General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
8587 - Tenney Park Beach Shelter
8587 - Tenney Park Beach Shelter
07/13/2023 07:00 PM UTC
8876 - Wexford Pond Dredging
This project is located on the parcel at 1005 N. High Point Rd., Madison, WI.
07/13/2023 07:00 PM UTC
8659 - Hudson Ave., Miller Ave., Willard Ave., Center Ave., and Sommers Ave. Assessment District - 2023
Work shall include, but is not limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, and replacement of storm sewer main and storm sewer structures, excavation, base preparation. curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
07/13/2023 07:00 PM UTC
9333 - Robin Greenway Storm and Grading
9333 - Robin Greenway Storm and Grading
07/13/2023 07:00 PM UTC
9297 - Goodman Library Lighting Upgrade
Complete installation of all building components; the accepted testing, and commissioning of all systems; and the completion, and turn-in of all deliverables as outlined in the plans and specifications.
07/06/2023 07:00 PM UTC
9326 - Door Creek Park Shelter
Door Creek Park Shelter
06/22/2023 07:00 PM UTC
8728 - IT Fiber Install 2023
8728 - IT Fiber Install 2023
06/22/2023 07:00 PM UTC
9327 - 2023 Penn Park Courts
2023 Penn Park Courts
06/08/2023 07:00 PM UTC
8732 - Repairing and Sealing Pavement Cracks - Major Streets 2023
Repairing and Sealing Pavement Cracks - Major Streets 2023
06/08/2023 07:00 PM UTC
8731 - Repairing and Sealing Pavement Cracks - Local Streets 2023
Repairing and Sealing Pavement Cracks - Local Streets 2023
06/08/2023 07:00 PM UTC
161 - 170 of 1087 Solicitations