Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9813PlanHolders07102026.pdf (89.8 KB)
Contract 9813 - Overture Center Garage Electrical
2 Documents

Upcoming Solicitations

Number Deadline
9813 - Overture Center Garage Electrical Upgrade
Electrical system upgrades at the Overture Center Garage. Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, concrete slabs, architectural components (new electrical rooms, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement.
07/30/2026 07:00 PM UTC
8708 - Hermina Street Pedestrian-Bike Bridge Over Starkweather Creek
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk & ramps, block retaining wall, lighting conduit and base/poles, concrete bridge abutments/wingwalls, concrete bridge approaches, pre-fabricated steel truss bike/pedestrian bridge installation, pipe railing installation, channel grading, rip rap installation, ground restoration, pavement markings, erosion control installations, and work zone traffic control signs and devices.
07/30/2026 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
8735 - E. Wilson St. and E. Doty St. Reconstruction Assessment District - 2023
The work includes replacement and installation of sanitary sewer pipes and structures, water main, and storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of new bicycle facilities, underground terrace and sidewalk support systems, pavement marking, and signing.
04/04/2024 07:00 PM UTC
9500 - 2024 Rennebohn Park East Tennis Courts
The work includes installing asphalt pavement, including base course for asphalt path and pickleball/tennis courts, installing footings/bases and electrical supply for the court lighting system, installing fencing, gates, net posts, net tie downs and sport court finishing and striping to construct a three (3) court (pickleball and tennis) complex at Rennebohm Park.
04/04/2024 07:00 PM UTC
9506 Warner Park Dog Park Lot Resurfacing
The work includes removing the existing curb and gutter, pulverizing the existing asphalt, installing new concrete curb and gutter, and installing a new layer of asphalt pavement.
04/04/2024 07:00 PM UTC
9509 - 2024 Sport Court Resurfacing
The work includes resurfacing and/or power washing existing basketball and tennis courts including crack sealing, seal coating, and court line painting at three (3) City of Madison project sites including Goodman, Huegel and Quann Parks.
04/04/2024 07:00 PM UTC
8750 - Chip Sealing 2024 - East
The work includes street sweeping and cleaning of all loose material, vegetation and other objectionable material, the protection of inlets and castings and chip sealing.
04/04/2024 07:00 PM UTC
8751 - Repairing and Sealing Pavement Cracks - Local Streets 2024
The work includes routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
04/04/2024 07:00 PM UTC
8752 - Repairing and Sealing Pavement Cracks - Major Streets 2024
The work includes routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
04/04/2024 07:00 PM UTC
9508 - CIPP Water Main Rehabilitation 2024
The work includes mobilization, shoring and maintaining water main access pits. Installing, disinfecting, protecting, and maintaining temporary water service. Traffic control and work site protection. Cleaning, televising, and recording the existing and new water mains. Furnishing and installing a structural CIPP water main liner. Internally reinstating service laterals. Field and laboratory documentation/testing. Site restoration (NOT to include pavement restoration). Delivering submittals and obtaining approvals (both Madison Water Utility and WI-Dept. of Natural Resources) as specified in these Contract documents.
04/04/2024 07:00 PM UTC
8758 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2024
The work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the City of Madison) and associated work.
04/04/2024 07:00 PM UTC
9501 Lake Street Sanitary Sewer Replacement
The work includes removal and installation of sanitary sewer pipes and structures, reconnection of sanitary laterals, trench dewatering, and trench patching of the affect streets.
04/04/2024 07:00 PM UTC
141 - 150 of 1118 Solicitations