General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8739PlanHolders07172025.pdf (109 KB)
Contract 8739 - Tancho Bike & Northeast Pond
9638PlanHolders07172025.pdf (90.5 KB)
Contract 9638 - Country Grove Singletrack
9670PlanHolders06172025.pdf (86.2 KB)
Contract 9670 - MMB Flagpole
4 Documents

Upcoming Solicitations

Number Deadline
9638 - Country Grove Singletrack Trail Improvements 2025
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
07/24/2025 07:00 PM UTC
8739 - Tancho Dr Bike Path & Northeast Regional Pond Repair
The work under this contract shall include, but is not limited to, tree removal, storm sewer pipes and structures, base preparation, curb and gutter, sidewalk spot replacement, asphalt pavement, shared-use path, improvement on pedestrian crossings, pavement marking, signing, and path lighting.
07/24/2025 07:00 PM UTC
9670 - MADISON MUNICIPAL BUILDING FLAGPOLE REPLACEMENT
This contract is for the removal of the existing flagpole and the replacement/installation of two new flagpoles at the entrance of the Madison Municipal Building located at 215 Martin Luther King Jr Blvd. This work includes, but is not limited to, general site and earthwork, general building construction, electrical, and concrete work.
08/21/2025 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
8711 - HARVEY STREET AND SCHMITT PLACE ASSESSMENT DISTRICT - 2023
Work includes, but is not limited to, replacing sanitary sewer, replacing water main, replacing and/or improving storm sewer, installation of concrete sidewalk and curb and gutter, replacement of asphalt pavement, and replacement of driveway aprons.
11/30/2023 08:00 PM UTC
9361 - STATE STREET CAMPUS GARAGE MIXED-USE PROJECT
A new public and private development opportunity that includes the demolition and replacement of the existing State Street Campus Garage (SSCG) at 415 North Lake Street. The proposed building project will be completed in two construction phases. Phase 1 –the Public Works project titled State Street Campus Garage Mixed-Use Project - includes demolition of the existing SSCG and proposed construction will include an intercity bus terminal, public parking structure, and “gray box” spaces for final build out by a private Developer (i.e. Mortenson Development, Inc.). Phase 2 –constructed by the Developer and not included in the scope of this contract- will include private housing components built on top and within the Phase 1 construction.
11/09/2023 08:00 PM UTC
9334 - Robin Greenway Restoration
Ecological restoration, including tree removals, tree and shrub planting, invasive species removals, and native seeding at a City of Madison owned property.
11/09/2023 08:00 PM UTC
9377 University Avenue Box Repair - 2023
Work includes repairing the walls, roof, floor and utility connections. The project will take place within a 15'x6' and 12x6' reinforced concrete box culvert within University Ave. The project limits are University Ave., from Grand Ave. to Schmidt Pl.
11/09/2023 08:00 PM UTC
9304 - Northport Drive - School Road Traffic Signal Assessment District 2023
Removal and construction of signal conduit, concrete bases pavement markings, and sidewalks at the intersection of Northport Drive & School Road in the City of Madison.
11/09/2023 08:00 PM UTC
9086 - Metro Transit Hanson Rd. Bus Facility Remodel
Remodel existing buildings, including site improvements, for the Metro Transit Hanson Road Satellite Bus Facility, located at 3829 and 3901 Hanson Road in Madison, WI. This remodel will provide bus storage and bus maintenance for 60ft electric articulated buses for the Metro Bus Rapid Transit (BRT) system. The facility was previously a FedEx distribution center.
10/26/2023 07:00 PM UTC
9108 - Parkside Drive Sanitary Sewer Replacement
Cleaning, grubbing, replacement of sanitary sewer, installation of a gravel access path for maintenance equipment, pipe culvert removal, and restoration with topsoil, seed and matting.
10/05/2023 07:00 PM UTC
9336 - Felland Reservoir Booster Pump Install Milky Way Reservoir Valve Install
This project is located on the east side of Madison and will consist of installing a booster pump and associated piping in the existing control building at Felland Road reservoir.
09/21/2023 07:00 PM UTC
8710 - S. Owen Drive Assessment District - 2023
Replacement of sanitary sewer main and laterals, replacement of storm sewer structures and pipes, excavation, base preparation, asphalt pavement, curb and gutter, sidewalk, driveway aprons, terrace rain gardens, and pavement markings.
09/21/2023 07:00 PM UTC
9365 - Railroad Arch Culvert Repair at Southwest Bike Path
Reconstructing historic stone retaining wall located at 600 Glenway Street in Madison, WI. The Contractor or Contractor's subcontractor must be prequalifed in Historic Masonry prior to construction.
09/21/2023 07:00 PM UTC
111 - 120 of 1053 Solicitations
1 2 8 9 10 12 14 15 16 105 106