General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9801PlanHolders10082026.pdf (69.8 KB)
Contract 9801 - Madison LakeWay SkyLine Improvements
2 Documents

Upcoming Solicitations

Number Deadline
9801 - Madison LakeWay - SkyLine Improvements
The Madison LakeWay – SkyLine Improvements are the culmination of a multi-year collaboration among public and private partners to create a more welcoming, accessible, and vibrant public shoreline along Lake Monona. The project will provide a green, inviting linear parkway along one-half mile of shoreline adjacent to John Nolen Drive. The project scope builds upon work completed under the John Nolen Drive Reconstruction project (WisDOT Project# 5992-11). The new SkyLine shoreline amenities include two boardwalks, a pier, pedestrian-scale site lighting, enhanced paths, seating and bicycle amenities, wayfinding signage, and extensive site landscaping. This single contract is for the construction of the Madison LakeWay – SkyLine Improvements for the Madison Parks Division.
12/17/2026 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
9616 - Truax Apartments PV - Roofing Alterations
Work includes installation of roof anchors for solar racking attachment.
01/30/2025 08:00 PM UTC
North Shore Drive Path and East Madison Bikeways: Safe Streets
The work under this contract shall include but is not limited storm sewer pipe and structure installation, to excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, and driveway aprons, lighting conduit and bases/poles, pavement markings, ground restoration, erosion control installation and removal, and work zone traffic control signs and devices.
01/30/2025 08:00 PM UTC
9550 - Yahara Hills Golf Course Pump Station and Irrigation Improvements
The work for this contract is to decommission the existing irrigation pump station, remove the pump motors, and cover the existing wet well. The contractor will provide and install a complete Watertronics irrigation pump station, including the equipment pad, wet well, intake flume/screen, and a prefabricated pump station enclosure powered by the existing transformer. Additionally, the irrigation system will be adjusted to align with revised golf course boundaries, with components cut, capped, sealed, and added/adjusted as indicated on the drawings. The contractor is also responsible for surveying all property boundaries.
01/16/2025 08:00 PM UTC
9583 - CCB Remodel - DCR 104 & 108A
The work shall include but not be limited to all of the following: • Demolition and construction. • Installation of finish materials. • Installation of electrical, lighting and heating equipment and materials. • Installation of built-in cabinetry. • Cooperation with other contractors doing work for the City of Madison or Dane County within the contract work spaces.
01/16/2025 08:00 PM UTC
8759 - Starker Avenue Resurfacing Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, water main and services, and replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter replacement, driveway aprons replacement, sidewalk replacement, asphalt pavement, pavement marking and signing.
11/21/2024 08:00 PM UTC
9535 - CIPP UV Lining Rehabilitation of Sewers Phase 2 - 2024
The work includes the trenchless rehabilitation of approximately 5,382 linear feet of sanitary sewer pipelines ranging in size from 8” to 15” diameter using an Ultraviolet light cure CIPP system.
11/21/2024 08:00 PM UTC
9517 - Pheasant Branch Greenway Enhancement
Work shall include, but is not limited to; clearing & grubbing, tree removal, channel excavation and riprap placement, base course, installation of box culvert crossings, installation of storm pipe and structures, installation of water main and appurtenances, installation of sanitary sewer main and structures, installation of pedestrian bridge, grading, road reconstruction, pavement marking and restoration including the removal of invasive species, seeding and planting operations, and maintenance of plantings. This project has received FEMA funding and is subject to all federal, state and local regulations and requirements as provided in these contract documents.
11/14/2024 08:00 PM UTC
9605 - Prairie Hills Detention Basin Improvements
The work includes but is not limited to removing the existing sediment buildup from the bottom of the Prairie Hills Detention Basin and grading the pond closer to original design elevations. Along with removing sediment, constructing a maintenance access drive off of Dorchester Way, constructing four 6’x6’ Storm Access Structures with 6’ sumps connected to existing stormsewer, removal of two inlets, D-2 clearing and grubbing, grading, street restoration and site restoration.
11/14/2024 08:00 PM UTC
9572 - N Lake Street Boat Ramp
This contract and associated plan set describes the work necessary to install a new 26’x20’ concrete slab at the existing boat launch located within the right-of-way of North Lake Street located in Madison, Wisconsin. This works includes but is not limited to excavation cut, placing concrete, and lake control.
11/07/2024 08:00 PM UTC
9582 - LED Street Lights
This project generally consists of removal and replacement of old streetlight fixtures with new LED fixtures Citywide.
10/17/2024 07:00 PM UTC
111 - 120 of 1126 Solicitations
1 2 … 8 9 10 12 14 15 16 … 112 113