How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8739PlanHolders07172025.pdf (109 KB)
Contract 8739 - Tancho Bike & Northeast Pond
9638PlanHolders07172025.pdf (90.5 KB)
Contract 9638 - Country Grove Singletrack
9670PlanHolders06172025.pdf (86.2 KB)
Contract 9670 - MMB Flagpole
4 Documents

Upcoming Solicitations

Number Deadline
9638 - Country Grove Singletrack Trail Improvements 2025
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
07/24/2025 07:00 PM UTC
8739 - Tancho Dr Bike Path & Northeast Regional Pond Repair
The work under this contract shall include, but is not limited to, tree removal, storm sewer pipes and structures, base preparation, curb and gutter, sidewalk spot replacement, asphalt pavement, shared-use path, improvement on pedestrian crossings, pavement marking, signing, and path lighting.
07/24/2025 07:00 PM UTC
9670 - MADISON MUNICIPAL BUILDING FLAGPOLE REPLACEMENT
This contract is for the removal of the existing flagpole and the replacement/installation of two new flagpoles at the entrance of the Madison Municipal Building located at 215 Martin Luther King Jr Blvd. This work includes, but is not limited to, general site and earthwork, general building construction, electrical, and concrete work.
08/21/2025 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
9240 - Fire Station 4 Lighting Retrofit
Fire Station 4 Lighting Retrofit
04/06/2023 07:00 PM UTC
8642 - West Towne Path - Phase 3
Construction of the West Towne Path – Phase 3 from S Junction Road to Commerce Drive, City of Madison. State Project Number is 5992-00-62 (City Project Number is 13014). The project includes the construction of an off-street path on the north-side of Watts Road and Plaza Drive, including reconstruction of the north-side curb and sidewalk to fit the path. The project also includes curb ramps and median island improvements at intersections throughout the project limits.
04/06/2023 07:00 PM UTC
9249 - Madison Senior Center Courtyard
Renovation of the courtyard including demolition of existing features, protection of existing trees, full-depth pavement removals, light fixture removal, storm sewer demolition, excavation, base preparation, footings, concrete pavements, poured in place rubber surfacing, vertical curbing, specialty and pre-manufactured furnishings and features, and landscaping installation including plants, sod, mulches and miscellaneous landscape accessory materials; the project also includes lighting and storm sewer.
03/09/2023 08:00 PM UTC
9285 - CIPP UV Lining Rehabilitation of Sanitary Sewers West Phase 1 - 2023
Trenchless rehabilitation of approximately 12,653 linear feet of sanitary sewer piplelines ranging in size from 6" to 8" diameter using Ultraviolet light cure CIPP system. Prequalification in Category #399 UV Sewer Lining is required.
03/09/2023 08:00 PM UTC
9286 - CIPP UV Lining Rehabilitation of Sanitary Sewers East Phase 1 - 2023
Trenchless rehabilitation of approximately 8,406 linear feet of sanitary sewer pipelines ranging in size from 8" to 18" diameter using Ultraviolet light cure CIPP system. Contractor performing work is required to be prequalified under Category #399, UV Sewer Lining.
03/09/2023 08:00 PM UTC
8875 - Lower Badger Mill Creek Flood Mitigation
Work includes, but is not limited to: Clearing & grubbing, channel excavation, pond excavation and dredging, maintenance path base course, installation of storm pipe and structures, installation of box culvert wingwalls and apron, bridge construction, and restoration.
03/09/2023 08:00 PM UTC
9299 - 2023 Semi-Permanent Epoxy Pavement Marking
Furnishing and application or removal of epoxy pavement markings at location throughout the City of Madison.
03/09/2023 08:00 PM UTC
8713 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 18) - 2023
Repair work primarily throughout the 18th Aldermanic District. Horizontally sawcut/grind sidewalk to eliminate trip hazards. Additional horizontal sawcutting/grinding may be required within the project limits of City of Madison Reconstruction Projects and may be city wide as part of the Sidewalk Request Program.
03/09/2023 08:00 PM UTC
8727 - Bridge Repairs 2022/2023 - Painting Alicia Ashman Pedestrian Bridge
Repainting the Alicia Ashman pedestrian bridge over Campus Drive and Wisconsin and Southern Railroad. Preparation and repainting of all exposed surfaces of carbon steel items on the bridge and approach ramps. See Section 104 of the Contract for Scope of Work.
03/09/2023 08:00 PM UTC
8705 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 12) by the Common Council
Repair work primarily throughout Aldermanic District 12. Replace defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by City of Madison) and associated work. Install new sidewalk and concrete bus pads at locations designated by the Common Council, as directed by the Engineer.