General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
9306 - 2023 Penn Park Courts
Installing asphalt pavement, including base course for path and courts, installing fencing, basketball hoops, mini-pitch system, and sport court finishing, striping and site restoration to construct two (2) basketball courts and a mini-pitch at Penn Park.
04/20/2023 07:00 PM UTC
8300 - W. Wilson Street and S. Broom Street Assessment District - 2021 and S. Henry Street Assessment District - 2023
W. Wilson Street and S. Broom Street Assessment District - 2021 and S. Henry Street Assessment District - 2023
04/20/2023 07:00 PM UTC
9312 - Truax Lift Station Replacement
Truax Lift Station Replacement
04/20/2023 07:00 PM UTC
9226 - Phase 2 of CCB City Office Remodels, First and Fifth Floors
9226 - Phase 2 of CCB City Office Remodels, First and Fifth Floors
04/06/2023 07:00 PM UTC
9240 - Fire Station 4 Lighting Retrofit
Fire Station 4 Lighting Retrofit
04/06/2023 07:00 PM UTC
8642 - West Towne Path - Phase 3
Construction of the West Towne Path – Phase 3 from S Junction Road to Commerce Drive, City of Madison. State Project Number is 5992-00-62 (City Project Number is 13014). The project includes the construction of an off-street path on the north-side of Watts Road and Plaza Drive, including reconstruction of the north-side curb and sidewalk to fit the path. The project also includes curb ramps and median island improvements at intersections throughout the project limits.
04/06/2023 07:00 PM UTC
9249 - Madison Senior Center Courtyard
Renovation of the courtyard including demolition of existing features, protection of existing trees, full-depth pavement removals, light fixture removal, storm sewer demolition, excavation, base preparation, footings, concrete pavements, poured in place rubber surfacing, vertical curbing, specialty and pre-manufactured furnishings and features, and landscaping installation including plants, sod, mulches and miscellaneous landscape accessory materials; the project also includes lighting and storm sewer.
03/09/2023 08:00 PM UTC
9285 - CIPP UV Lining Rehabilitation of Sanitary Sewers West Phase 1 - 2023
Trenchless rehabilitation of approximately 12,653 linear feet of sanitary sewer piplelines ranging in size from 6" to 8" diameter using Ultraviolet light cure CIPP system. Prequalification in Category #399 UV Sewer Lining is required.
03/09/2023 08:00 PM UTC
9286 - CIPP UV Lining Rehabilitation of Sanitary Sewers East Phase 1 - 2023
Trenchless rehabilitation of approximately 8,406 linear feet of sanitary sewer pipelines ranging in size from 8" to 18" diameter using Ultraviolet light cure CIPP system. Contractor performing work is required to be prequalified under Category #399, UV Sewer Lining.
03/09/2023 08:00 PM UTC
8875 - Lower Badger Mill Creek Flood Mitigation
Work includes, but is not limited to: Clearing & grubbing, channel excavation, pond excavation and dredging, maintenance path base course, installation of storm pipe and structures, installation of box culvert wingwalls and apron, bridge construction, and restoration.
03/09/2023 08:00 PM UTC
181 - 190 of 1087 Solicitations