General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8739PlanHolders07172025.pdf (109 KB)
Contract 8739 - Tancho Bike & Northeast Pond
9638PlanHolders07172025.pdf (90.5 KB)
Contract 9638 - Country Grove Singletrack
9670PlanHolders06172025.pdf (86.2 KB)
Contract 9670 - MMB Flagpole
4 Documents

Upcoming Solicitations

Number Deadline
9638 - Country Grove Singletrack Trail Improvements 2025
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
07/24/2025 07:00 PM UTC
8739 - Tancho Dr Bike Path & Northeast Regional Pond Repair
The work under this contract shall include, but is not limited to, tree removal, storm sewer pipes and structures, base preparation, curb and gutter, sidewalk spot replacement, asphalt pavement, shared-use path, improvement on pedestrian crossings, pavement marking, signing, and path lighting.
07/24/2025 07:00 PM UTC
9670 - MADISON MUNICIPAL BUILDING FLAGPOLE REPLACEMENT
This contract is for the removal of the existing flagpole and the replacement/installation of two new flagpoles at the entrance of the Madison Municipal Building located at 215 Martin Luther King Jr Blvd. This work includes, but is not limited to, general site and earthwork, general building construction, electrical, and concrete work.
08/21/2025 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
8715 - Lake Mendota Drive Assessment District - 2023
Replacement and installation of new storm sewer pipes and structures, installation of concrete sidewalk and curb and gutter, replacement of asphalt pavement, and replacement of driveway aprons.
02/23/2023 08:00 PM UTC
8706 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 18) By the Common Council
Perform repair work primarily throughout Aldermanic District 18. This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the City of Madison), and associated work.
02/23/2023 08:00 PM UTC
9280 - Fire Station 10 Lighting Retrofit
Fire Station 10 is located at 1517 Troy Drive in Madison, WI. This bid shall include the complete installation of all building components; the accepted testing, and commissioning of all systems; and the completion, and turn-in of all deliverables as outlined in the plans and specifications.
02/09/2023 08:00 PM UTC
9269 - 2023 Sport Court Resurfacings
2023 Sport Court Resurfacings
02/09/2023 08:00 PM UTC
8583 - Halo Lane and Twilight Trail Resurfacing Assessment District - 2023
The work shall include, but is not limited to, replacing sanitary sewer, replacing and/or improving storm sewer, removing and replacing concrete curb and gutter, sidewalk and drive aprons, excavation cut, crushed aggregate base course, and asphalt pavement as noted in specifications and plans.
02/09/2023 08:00 PM UTC
8641 - Braxton Place and La Mariposa Lane Assessment District - 2022
The new street construction project limits on La Mariposa Lane are between West Washington Avenue and Braxton Place. The project is approximately 450 ft. in length. The new shared-use path construction project limits are between Braxton Place and Regent Street. The project is approximately 360 ft. in length.
01/26/2023 08:00 PM UTC
9243 - 2023 Semi-Permanent Epoxy Pavement Marking
2023 Semi-Permanent Epoxy Pavement Marking
01/26/2023 08:00 PM UTC
9437 - East Towne Detention Basin Improvements
9437 - East Towne Detention Basin Improvements
01/26/2023 08:00 PM UTC
8692 - Felland Road Reconstruction Assessment District - 2022
8692 - Felland Road Reconstruction Assessment District - 2022
01/26/2023 08:00 PM UTC
9262 - CIPP Wet Lining Rehab of Sanitary Sewers - 2021 (Rebid)
CIPP Wet Lining Rehab of Sanitary Sewers - 2021 (Rebid)
12/22/2022 08:00 PM UTC
171 - 180 of 1053 Solicitations
1 2 14 15 16 18 20 21 22 105 106