21/2023 08:00 PM UTC
9289 - Unit Well 19 Treatment System Addition
A new addition to the existing Unit Well 19 building to house treatment equipment for removal of iron, manganese and radium. Site work includes grading, landscaping as well as on-site utility work.
12/14/2023 08:00 PM UTC
8693 - Sheboygan Ave and N. Segoe Rd Resurfacing with Utilities
This work includes replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, concrete medians, driveway aprons, sidewalk replacement, asphalt pavement, traffic signals, pavement marking and signing.
12/14/2023 08:00 PM UTC
8762 - Hammersley Road Resurfacing Assessment District - 2024
The work shall include, but is not limited to excavation, clearing & grubbing, replacement of sanitary sewer main & laterals, water main & services, storm sewer, asphalt pavement, roadway base course, curb & gutter, driveway aprons, sidewalk and ramps, ground restoration, and pavement markings.
11/30/2023 08:00 PM UTC
101 - 110 of 1053 Solicitations