Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9813PlanHolders07102026.pdf (89.8 KB)
Contract 9813 - Overture Center Garage Electrical
2 Documents

Upcoming Solicitations

Number Deadline
9813 - Overture Center Garage Electrical Upgrade
Electrical system upgrades at the Overture Center Garage. Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, concrete slabs, architectural components (new electrical rooms, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement.
07/30/2026 07:00 PM UTC
8708 - Hermina Street Pedestrian-Bike Bridge Over Starkweather Creek
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk & ramps, block retaining wall, lighting conduit and base/poles, concrete bridge abutments/wingwalls, concrete bridge approaches, pre-fabricated steel truss bike/pedestrian bridge installation, pipe railing installation, channel grading, rip rap installation, ground restoration, pavement markings, erosion control installations, and work zone traffic control signs and devices.
07/30/2026 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
8742 Rutledge Street Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, sanitary laterals, water main, and storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, rain gardens, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking and signing.
07/18/2024 07:00 PM UTC
9546 - Madison Water Utility Olin Ave. Administrative Building Roof Replacement
The work for this project includes replacing the existing 17,000 sq ft. (approximate, contractor to verify area) of shingled roof with a metal panel roofing system.
07/11/2024 07:00 PM UTC
8626 - Olin-Turville Court and E. Lakeside Street Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of sanitary sewer main, culverts, earthwork, base preparation, curb and gutter, asphalt pavement, sidewalk, shared-use path, curb ramps, pavement marking, and restoration.
07/11/2024 07:00 PM UTC
9502 - Warner Park Community Recreation Center Expansion
The work includes removal of some existing exterior walls, excavation for new footings and foundations, construction of a building addition, which includes a gymnasium, with new exterior walls, roofs and interior slabs. Installation of new mechanical, electrical, and plumbing systems, and interior renovations to create new restrooms and a comfort room. Site work including geothermal, landscaping, and parking lot modifications.
06/27/2024 07:00 PM UTC
9372 - Prairie Hills Detention Basin Improvements
The work includes but is not limited to removing 100 cu. yards of existing sediment buildup from the bottom of the Prairie Hills Detention Basin West Cell under an existing maintenance permit, constructing a maintenance access drive off Dorchester Way, constructing three 6’x6’ Storm Access Structures with 6’ sumps connected to existing stormsewer, removal of two inlets, clearing and grubbing, grading and street and site restoration.
06/27/2024 07:00 PM UTC
9521 2024 Playground Improvements
This project consists of installation of new playground equipment and/or nature play features, benches, playground safety surfacing, underdrain, asphalt paths and associated sitework at four (4) City of Madison park locations including Garner Park, Manchester Park, Meadowood Park, and Sherwood Forest Park.
06/27/2024 07:00 PM UTC
8744 - Atticus Way Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of storm sewer structures and pipes, base preparation, curb and gutter, asphalt pavement, sidewalk, street lighting, pavement marking, and signing.
06/27/2024 07:00 PM UTC
9522 - 20 Is Plenty
The work includes providing, hauling, and installing 24” x 30” “Speed Limit 20” signs on residential streets throughout the City of Madison as shown on the provided plan sheets and per the provided detail drawings and bid items specifications.
06/13/2024 07:00 PM UTC
9527 - Madison Water Utility Olin Ave. Administrative Building Roof Replacement
The work for this project includes replacing the existing 17,000 sq ft. (approximate, contractor to verify area) of shingled roof with a metal panel roofing system.
06/13/2024 07:00 PM UTC
8635 - Knutson Drive and Green Avenue Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, installation of storm sewer main and storm sewer structures, adjustment of sanitary sewer man structures, adjustment of water valves, excavation, base course preparation, bridge rehabilitation, curb and gutter, driveway aprons, sidewalk installation, green infrastructure, colored concrete pavement, asphalt pavement, pavement marking and signing.
06/13/2024 07:00 PM UTC
121 - 130 of 1118 Solicitations
1 2 9 10 11 13 15 16 17 111 112